Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on June 8, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rusk County, WI Wetlands Restoration Program (WRP) Construction Project consists of 4 work sites

Awarded
AG-5F48-S-12-0005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the complete rehabilitation and improvement of the Pennsauken Community Pool under solicitation number 2026-BID-15. The scope of work includes significant structural improvements to the pool, the demolition and construction of the pool mechanical room, electrical upgrades, and the installation of plumbing and other general complex upgrades. Specific deliverables include reinforced concrete flooring and walls, sandblasting the pool interior, and the installation of two 25 by 25 foot shade structures. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction, the Americans with Disabilities Act of 1990, and New Jersey Prevailing Wage Act requirements. Bids must be submitted electronically via the OpenGov Procurement Portal by November 10, 2026, at 10:30 AM. The contract will be awarded to the lowest qualified responsible bidder. Submission requirements include a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, a Certificate of Non-Debarment, and signed acknowledgments for Addenda 01 and 02. The successful contractor must provide a performance bond within three days of the contract award. The initial contract period is one year, with a possible one-year extension upon mutual agreement. Payment will be processed through the Township Governing Body following certification by the Township Engineer and the submission of itemized invoices and certified payrolls.
Procurement

POSTED

about 17 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The Rusk County, WI Wetlands Restoration Program Construction Project involves specialized earthwork and infrastructure improvements across four distinct work sites. Key activities include the construction of an 1110-foot embankment with a rock chute spillway and ditch plugs at Site 1, the creation of small embankments, scrapes, and a ditch plug at Site 2, and the reinforcement of a sheet pile weir structure using a coffer dam at Site 3. Additionally, Site 4 requires the repair of an existing ditch plug to restore its original dimensions. All sites require the use of designated borrow areas for fill material and the seeding of all disturbed areas upon completion. The project is governed by solicitation number AG-5F48-S-12-0005 and falls under NAICS code 237990. The total period of performance for the construction is 35 calendar days. Administrative oversight is provided by Contracting Officer Tamara M. Lanier and Contract Specialist Pam Hubacher.

General Info

Agency

N/A

Contract Value

$49,550

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Rusk County, WI, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

3 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Tamara M. LanierContracting Officer
Pam HubacherContract Specialist

Full Description

Show more
The Rusk County, WI Wetlands Restoration Program (WRP) Construction Project consists of 4 work sites. Site 1: Jiskra, Jones, Hodowanic & Wadewitz Group - construction of 1110' long embankment with a rock chute spillway that has a light gauge sheet pile cutoff - construction of two ditch plugs - fill for the embankment and the ditch plugs will be excavated from designated borrow/scrape areas, which will be located adjacent to each structure - existing culvert in the ditch will be removed and disposed of off-site - clearing and grubbing needed to access and complete construction at the ditch plug sites - upon completion of construction, all disturbed areas will be seeded Site 2: Kruppe - construction of three small embankments and two scrapes on the north ditch - construction of a ditch plug on the south ditch - fill for the three small embankments and the ditch plug will be excavated from designated borrow/scrape areas, which will be located adjacent to each structure - material excavated from scrapes will be spread on adjacent upland areas - clearing and grubbing needed to access and perform construction at the ditch plug site - upon completion of construction, all disturbed areas will be seeded Site 3: Neuhring - excavation of soil on the upstream and downstream sides of the existing sheet pile weir structure and use material to create a coffer dam - area behind the coffer dam dewatered and kept dry during the duration of construction - excavation of fill from designated borrow area on east side of existing embankment and truck over the embankment to the weir structure. This fill material placed on both sides of the weir using manually operated power equipment. After fill placement is complete, coffer dam removed and site reclaimed to original conditions, including seeding disturbed areas. Site 4: Mallo - repair existing ditch plug by excavating fill from borrow/scrape area located adjacent to the plug. Use fill to restore plug to originally constructed dimensions. - upon completion of construction, all disturbed areas will be seeded PROJECT PERIOD OF PERFORMANCE: 35 calendar days. SITE SHOWING: A site showing will occur Wednesday April 25, 2012, 11:30 am. Attendance at the site showing is not mandatory. The site showing is the only time interested participants will have access to the sites. Participants will meet at the site access point identified in Attachment 1, Site Showing Meeting Access Map. There is a field road on Kruppe's property off Lessard Road to the south. Use Kruppe's east access route, see Kruppe's planview (page 4). White NRCS vehicles will be visible at the site access point.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS