Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on April 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

S. Pecan St. Water System Improvements

Closed
PE-66991-NONST-2026-000000007State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The City of Washington/Wilkes County is soliciting sealed electronic bids for the construction of the S. Pecan St. Water System Improvements project. Bids must be submitted by May 6, 2026, at 2:00 PM local time through QuestCDN.com, with no paper submissions accepted. Late bids will be disqualified, and submitted bids cannot be withdrawn for 60 days following the deadline unless allowed by law or bid instructions. Shortly after bid submission closes, all base bid costs will be posted on the QuestCDN website. The project involves installing approximately 3,900 linear feet of 6-inch and 2-inch PVC/DIP water mains, including fire hydrants, valves, driveway replacement, earthwork, grassing, and erosion control, with all necessary appurtenances for completion. Materials will be supplied by the Owner, and the contractor must complete the work within 150 consecutive calendar days according to the provided plans and specifications. The contract will be awarded as a single contract. Digital plans and contract documents are accessible for free viewing or for purchase on QuestCDN, with associated fees for downloading and bid submission. For further assistance or inquiries, bidders may contact QuestCDN support or the project’s primary contact, Patricia Rice.

General Info

Washington/Wilkes County seeks electronic bids by May 6, 2026, for water system improvements.

Documents

1

Invitation to Bid for S. Pecan St. Water System Improvements

PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Washington
Contacts1 person available
OfficeN/A
Organization / AgencyGeorgia → City of Washington
Office AddressN/A

Full Description

Show more
Sealed bids for construction of the S. Pecan St. Water System Improvements for the City of Washington/Wilkes County will be received until May 6, 2026 at 2:00PM local time. Bids must be submitted electronically through QuestCDN.com. No paper submissions will be accepted. Base Cost of all Bids shall be published to the QuestCDN website no later than 30 minutes after the closing time. Any bid received after said time and date will not be considered by the Owner. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days except as specifically may be provided in the Instructions to Bidders and/or by State law.
The Work to be completed shall consist of furnishing all labor and equipment to install approximately 3,900 LF of 6" and 2" PVC/DIP water main including, but not limited to fire hydrants, valves, driveway replacement, earthwork, grassing, soil erosion and sedimentation control measures, and appurtenances necessary to provide a complete installation. The Owner will provide materials for this Contract. Time allotted for completion of work is 150 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. Complete digital specifications and contract documents are available at www.QuestCDN.com. Bidders may view the digital plan documents for free by entering the Quest project number 10129750 on the website¿s project search page. Bidders can download the digital documents for a fee of $100.00 payable through the website. Bids must be submitted electronically at QuestCDN.com. There will be an additional $42.00 submittal fee. Please contact QuestCDN customer support at +1 (555) 000-0000 or contact@example.gov for assistance in membership registration, downloading and working with digital project information. All other questions may be directed to the issuing office, (See Supporting Documents for complete information.)

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS