Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Ruthville Wastewater Plant Replacement

Open
IFB-131824State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ruthville Wastewater Plant Replacement project, solicited by Charles City County, Virginia under solicitation number IFB-131824, involves replacing the existing wastewater treatment plant serving the Ruthville Service Area and upgrading the associated collection system. The scope of work includes installing two low-pressure grinder pump stations with a 2-inch force main leading to a buried 10,000-gallon Flow Equalization Tank. Treatment facilities will feature an owner-furnished Fluidyne Integrated Surge Anoxic Mix (ISAM) system on a concrete pad, an elevated walkway, a chlorine contact tank with chlorination and dechlorination tablet feed systems, and a 10-foot by 14-foot prefabricated building for electrical, control, and alkalinity chemical feed systems. A critical requirement of the project is that the existing wastewater treatment plant must remain in continuous operation until the new facilities are successfully started up, tested, and accepted. Following acceptance, the contractor will demolish and abandon designated portions of the old plant. All construction must comply with Virginia Department of Environmental Quality regulations, the National Electrical Code, and manufacturer recommendations. The contractor is responsible for obtaining all necessary local permits and bonds at their own expense and must coordinate a pre-construction conference with the engineer. This solicitation is open for responses until December 17, 2026, and there is no specified set-aside status.

General Info

Contract to replace Ruthville Wastewater Plant and upgrade collection systems in Virginia.

Place of Performance

Charles City, VA, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this firstspecifications
High

Read the document

Due in 29 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 29 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVirginia → Charles City County
Contacts1 person available
OfficeN/A

Full Description

Show more
The Project generally consists of replacing the existing wastewater treatment plant (WWTP) serving the Ruthville Service Area of Charles City County and associated upgrades to the collection system. The work includes the installation of two low-pressure grinder pump stations with associated piping, equipment, and a 2-inch force main conveying flow to a buried 10,000-gallon Flow Equalization Tank. Treatment facilities include an Owner-Furnished Fluidyne Integrated Surge Anoxic Mix (ISAM) treatment system installed on a cast-in-place concrete pad, an elevated walkway surrounding the treatment tank, and a chlorine contact tank with chlorination and dechlorination tablet feed systems. A 10-foot by 14-foot prefabricated building shall be provided to house electrical and control panels and the alkalinity chemical feed system. The Contractor shall review the construction sequencing requirements shown on the Contract Drawings prior to bid submission, as the proposed treatment facilities are located adjacent to the existing plant. The existing wastewater treatment plant shall remain in operation throughout construction. Following successful startup, testing, and Owner acceptance of the new facilities, the Contractor shall demolish and abandon designated portions of the existing wastewater treatment plant as indicated in the Contract Documents.

Similar Contracts

Same NAICS industry code

More opportunities from Virginia → Charles City County

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS