Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on April 22, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Russell-Colbath Historic House Floor Stabilization

Awarded
AG-1484-S-16-0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Russell-Colbath Historic House Floor Stabilization project, managed by the Allegheny National Forest, focuses on correcting structural deficiencies in the floor supports and restoring specific interior elements. The scope of work includes repairing previous sill and joist failures by installing positive lateral and vertical connections using Simpson fasteners, solid wood blocking, and new treated shims. Additionally, the project requires the installation of pressure-treated support posts to replace undersized hewn spruce girts near the cellar staircase to ensure long-term stability. Beyond structural stabilization, the contract mandates the removal of compromised 20th-century kitchen floorboards, replacing them with period-correct vintage Northern Red Pine and machine-cut nails to restore aesthetic accuracy. The project also addresses the stone chimney base, requiring the rectification of undermined hearth stones on the south side using original or matching foundation stones to prevent further deterioration. While the chamber floorboards are not a structural priority, the contract allows for their restoration to match the kitchen's historical standards.

General Info

Contract Value

$20,400

NAICS

238130 - Framing Contractors

Place of Performance

12.5 miles west on the Kancamaugus Highway from Conway, ALBANY, NH, 03818, USA

Set-Aside

NONE

Award Issued Date

Documents

5

AG-1484-S-16-0007.pdf

PDF

Attch_1_SOW-Russell-_Colbath_House_1830_revised.pdf

PDF

Attch_2_PLAN_Russell_Colbath_Framing.docx

DOCX

Attch_3_Vicinity_Map.pdf

PDF

Attch_4_DBWD_NH160001_010816_NH1_Residential_Carroll_Co.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseAwarded
Posted

Combined Synopsis

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Allegheny National Forest
Contacts1 person available
OfficeWARREN, PA, 16365, USA
Office AddressWARREN, PA, 16365, USA
Contacts
Alan J. ZeroContracting Officer

Full Description

Show more
A. Correct all of the shortcomings of the previous sill repair, joist repair and the additional supporting girts/piers. The existing, newer repairs as mentioned, were completed without any regard to historic aesthetics and the proposed repairs, as suggested herein, will continue with that approach. This is a 'budget' suggestion which will suffice for a very long time. 1. Install positive lateral connections between the girts and joists. a. Jack / straighten, disconnect/reconnect as needed. Simpson joist hangers, side clips, straps, plates................ http://www.strongtie.com/ b. Where feasible additional solid wood blocking alternative. c. Timberlok, Ledgerlok, Simpson fasteners. [Continuous] 2. Install positive vertical connections at the newer, additional girts to all of the supported joists. Jack / straighten as needed. [Continuous] a. Replace all loose, compromised shims with new treated material and a positive connection. [Continuous] b. Attach solid wood blocking and/or Simpson truss plates, straps, clips. c. Timberlok, Ledgerlok, Simpson fasteners. [Continuous] 3. Install additional supports at the existing, original, interior girt @ the which adjacent to the existing cellar staircase. Jack / straighten as needed. a. Existing 7"X7" hewn, Black Spruce which is extremely undersized for the existing span. b. Pressure Treated SYP 4"X 6" X 32"H +/- posts with standard connections. B. Remove / replace the inaccurate, structurally compromised, 20th C., kitchen floor boards. This is a structural and aesthetic correction. 1. The existing original sub flooring shall remain as is. 2. Period correct, vintage, Northern Red Pine, full span/length flooring shall be reinstalled. [10% or under moisture content recommended.] 3. Period correct, vintage, early machine cut nails. [Continuous] C. The chamber floor boards do not pose any structural concerns. However, these could altered in the same manner as the kitchen suggestion [above] for a more accurate look. D. The stone chimney base was compromised when the vestibule floor was rebuilt and / or when the fireplace was reconstructed. Regardless, the hearth stones have been undermined on the south side and need to be rectified before the deterioration expands. Most of the altered stones remain in the basement, however, some addition pieces will be needed. Perhaps some of the original foundation stones remain on site.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS