Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on April 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Runoff Capture and Water Quality Improvements at Various Locations Project# 428-81059

Closed
2025-1020State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334513
New
DIBBS
TRANSMITTER, LIQUID QUA
Solicitation # SPE4A5-27-Q-0074
Solicitation SPE4A5-27-Q-0074 is a fixed-price request for quote issued by DLA Aviation for the procurement of 11 liquid quantity transmitters, identified as NSN 6680-01-218-5240 and manufacturer part number 20028-0000-01 from Simmonds Precision Products Inc. This is designated as a critical application item for a commercial-type product. The required delivery date is 376 days after the order is placed, with the destination for both inspection and acceptance being DLA Distribution San Diego. The contract mandates strict adherence to the DLA Master List of Technical and Quality Requirements, which takes precedence over ASTM D3951 packaging standards. All shipments must be marked and labeled per MIL-STD-129 and palletized according to RP001. Quality assurance involves sampling methods per MIL-STD-1916 or ASQ H1331, with acceptance requiring zero non-conformances if MIL-STD-105/ASQ Z1.4 is utilized. Award determination will be based on a comparative assessment of price and non-price factors, with significant weight placed on SPRS assessments, historical quality, and delivery compliance. Administrative requirements include electronic invoicing and receiving through the Wide Area WorkFlow system. The contractor must comply with various federal and defense regulations, including CMMC Level 2 self-assessment, safeguarding of covered defense information, and Buy American program standards. Item Unique Identification is not required for this procurement.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER OEM DIVISION

POSTED

about 24 hours ago

DEADLINE

in 22 minutes
NAICS: 334513
New
Federal
Peel 3 3D Scanners and Software BPA
Solicitation # N0016727Q1010
The Naval Surface Warfare Center, Carderock Division (NSWCCD) is establishing a Blanket Purchase Agreement (BPA) for the procurement of Peel 3D handheld scanner systems, associated licenses, and accessories. This small business set-aside contract, identified as solicitation N0016727Q1010, has a total period of performance of five years, spanning from December 9, 2026, to December 14, 2031. The scope includes the provision of the newest generation of Peel scanner models, which must feature a laser source, a scan accuracy of up to 0.05mm, and a weight of less than 3lb. To meet security requirements, the systems must be capable of hardwired Ethernet connections and are strictly prohibited from having wireless connectivity. Deliverables also include rugged, watertight, crushproof, and dustproof cases, as well as docking systems and V.I.Peel plan renewals. The government will award the contract to the responsible quoter whose technically acceptable quote is most advantageous, considering price and past performance. Technical acceptability is determined on a pass/fail basis. The BPA has a government maximum order ceiling of 350,000.00 USD, with a maximum allowed per order of 349,000.00 USD. All items must comply with MIL-STD-130 for unique item identification and MIL-STD-129 for shipping and labeling. Administrative requirements include the use of Wide Area WorkFlow (WAWF) for invoicing and strict adherence to various FAR and DFARS clauses regarding supply chain risk, cybersecurity reporting, and the prohibition of covered defense telecommunications equipment. Performance is primarily based at the NSWCCD West Bethesda location in Maryland.
Nswc Carderock

POSTED

1 day ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The City of Pomona is seeking bids from qualified firms to undertake the "Runoff Capture and Water Quality Improvements at Various Locations" project, with an estimated value of $500,000. The scope of work includes providing all necessary materials, equipment, tools, labor, and incidentals to complete the project according to the specifications and contract documents. The project aims to enhance water quality and runoff management across multiple locations within the city. The work must be completed within 70 consecutive working days for the base bid and an additional 20 days if the additive alternate is awarded, with prorated days if only part of the alternate is selected. All work, including invoicing, punch list completion, warranties, bonding, start-up training, and submission of operation and maintenance manuals, must be finalized by June 30, 2025. The contract emphasizes comprehensive project completion, including landscape maintenance for 90 days post-construction, and requires adherence to all contractual obligations before the specified deadline. The project is managed by the City of Pomona, with Sonia Gil serving as the primary contact for inquiries.

General Info

The City of Pomona (the City) is soliciting bids from firms for “Runoff Capture and Water Quality Improvements at Various Locations – Project No. 428-81059.”The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required in the specifications and contract documents, for the following project: for “Runoff Capture and Water Quality Improvements at Various Locations, Project No. 428-81059.” The Engineer's Estimate for this project is $500,000.00.COMPLETION OF WORK: All work to be done under this subsequent contract shall be completed within 70 consecutive working days for all the base bid work and 20 consecutive working days for all the additive alternate work (if awarded), and if only a portion of the additive alternate work is awarded the allowed additive alternate working days will be prorated based on the dollar amount) beginning on the date stipulated in the written Notice to Proceed issued by the City Engineer. All base bid work to begin on the date stipulated in the written Notice to Proceed issued by the City Engineer. All base bid work shall be completed concurrently with additive alternate work. ALL work, invoicing, associated punch list, reimbursements, warranties, bonding, guarantees, provide start up training to City (irrigation system, controllers, etc.), submittals of O&M manuals, 90-day landscape maintenance period, retention release, and all associated contract requirements shall be completed before June 30, 2025.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • RFP OP-32095-AS (Supply of Multi Gas Detector at PSO Habibabad Depot)Open now, due in 6 days
  • THERMOMETER, SELF-INDICOpen now, due in 3 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Pomona
Contacts1 person available
OfficeN/A

Full Description

Show more
The City of Pomona (the City) is soliciting bids from firms for “Runoff Capture and Water Quality Improvements at Various Locations – Project No. 428-81059.”The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required in the specifications and contract documents, for the following project: for “Runoff Capture and Water Quality Improvements at Various Locations, Project No. 428-81059.” The Engineer's Estimate for this project is $500,000.00.COMPLETION OF WORK: All work to be done under this subsequent contract shall be completed within 70 consecutive working days for all the base bid work and 20 consecutive working days for all the additive alternate work (if awarded), and if only a portion of the additive alternate work is awarded the allowed additive alternate working days will be prorated based on the dollar amount) beginning on the date stipulated in the written Notice to Proceed issued by the City Engineer. All base bid work to begin on the date stipulated in the written Notice to Proceed issued by the City Engineer. All base bid work shall be completed concurrently with additive alternate work. ALL work, invoicing, associated punch list, reimbursements, warranties, bonding, guarantees, provide start up training to City (irrigation system, controllers, etc.), submittals of O&M manuals, 90-day landscape maintenance period, retention release, and all associated contract requirements shall be completed before June 30, 2025.

More opportunities from California → City of Pomona

Same awarding agency

NAICS: 237110
SLED
Reservoir No. 2C Repairs And Safety Improvements
Solicitation # 2026-1008
The City of Pomona is soliciting professional engineering services for the Reservoir No. 2C Repairs and Safety Improvements project located in Claremont, California. The scope of work encompasses project management, the development of 90% design and bid-ready drawings, and construction support, including the review of RFIs, contractor submittals, and change orders. All final deliverables must be stamped and signed by California licensed Professional Engineers. The project includes specific technical requirements for hazardous waste handling according to 22 CCR Division 4.5 and strict geotechnical standards, requiring compaction of at least 90 to 95 percent relative compaction per ASTM D1557 and Green Book standards. Additionally, the contractor must ensure compliance with the Americans with Disabilities Act (ADA) as the site is currently on probation for violations. Proposals are evaluated based on a scoring system that prioritizes the project approach and methodology (40 points), qualifications and experience (20 points), and technical skills (10 points). Pricing must be submitted in a separate file and is reviewed only after the technical evaluation to determine price reasonableness. The contract requires monthly invoicing with a 30-day payment term and mandates compliance with California Prevailing Wage Laws for public works. Applicants must submit their proposals electronically via PlanetBids by November 18, 2026, providing two separate files: a technical proposal and a separate pricing proposal. Required documentation includes an Executive Order N-6-22 Certification, a Minority Business Questionnaire, and a Statement of Non-Collusion.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS