Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of The Interior was posted on July 31, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

S--Solid Waste And Recycling Removal, SACN

Awarded
P16PS00859Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562111
New
SLED
2027 FAYETTE COUNTY TRANSFER STATION WASTE HAULING AND DISPOSAL CONTRACT
Solicitation # 49500
The 2027 Fayette County Transfer Station Waste Hauling and Disposal Contract, issued by the Fayette County Engineer in Ohio, requires a contractor to provide all labor, materials, and equipment for the removal, transportation, and disposal of waste from the transfer station located at 1580 Robinson Road, Washington C.H., Ohio. The contract period begins on December 21, 2026, and concludes on December 19, 2027, with provisions for successive automatic one-year extensions. The engineer's estimate for the project is $650,000 per year, and the contract will be awarded to the lowest qualified, responsible, and responsive bidder. Bidders may provide a standard one-year proposal or an alternate three-year proposal based on 16,000 tons per year. Technical requirements mandate that the contractor dedicate four trailers with a minimum capacity of 100 cubic yards and 45 to 48 feet in length, ensuring three trailers remain on site at all times. A shuttle vehicle must be provided, and the contractor must deliver an additional empty trailer within 1.5 hours of notification, or face liquidated damages of $300 per hour. Required securities include a bid guaranty of $65,000 and a 100 percent payment and performance bond of $650,000. Comprehensive insurance is required, including automobile liability with $2.5 million per person/occurrence and $2.25 million for property damage, alongside workers compensation and general liability coverage. Compliance documentation must include a W-9, non-collusion affidavit, and a delinquent personal property tax affidavit.
Fayette County Engineer

POSTED

about 8 hours ago

DEADLINE

in 4 days
NAICS: 562111
New
SLED
IFB 2027-B03 Countywide Dumpsters
Solicitation # IFB 2027-B03
Hays County is soliciting bids under IFB 2027-B03 for a vendor to provide comprehensive dumpster and recycling container services across multiple locations within the county. The scope includes the provision and maintenance of containers ranging from 8 to 40+ cubic yards, which must be rodent, animal, and wind-proof. The contractor is responsible for regular hauls at specified frequencies for locations such as the Administrative Offices, Health Department, and Jail, as well as providing as-needed services for future needs or county-wide disaster declarations. The contract is for an initial term of one year, with the county reserving the right to extend the agreement for up to four additional one-year periods. Award decisions will be based on the lowest unit price bid or the best overall value for the county. Bidders must submit a comprehensive package including a mandatory bid form with per-haul pricing, vendor references, and various state and federal certifications, including those regarding the Israel Boycott and firearm entity non-discrimination. The successful vendor must provide proof of Workers Compensation, Auto Liability, and General Liability insurance and comply with Davis-Bacon Act prevailing wage requirements where applicable. Payments are processed via check or warrant by the County Auditor upon satisfactory delivery and acceptance of services. Other notable terms include a piggyback clause allowing other local government agencies to utilize the agreement and a requirement for a detailed transition plan from the previous provider.
HAYS COUNTY

POSTED

about 14 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

This sources sought announcement, issued by the Department of the Interior's National Park Service through the DSC Contracting Services Division, seeks capability statements from small business vendors for solid waste and recycling removal services at the St. Croix National Scenic Riverway. Operating under NAICS code 562111, the project encompasses the Namekagon, Lower, and Marshland Districts. The government is seeking a contractor to provide comprehensive waste management services, including the provision of containers and the collection, transportation, and disposal of both refuse and recyclables. The scope of work requires adherence to specific seasonal schedules and location-based requirements to ensure efficient waste management across the scenic riverway. This market research effort, identified by solicitation number P16PS00859, was designed to help the agency formulate an acquisition strategy for a potential Firm Fixed-Price contract. The procurement process was managed out of the Denver, Colorado office to identify qualified vendors capable of meeting the environmental and operational needs of the park.

General Info

Small business waste and recycling removal services for St. Croix National Scenic Riverway.

Contract Value

$4,200

NAICS

562111 - Solid Waste Collection

Place of Performance

CO

Set-Aside

NONE

Award Issued Date

Documents

2

SOW - Solid Waste and Recycling Removal at Saint Croix National Scenic Riverway

PDF, High priority: read this firstsow
High

P16PS00859 - SACN Solid Waste and Recycling Removal Sources Sought

PDF, Low prioritysources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseAwarded
Posted

special-notice

Notice updated

Response deadline added: Apr 12, 2016. The notice description changed.

Notice updated

Set-aside added: Total Small Business Set-Aside (FAR 19.5). The notice description changed.

Notice updated

Notice type changed from Special Notice to Combined Synopsis/Solicitation. Response deadline changed from Apr 12, 2016 to Jul 25, 2016. The notice title changed. Set-aside removed. The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
ContactsNo contacts available
OfficeDenver, CO, 80225, USA
Office AddressDenver, CO, 80225, USA
ContactsNo contact information available

Full Description

Show more
The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, labor and other items and services necessary to perform solid waste management for the National Park Service, St. Croix National Scenic Riverway, Namekagon District, Marshland District and Lower District complexes. Solid waste management shall include the collection, transportation, and proper disposal of refuse, debris, garbage, and other allowable solid wastes and recyclable materials. The contractor shall perform to the standards in the contract as well as all Federal, State, and local regulations. Service Locations: Namekagon District facility, W5483 Hwy 63, Trego, WI 54888 Lower District facility, 1009 County Road S, Dresser, WI 54009 Marshland District facility, 15975 Hwy 70, Pine City, MN 55063 For the Namekagon District: The contractor shall supply one (1) Front Load Six Yard (6 Yd.) dumpster for collection of refuse, debris, garbage, and other allowable solid waste items for disposal. The contractor shall also provide one (1) Front Load Two yard (2 Yd.) container for recyclable items. Containers will be labeled or symbolized appropriately. For the Lower District: The contractor shall supply one (1) Front Load Six Yard (6 Yd.) dumpster for collection of refuse, debris, garbage, and other allowable solid waste items for disposal. For the Marshland District: The contractor shall supply one (1) Front Load Six Yard (6 Yd.) dumpster for collection of refuse, debris, garbage, or other allowable solid waste items for disposal. The contractor shall also provide one (1) Front Load Two Yard (2 Yd.) container for recyclable items. Containers will be labeled or symbolized appropriately. Collection requirements: The contractor may use their established vehicle routes and collection schedules to meet the frequency of and satisfy the requirements of this scope of work (SOW). The contractor shall collect refuse and recyclable material during periods of inclement weather. In cases of severe weather exceptions may be made. When exceptions are granted, the contractor shall make up all missed collections within 24 hours after the severe weather has terminated. The contractor shall utilize the route as stipulated by this SOW. In the event the contractor needs to deviate from the established routes or schedules due to severe weather, holidays, break downs, or other circumstances, notice shall be provided to the Contracting Officer¿s Representative (COR) who will be named at the time of award. Spillage: The contractor shall remove/pickup all spillage within a ten (10) foot radius around all collection points regardless of cause. The contractor shall be responsible for immediately cleaning up any spills, debris, etc., which may occur during servicing of containers during collection. Serviceable Material: The contractor shall not collect or dispose of any material which is placed outside of the containers. Supply and Servicing Containers: Collection of refuse and recyclable materials shall be from contractor provided containers. The contractor shall service all containers. The contractor shall be responsible to maintain an adequate backup stock of containers to replace containers no longer serviceable, when performing repairs, painting or cleaning and meet changing requirements. Recycling: Recyclable materials shall be co-mingled. The contractor shall supply and service all recycling containers. At a minimum, recyclable materials shall include: all glass, plastic, plastic bags, tin and aluminum cans, paper, magazines, newspaper, and cardboard. Other materials which the contractor deem allowable may also be included in the recycling containers. The contractor shall prepare and submit proposed recycling handouts. At a minimum, the handouts shall specify acceptable recyclable items and a pick up schedule. Government Responsibility at pick up location: The government shall ensure that the pick-up site and containers are accessible to the vehicle or manner that the contractor utilizes to collect refuse and recyclable materials. Service Location Collection Schedule: A. The Namekagon District facility is located at: W5483 Hwy 63, Trego, WI 54888. The dumpster and recycling bins shall be placed north of the maintenance complex next to the employee parking area within the existing established location. Collection of refuse, debris, garbage, and other allowable solid wastes shall adhere to the following schedule: Once per week during the months of May through October and once every month during the months of November through April. Collection of recyclables shall occur once per month. B. The Lower District facility is located at: 1009 County Road S, Dresser, WI 54009. The dumpster shall be placed within the existing established location. Collection of refuse, debris, garbage, and other allowable solid wastes shall adhere to the following schedule: Once per week during the months of April through September and once every other week (twice per month) during the months of October through March. C. The Marshland District facility is located at: 15975 Hwy 70, Pine City, MN 55063. The dumpster and recycling bins shall be placed within the existing established location. Collection of refuse, debris, garbage, and other allowable solid wastes shall adhere to the following schedule: Once every other week (twice per month) during the months of May through September and once during the months of December and March. Solid Waste removal and recycling shall be pre-coordinated for December and March with the COR as NPS staff are not always present. Collection of recyclables shall occur once per month. All Collections shall occur between regular business hours of 7:00 am ¿ 4:00 pm (central time zone). Collections shall not occur on weekends or Federal Holidays.

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, identified as TIMU-335507, aims to repair and extend a seawall damaged by Hurricane Ian to protect critical cultural and ecological resources. The scope of work is divided into three primary CLINs: the installation of a new weatherable rigid vinyl sheet pile wall with tie rods in front of the existing wall, the extension of the wall eastward using structural FRP composite sheet piles, and comprehensive site restoration including excavation, backfilling, sodding, sea grass restoration, and the installation of limestone riprap. The estimated construction magnitude is between 1 million and 5 million dollars, with a mandatory performance period of 259 calendar days. Award will be determined using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, schedule, and management approach—are significantly more important than price. Contractors must adhere to strict environmental protection protocols to safeguard aquatic species, wetlands, and endangered wildlife, including manatees and sea turtles, in compliance with the Marine Mammal Protection Act and the Endangered Species Act. Additional requirements include adherence to the Davis-Bacon Act for prevailing wages, ADA compliance for public dock walkways, and the use of biodegradable or recyclable packaging. Proposals must be submitted electronically in two volumes by November 13, 2026, and include a bid bond and detailed past performance data.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 15 days
View Details
NAICS: 221320
New
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Sewage Treatment Facilities

POSTED

1 day ago

DEADLINE

in 20 days
View Details
NAICS: 237310
Federal
Z--BRCA 310427 Southbound Shuttle Stop
Solicitation # 140P2026R0065
Solicitation 140P2026R0065 is a small business set-aside for the construction of the Southbound Shuttle Stop at Bryce Canyon National Park, Utah. Managed by the National Park Service Denver Service Center, this firm-fixed-price contract has an estimated value between $1,000,000 and $5,000,000. The scope of work includes shuttle stop improvements, the addition of lanes, culvert installation, trail realignment, retaining wall construction, ADA ramp and sidewalk installation, and the placement of shelters and MUTCD-compliant signage. Due to the project's location, the contractor must implement protective measures for the adjacent UT Prairie Dog Habitat and ensure all equipment is clean and free of contaminants. The performance period is scheduled from May 1, 2027, to September 28, 2027, with a total duration of 150 calendar days following the notice to proceed. Award will be determined using the Best Value Continuum Tradeoff Process, evaluating technical approach, schedule, project experience, key personnel, and past performance alongside proposed pricing. Requirements include the submission of bid, performance, and payment bonds, compliance with Davis-Bacon Act wage determinations, and adherence to OSHA safety standards. Proposals must be submitted electronically in separate technical and price volumes, with a final response deadline of November 3, 2026.
Highway, Street, and Bridge Construction

POSTED

13 days ago

DEADLINE

in 5 days
View Details
NAICS: 237110
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction contract issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The project scope includes the rehabilitation of the rainwater catchment and water treatment systems, the replacement of Building 43 with a new metal building, and the replacement of Building 241 with a new open-air and CMU structure. Additional optional requirements include replacing the perimeter fence, repairing the water treatment system, and replacing ground catchment pavement. The project has a mandatory performance period of 610 calendar days, with primary CLINs scheduled from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating non-price factors such as project experience, technical approach, management approach, and construction schedule against proposed pricing. Bidders must comply with the Davis-Bacon Act for prevailing wages and adhere to Buy American Act and Build America Buy America standards. Technical requirements include ADA compliance, the implementation of a Quality Control Plan, and adherence to specific environmental standards regarding ozone-depleting substances and recycled content. Due to the site's nature, the project involves Section 106 mitigation for historic buildings and requires careful construction phasing to ensure water production is not compromised. Proposals must be submitted electronically, and the awardee will be required to provide performance and payment bonds within 10 days of award.
Water and Sewer Line and Related Structures Construction

POSTED

16 days ago

DEADLINE

in 8 days
View Details
NAICS: 237310
Federal
Z--YELL 338223 - Bridge Preservation
Solicitation # 140P2026R0073
Solicitation 140P2026R0073 is a Small Business Set-Aside for bridge preservation services at Yellowstone National Park, Wyoming, managed by the National Park Service Denver Service Center. The project involves the rehabilitation of three specific bridges: Lava Creek, Thumb Creek, and an Unnamed Creek bridge. The scope of work includes concrete spall and structural repairs, crack sealing, stone masonry repointing, bridge expansion joint maintenance, painting of railings, and the application of epoxy overlays via hydro-demolition. Additional requirements include erosion repair, pavement markings, and strict traffic control. The anticipated period of performance is 155 calendar days from the Notice to Proceed, with an estimated contract value between $1 million and $5 million. The contract will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—specifically technical approach, project experience, key personnel, and past performance—are significantly more important than price. Required key personnel include a Site Superintendent with at least five years of experience and OSHA 30 certification, and a Traffic Control Supervisor with three years of experience meeting MUTCD standards. Contractors must adhere to strict work hour restrictions from 7 AM to 7 PM and comply with environmental protections for wildlife and cultural resources. Performance and payment bonds are required at 100 percent of the contract price, and the project is subject to Davis-Bacon Act labor standards. Proposals are due by October 30, 2026.
Highway, Street, and Bridge Construction

POSTED

16 days ago

DEADLINE

in 1 day
View Details
NAICS: 237110
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming, to provide employee housing. The project scope includes the comprehensive rehabilitation of one lodge, eight cabins, one garage, two outbuildings, and a water well structure. Key technical requirements involve structural repairs, historic preservation, and the installation of new potable water and wastewater systems, including a sanitary sewer collection system and lift station. The project is estimated to exceed 10 million dollars and has a mandatory negotiable performance period of 170 calendar days, with work beginning within 10 days of award. The procurement will be awarded using the Best Value Continuum Tradeoff Process, where non-price factors—technical approach, project experience, schedule, and past performance—are collectively equal in importance to price. Contractors must adhere to strict environmental and safety standards, including the management of lead-based paint and asbestos, compliance with the Davis-Bacon Act, and mitigation of impacts on bald eagle nesting and roosting bats. Proposals must be submitted electronically by November 20, 2026, and must include a detailed technical approach and a phasing plan to minimize park operational disruptions. Required insurance includes general liability of 500,000 dollars and employer liability of 100,000 dollars.
Water and Sewer Line and Related Structures Construction

POSTED

24 days ago

DEADLINE

in 22 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS