RS Mutual Water Company Consolidation Project (Project)

Forecast
1510033-004CState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The State Water Resources Control Board is leading and financing the RS Mutual Water Company Consolidation Project to upgrade water infrastructure in Wofford Heights, specifically serving Maple Lane and Mulberry Lane. The project involves installing approximately 715 feet of new underground waterline, connecting it to the existing waterline along Cypress Lane, and adding 23 one-inch domestic water meters and two hydrants to improve water access and fire protection for the community. All new lines will be placed within the existing unpaved but compacted roadways to minimize disruption. As part of the consolidation, Well No. 1, the current storage tank, and other associated well site facilities will be decommissioned and removed entirely to streamline water service under a more efficient system. The project is identified by number 1510033-004C and was posted as a forecast on May 28, 2026, with oversight managed by the California State Water Board’s Division of Financial Assistance. Abbygayle Guevara, an Environmental Scientist with the State Water Board, serves as the primary point of contact for inquiries regarding the project.

General Info

State Water Board funds 715-foot waterline upgrade, adds 23 meters and hydrants, decommissions Well No. 1 in Wofford Heights.

Agency

California → SWRCB, Division of Financial Assistance

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → SWRCB, Division of Financial Assistance
Contacts1 person available
OfficeN/A
Organization / Agency
California → SWRCB, Division of Financial Assistance
Office AddressN/A
Contacts
Abbygayle GuevaraEnvironmental Scientist

Full Description

Show more
The State Water Resources Control Board (State Water Board) is the Lead Agency for the Project. The State Water Board is financing the Project. The Project includes the installation of new waterlines and hydrants to the communities on Maple Lane and Mulberry Lane in Wofford Heights. The Project would connect the new waterline along Maple Lane and Mulberry Lane to an existing waterline that runs through Cypress Lane. Approximately 715 feet (0.14 mile) of new waterline and an apparatus would be installed as well as 23 1-inch domestic water meters and two hydrants on the existing waterline parallel to Cypress Lane. Waterlines would be placed underground within the existing roads, which are unpaved but compacted and well-established. The Well No. 1, the existing storage tank, and other well site facilities will be destroyed and removed. PROJECT NUMBER: 1510033-004C

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To achieve a fully functional system, the project requires a wide array of materials and services, including AC paving, trucking, jack and bore operations, cold planing, piping and fittings, traffic control, demolition, and preconstruction video services. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested parties must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer of Norstar Plumbing and Engineering, Inc. All work must be performed in strict accordance with the project bid documents and specifications provided via the Inland Empire Utilities Agency bidding website.
Norstar Plumbing and Engineering, Inc

POSTED

about 1 hour ago

DEADLINE

in 7 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS