Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on September 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RWP Independent Air Supply

Closed
FA9101269IASFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Arnold Engineering Development Complex at Arnold Air Force Base, Tennessee, is seeking white papers for the Independent Air Supply project under the authority of 10 U.S.C. section 4022. The objective is to establish a secondary, dedicated, and conditioned air supply for an existing test cell. The scope of work includes the demolition of existing equipment and the design, procurement, fabrication, and installation of a system featuring at least four modular compressor units, dryers, heaters, expansion turbines, and a final mixing chamber. The system must integrate with base utilities and utilize a local control network featuring Emerson RX3i PLCs, Proficy Machine Edition programming, and a Simplicity HMI interface capable of supporting simultaneous unclassified and classified operations. The government may award up to two prototype agreements, with a preference for base milestone pricing around 250,000 dollars, though this is not a strict ceiling. All final engineering drawings and analyses must be stamped by a Professional Engineer licensed in Tennessee, and air purity must comply with ISO 8573-1 Class 1P. Evaluation of submissions will involve a go/no-go compliance check followed by a qualitative review of technical capability, schedule feasibility, and cost realism. The submission deadline for white papers has been extended to September 23, 2026. Interested parties must verify their CAGE code, Joint Certification Program, and CMMC status to access export-controlled Distribution D documents.

General Info

White papers for secondary conditioned air supply system at Arnold Air Force Base.

NAICS

541330 - Engineering Services

Place of Performance

0, TN, 37389, USA

Set-Aside

NONE

Documents

4

Appendix C – AEDC Standards / AAFB Engineering Standard T-1

PDF, High priority: read this firstsow
High

RWP Independent Air Supply

PDF, High priority: read this first7 pages · rwp
High

SOO 16873-26-001 Appendix B Design Review Expectations

PDF, High priority: read this first46 pages · sow
High

SOO 16873-26-001 - Statement of Objectives, Independent Air Supply

PDF, High priority: read this first3 pages · sow
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Notice updated

Response deadline changed from Sep 18, 2026 to Sep 23, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA9101 Aedc Pkp Procrmnt Branch
Contacts2 people available
OfficeARNOLD AFB, TN, 37389-1332, USA
Office AddressARNOLD AFB, TN, 37389-1332, USA
Contacts
Paytonne Szatkowski

Full Description

Show more

8 Sept 26 - White Paper submission deadline has been extended to 23 September.
_________________________


Request for White Papers
Project Title: Independent Air Supply
Authority: 10 U.S.C. § 4022
Primary NAICS Code: 541330 — Engineering Services (Military and Aerospace Equipment)
Primary PSC Code: 4310 — Compressors and Vacuum Pumps


Arnold Engineering Development Complex (AEDC) at Arnold AFB, TN, is issuing this Request for Whitepapers (RWP) through the AEDC Velocity Alliance Consortium and SAM.gov. The strategic objective of this project is to establish an independent, secondary, and dedicated conditioned air supply to an existing test cell.

The scope of this project encompasses all design, analysis, procurement, documentation, fabrication, installation, inspection, demonstration, and testing necessary to provide a complete and functional pressure and temperature-controlled air supply to the test cell.

The Government reserves the right to award up to two prototype agreements for the initial proof of concept milestones (1-3).

Note to interested parties: Some documents in this posting are labeled Distribution D and export controlled. For access to these requirements, contact the Contracting/Agreements Officer with your company's CAGE. Once Joint Certification Program and CMMC status are verified, the documents will be sent via DoD SAFE.

More opportunities from Department Of Defense → FA9101 Aedc Pkp Procrmnt Branch

Same awarding agency

NAICS: 236220
New
Federal
RWP - Test Site 2 (TS2) Improvements & Modernization, Aerospace Vehicle Survivability Facility (AVSF)
Solicitation # FA9101269TS2
The Department of the Air Force, through the Arnold Engineering Development Complex, is seeking whitepapers for the modernization of Test Site 2 (TS2) at the Aerospace Vehicle Survivability Facility located at Wright-Patterson Air Force Base, Ohio. This project, pursued under Other Transaction Authority 10 U.S.C. section 4022, aims to provide the United States Air Force with a state-of-the-art facility for conducting Live Fire Test and Evaluation on aerospace systems against advanced kinetic threats. The scope of work includes the design, fabrication, and installation of a steel superstructure measuring approximately 24 by 50 by 50 feet with an elevated platform, a 25-ton bridge crane, a 5-ton monorail system, and a comprehensive fuel containment and recovery system featuring a 1,000-gallon catch pan and a 6,000-gallon recovery tank. Submissions will be evaluated based on technical competency, risk management, and cost and price realism of the provided Rough Order of Magnitude estimates. To satisfy statutory OTA requirements, the government requires that all significant participants be small businesses or nontraditional defense contractors, with at least one nontraditional defense contractor or nonprofit research institution participating significantly. Additionally, non-federal sources must provide at least one-third of the total prototype project cost. Selected performers must adhere to AISC, ACI, OSHA, ASME, and CMAA standards, and demonstrate strict compliance with defense cybersecurity requirements, including CUI and CMMC standards. The project will be executed through a series of milestones ranging from initial geotechnical studies and design reviews to final functional verification and the delivery of as-built documentation.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in 27 days
View Details
NAICS: 541330
New
Federal
Request for Whitepapers: AEDC Velocity Alliance - A Multi-Billion Dollar OTA Consortium Opportunity
Solicitation # FA9101-26-9-Velocity_Alliance
The AEDC Velocity Alliance is a strategic consortium-based initiative established by the Department of the Air Force, through the Air Force Test Center and Arnold Engineering Development Complex, to accelerate the modernization, restoration, and sustainment of critical national test infrastructure. Operating under the authority of 10 U.S.C. 4022, this multi-billion dollar portfolio utilizes Other Transaction Agreements (OTAs) rather than standard FAR-based contracts to provide an agile contracting vehicle for next-generation defense systems. The program encompasses 15 technical categories, including general and industrial construction, high-pressure process systems, high-voltage electrical infrastructure, and advanced mechanical or instrumentation engineering services. A near-term pipeline for Fiscal Years 2026 and 2027 is estimated at approximately 550 million dollars across 135 planned projects. To join the Alliance, qualified vendors must undergo a phased onboarding process involving the submission of a whitepaper, government evaluation, and a mandatory site visit or virtual industry day. A critical requirement for membership is the demonstration of partnership capability; applicants must identify a partner that qualifies as a Non-Traditional Defense Contractor, Small Business, or Nonprofit Research Institution to satisfy statutory conditions. Additionally, prime members must prove cybersecurity compliance through a validated CMMC Level 2 certification or a current NIST SP 800-171 assessment in SPRS. Once established, all project opportunities will be competed exclusively among Alliance members, with the majority of awards anticipated to be based on Best Value considerations.
Engineering Services

POSTED

5 days ago

DEADLINE

in almost 4 years
View Details
NAICS: 541330
New
Federal
Request for Whitepaper - AEDC Facility Digital Twins and Predictive Analytics
Solicitation # FA910126RWP-DigitalTwins
The Department of the Air Force is seeking innovative solutions through a Request for Whitepapers to establish an Other Transaction Agreement under 10 U.S.C. section 4022 for the Arnold Engineering Development Complex (AEDC) Facility Digital Twins and Predictive Analytics project. This multi-year initiative aims to modernize facility documentation by creating high-fidelity, engineering-grade 3D digital twins of critical infrastructure. The initial phase, scheduled for Fiscal Year 2027, focuses on the Von Karman Gas Dynamics Facility (VKF), with plans to eventually scale the methodology across more than 2.5 million square feet of facility footprint. Technical requirements specify a minimum Level of Detail (LOD) of 350/400 and a dimensional accuracy of +/- 1/4 inch, utilizing Autodesk Revit for architectural and structural models and Autodesk Plant 3D for intelligent process models. As an Other Transaction Agreement, this effort is not subject to the Federal Acquisition Regulation, though it requires compliance with 31 U.S.C. section 1352 and DPAS regulations. All work must be performed within the continental United States, and performers must adhere to strict cybersecurity standards, including NIST SP 800-171 and CMMC Level 2 self-standards, as all project data is handled as Controlled Unclassified Information. Submissions are evaluated based on technical merit, program management, scalability, and cost realism. The pricing structure consists of a firm-fixed-price base phase with milestone-based payments and separate priced or rough order of magnitude option phases. Interested parties must maintain active SAM registration and a valid Joint Certification Program certification to access export-controlled data.
Engineering Services

POSTED

5 days ago

DEADLINE

in 1 day
View Details
NAICS: 334418
New
Federal
PC 104 Single Board Computer
Solicitation # FA9101_PC104_SingleBoardComputer
The Department of Defense, through the FA9101 Aedc Pkp Procurement Branch, is soliciting quotes for the procurement of two PC 104 Single Board Computers and associated hardware to support the 746th Test Squadron. Specifically, the requirement includes two ENETX-MA4-2F4 Converter Appliances and four corresponding interface cable assemblies for power, MIL-STD-1553, and ARINC-429 communications. These components are critical for the integration, maintenance, and troubleshooting of the Ultra High Accuracy Reference System and customer Units Under Test. The hardware must be genuine OEM Alta dt parts and comply with VITA 47 and MIL-STD-810 standards, requiring 5-32 VDC conditioned power. This is a firm-fixed-price contract set aside for small businesses and women-owned small businesses, with a specific price evaluation preference for HUBZone small business concerns. Award will be granted to a responsible source that is technically acceptable and provides a fair and reasonable price. Deliveries are specified as FOB Destination to Holloman AFB, New Mexico, with a required delivery schedule of 10 weeks from the date of award receipt. Contractors must utilize the Wide Area WorkFlow system for electronic invoicing and adhere to MIL-STD-129 and MIL-STD-130 for packaging, marking, and unique item identification. Quotes must be submitted electronically by October 28, 2026, and must be divided into administrative/price and technical capability sections.
Printed Circuit Assembly (Electronic Assembly) Manufacturing

POSTED

7 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS