Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

S207--BHVAHCS Building 65 Bat Mitigation Sources Sought

Open
36C26327Q0123Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Black Hills VA Healthcare System is seeking vendor capability information through a sources sought announcement for a turnkey bat mitigation and exclusion project at Building 65 in Fort Meade, South Dakota. The scope of work involves the professional, non-lethal removal of bat colonies using one-way exit devices, sealing entry points, and the remediation of the attic area. This includes the removal of bat guano and contaminated insulation, sterilization of the space to prevent histoplasmosis, and the installation of new blown-in cellulose insulation with a value of R49 or greater. All work must comply with the Endangered Species Act, Bat Conservation International, and South Dakota Game, Fish and Parks recommendations. Key performance timelines require bat removal to occur between February 1st and April 15th, 2027, with a strict prohibition on exclusion activities during the pup flightless season from June to August. All guano removal and cleanup must be completed by June 15th, 2027. Interested vendors must submit their contact information, proof of capability, and responses to specific socio-economic and subcontracting questions to [email hidden] by November 30th, 2026. This is a market research effort, and no contract awards will be made directly from this announcement. There is no specified set-aside status for this requirement.

General Info

VA seeks vendors for bat mitigation and attic remediation at Fort Meade.

NAICS

561710 - Exterminating and Pest Control Services

Place of Performance

Black Hills VA Health Care System Fort Meade Medical Center, Fort Meade, MN, 57741

Set-Aside

NONE

Documents

1
DOCX, Low priority6 pages · sources-sought
Low

Read the document

Due in 11 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 11 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseSources Sought
Posted

Sources Sought

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Veterans Affairs → Network Contract Office 23 (36C263)
Contacts1 person available
OfficeSaint Paul, MN, 55101, USA

Full Description

Show more
The Black Hills VA Healthcare System requires bat mitigation and exclusion services in accordance with the draft Statement of Work (SOW) below. This is a sources sought looking for vendors to perform the services per the SOW for market research purposes. No awards of a contract will be made from this announcement. If you are a vendor that can complete the work described in the SOW with competitive pricing, please send your contact and organization information with a descriptive proof of capability to: Sign up to see this detail on or before November 30th, 2026. Only emailed responses will be considered. Additionally, please provide answers as appropriate to the following questions in the table below with your response to this sources sought. Failure to respond to the following questions may affect the acquisition strategy. Question # Questions Vendor Responses 1. Identify your organization's socio-economic category.   2. State whether any of the requested services may be ordered against a government contract awarded to your organization (e.g Federal Supply Schedule (FSS), General Services Administration (GSA), etc.).   3. State if subcontracting is contemplated for this requirement, what percentage of the work will be subcontracted and for what tasks.     *If applicable, VAAR 852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction, will apply to the potential solicitation if set-aside for Veteran Owned Small-Businesses or Service Disabled Veteran Owned Small-Businesses.* *If applicable, FAR 52.219-14 Limitations on Subcontracting, will apply to the potential solicitation if set-aside for Small-Businesses.* Draft Statement of Work (SOW) Building 65 Bat Mitigation Black Hills VA Health Care System at Fort Meade, South Dakota General Intention: Contractor shall provide all supervision, tools, labor, materials, hardware, equipment, transportation, and incidentals necessary to complete a turnkey finished project for the following services: Professional Bat abatement in attic of Building 65. Remove bat colonies, conduct bat proofing/exclusion, remove bat guano and insulation (sterilize as needed), sanitize the area, and reinstall insulation. Building 65 is a 2-story building with the attic above. General Requirements: Contractor shall provide all supervision, labor, materials, equipment, and incidentals necessary to accomplish work elements and requirements outlined in this Statement of Work (SOW). Where equipment, temporary installations, ingress/egress restrictions or any other consideration is necessary, signage in such areas shall be provided by Contractor. The Contractor shall confine all staging activities within the anticipated construction area. Contractor shall coordinate proposed staging areas with the facility representative for approval. The Contractor shall field verify all existing conditions, dimensions, and quantities prior to any work activities. Time and date to be coordinated with facility representative. Any work that is not addressed by the contract shall immediately be brought to the attention of the Contracting Officer. No out-of-scope or additional work shall be executed prior to modification of the contract by the Contracting Officer. Contractor shall remove all rubbish from the Fort Meade property and dispose off site following VA Specification 01 74 19 Construction Waste Management. Contractor shall record all quantities of materials removed from the Fort Meade property and turn into the facility representative monthly reports even if a null report. Contractor to perform all work during normal work hours, Monday through Friday 7:00 am to 4:30 pm Mountain Time except as coordinated with the facility representative for any activities that may need to occur outside of normal working hours at no additional cost to the Government. The requirements of this SOW supplement other related VA standards for construction, space and facility planning criteria, design guides, design manuals, specifications, and details, which remain in full force and effect. Specifically, all requirements of VA handbook 0730, NEC 517, NFPA Health Care Facilities Code for Branches, Security and Law Enforcement, Appendix B, (which covers physical security requirements for VA facilities), the VA fire Protection Design Manual (which covers all VA construction), and ICT standards on the TIL remain in effect. Work Elements: Which shall include and are not limited to: All supervision, tools, labor, materials, hardware, equipment, transportation, and incidentals necessary to complete a turnkey finished project. Bat Exclusion: Bats need to be permanently excluded from roosting in the VA building 65 using non-lethal exclusion methods following Bat Conservation International (BCI), South Dakota Game, Fish and Parks recommendations, and comply with section 7 of the Endangered Species Act. The technique includes using one-way exit devices (industry preferred exclusion tubes VA approved), sealing points of entry, interior and exterior of the building, and preventing access to the building interior. Exclusion activities will be conducted when bats are not present if feasible; this timing will also ensure that activities occur before the Maternity and Roost season. Bat removal shall occur between February 1st, 2027 and April 15th, 2027. Exclusion may not be done when pups are too young to fly (June-August). Change to these timelines may be proposed and accepted after discussion and approval by the designated facility representative(s) and contracting officer. One-way exit devices through which bats can leave but cannot return are made from tube-type excluders which are placed at all active entry points. Exclusion tubes should have a diameter of two inches, a length of 10 inches with a smooth surface and should project no more than one-quarter inch into the opening. Once the tube has been secured over the hole, a piece of lightweight, clear plastic can be taped around the tubes outside end to further reduce the likelihood of bats reentering, though this may not be necessary. Multiple exclusion tubes may be required. Lightweight, flexible plastic netting with one-sixth-inch mesh or smaller can be used to form a one-way valve over openings on smooth surfaces of exterior walls or attic louvers. The one-way exit devices will remain in place for at least five to seven days. The devices will be removed after all bats have been confirmed to be excluded. Night observation and other means, may be needed when determining if bats are still entering or leaving the building. It must be confirmed by visual inspection or other that bats are no longer present. Sealing Exclusion Points Exclusion points will be sealed with OSI silicone sealant, caulk backing rod, hardware cloth or heavy-duty polypropylene mesh, flashing out required areas around roofline with proper metal for optimal coverage. If one-way exit devices have been used, sealing will be conducted after the five-to-seven days that the devices have been in place. Bats can enter buildings or living spaces through openings as small as 3/8 diameter. Focus points include but not limited to trim, soffits, chimneys, and dormers. All metal on the front roofs will be properly sealed and securely screwed down where required to prevent Bat re-entering the building. Appropriate screws designed for metal, equipped with washers to prevent leaks will be used, and sealed to prevent future water damage. Preventing Building Interior Access The building s interior will be inspected for small openings through which bats could enter. Bats can enter buildings or living spaces through openings as small as 3/8 diameter. All openings connecting potential roosting areas to living quarters need to be sealed. Methods not to be used for bat exclusion: Simply waiting for bats to fly out at night and then permanently sealing the entrances without the use of one-way exit devices. Ultrasonic devices, chemical repellents, smoke, canned spray foam, and traps will not be used to evict the bats from the building. Guano, Old Insulation Removal, Cleanup, and Precautions: Bat guano may contain spores of the fungus Histoplasma capsulatum which can cause Histoplasmosis, a respiratory disease. For precautionary purposes during guano cleanup, avoid exposure to histoplasmosis by wearing a respirator capable of filtering particles as small as 2 in diameter or use a self-contained breathing apparatus when cleaning or entering areas with guano. TB-Cide Quat must be applied to the bat guano to neutralize spores and prevent their release during the cleanup process. Extraction of all contaminated insulation and guano will be securely bagged in Hazardous Waste Bages and removed from the premises and disposed off site at an approved location that accepts this type of rubbish. Contractor shall follow the Infection Control Risk Assessment (ICRA) requirements: Perform work activity in a manner that does not create dust. Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system). Ensure worker clothing is clean and free of visible dust before leaving the work area. Seal doors to prevent dust migration. All plastic barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage. Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route. Install a sticky (dust collection) mat at entrance of contained work area. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily. Work under this section shall be completed prior to June 15th, 2027. Cleaning and disinfecting the space: After the bat guano and old insulation has been removed, the space will need to be cleaned and disinfected prior to the installation of new insulation. Maintain Manufactures recommendations for cleaning solutions and chemicals. All must be submitted for VA approval before use. Replacement insulation Insulation will be replaced with blown in Cellulose insulation equal or greater than R49 value after settling. Quality control and Acceptance: QUALITY CONTROL: The Contractor shall have a quality control program to assure the requirements of this contract are completed as specified. The Contractor and facility representative will inspect the work. Deficiencies will be noted and corrected before beginning work in another area. Any damage done by Contractor will also be noted and corrected by the Contractor within 2 working days. Damage causing an immediate impact on the environment or the building shall be corrected immediately. Extensions to repair deadlines are allowable after receiving permission from the Contracting Officer. QUALITY ASSURANCE: The Government will evaluate the contractor's performance under this contract. All surveillance observations will be recorded by the Government. When an observation indicates defective performance, the facility representative will document the defective performance and notify the Contracting Officer. References: References for policies to adhere to during duration of project, available at http://www.cfm.va.gov/til/spec.asp. VA Specifications Federal, State, and Local Government Agencies NFPA PSDRM Building Pictures Post Award Requirements: Project kick-off meeting: The Contractor shall plan for an on-site project kick-off meeting with VA staff to walk the site and review the schedule.

Similar Contracts

Same NAICS industry code

NAICS: 561710
New
Federal
US Forest Service Plumas National Forest Pest Control
Solicitation # 1174190
The United States Department of Agriculture, representing the Plumas National Forest, is soliciting quotations for professional pest control services at the Beckwourth Ranger Station in Blairsden, California. The primary objective is to eliminate an active infestation of mice and rodents across seven buildings and establish long-term preventative mitigation. The scope of work includes a comprehensive initial assessment, eradication using lethal and non-lethal measures, structural exclusion to block rodent entry, ongoing monitoring, and biohazard cleanup of fecal matter. The contractor must utilize durable, rust-resistant materials capable of withstanding extreme mountain temperatures and heavy snow loads, with specific reference products such as Bell Labs Protecta EVO Express, Victor Tin Cat traps, and Xcluder sealants. This acquisition is a Small Business Set Aside - Total under NAICS code 561710. The contract is structured as a firm-fixed-price agreement consisting of one base year and four option years, with a potential six-month extension. Award will be based on the lowest price technically acceptable (LPTA) criteria, requiring offerors to provide a detailed technical approach and proof of California state licensing for pesticide application. Quotations must be emailed to [email hidden] by December 1, 2026, at 0800. Invoicing will be processed through the Department of Treasury's Invoice Processing Platform.
Region 3 Southwestern Regional Office

POSTED

about 16 hours ago

DEADLINE

in 11 days
View Details
NAICS: 561710
New
Federal
Shawnee National Forest Wildlife and Rodent Shield Installation
Solicitation # 12444527Q0004
The Shawnee National Forest, Hidden Springs Ranger District, requires the installation of a wildlife and rodent shield system to protect facility infrastructure, equipment, and building envelopes from damage. The scope of work includes conducting vulnerability assessments to identify gaps and penetrations, fabricating and installing resistant shielding such as stainless-steel mesh and flashing, and sealing penetrations. Key deliverables include a pre-installation assessment report, the completed installation, a post-installation inspection with a facility representative, and a final report featuring photo documentation and warranty information. All work must adhere to professional standards, OSHA and federal safety guidelines, and USDA facility standards. This is a Total Small Business Set-Aside procurement under NAICS code 561710. The contract follows a Lowest Price Technically Acceptable (LPTA) award approach, evaluating offers based on price, technical acceptability, past performance, and representations and certifications. The period of performance is from November 27, 2026, to January 27, 2027, with a requirement that all items be delivered within 60 days of award. Performance will take place in Vienna, Illinois. Offerors must submit their proposals via email as four separate attachments: a price proposal, technical acceptability, past performance, and representations and certifications.
Csa East 6 Usda-Fs

POSTED

about 16 hours ago

DEADLINE

in 11 days
View Details
NAICS: 561710
New
Federal
PKA - IDIQ Pest Management Services Recompete - 6 CES
Solicitation # FA481427Q0002
The 6th Contracting Squadron at MacDill Air Force Base is issuing a sources sought notice for an IDIQ Pest Management Services recompete under NAICS 561710. This is an advance notice for planning purposes to identify capable sources and is not a formal solicitation. The requirement is a Small Business Set Aside - Total, and prime contractors must be US-owned entities registered in the SAM database. Interested organizations must submit their capabilities, qualifications, DUNS number, and Cage Code by November 30, 2026, to determine if the procurement will be conducted on a competitive basis. The scope of work involves a non-personal, performance-based acquisition to execute an Integrated Pest Management Plan at MacDill AFB, Florida. Key services include pest control for food service areas, child development centers, and mosquito control, including ultra-low volume spraying and larvae surveillance. Personnel must be certified through the State of Florida per Chapter 482 and comply with DoDI 4150.07 and AFI 32-1053. The contractor is required to maintain a computer-generated work order system, manage a Self-Help Program for building managers, and provide Safety Data Sheets to the government. Performance is monitored by the COR through intermittent inspections, and the contractor must respond to customer complaints within one business day.
FA4814 6 Cons Pk

POSTED

1 day ago

DEADLINE

in 10 days
View Details

More opportunities from Department Of Veterans Affairs → Network Contract Office 23 (36C263)

Same awarding agency

NAICS: 238220
New
Federal
J041--Service - AHU PM & Filter Evaluation - NWI
Solicitation # 36C26327Q0124
The Department of Veterans Affairs, Network Contracting Office 23, is conducting market research through a sources sought notice to identify qualified businesses for HVAC preventive maintenance and filter evaluation services. The project will cover the Omaha and Grand Island VA Medical Centers and is anticipated to consist of a base year with option years. Key requirements include the inspection and preventive maintenance of air handling units and rooftop units, cleaning of HVAC equipment and coils, airflow and system performance testing, and humidifier maintenance. Additionally, the contractor must perform HEPA/MERV filter evaluations and replacements, providing written reports that document all inspections, maintenance activities, and identified deficiencies. This effort falls under NAICS code 238220, with a small business size standard of $19 million. Interested respondents must provide their company details, UEI, business size, and socioeconomic status, specifically noting if they are an SBA-certified SDVOSB or VOSB. They must also confirm their ability to perform services at both Nebraska locations and provide a brief description of similar experience. Responses are due by November 30, 2026, at 10:00 a.m. Central Time to Amanda Patterson-Elliott. This notice is for market research purposes only and does not constitute a solicitation or an award.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 16 hours ago

DEADLINE

in 10 days
View Details
NAICS: 337122
New
Federal
7125--B51-1 Wardrobes - NWI
Solicitation # 36C26327Q0115
Solicitation 36C26327Q0115 is a request for quotes for the procurement of 10 solid wood maple wardrobes for the St. Cloud VA Health Care System in St. Cloud, Minnesota. This is a firm fixed price contract conducted under FAR Part 13 Simplified Acquisition Procedures, with an estimated total award amount of 26,000 USD. The scope of work includes the provision, delivery, and installation of the wardrobes, requiring the contractor to provide all necessary transportation, labor, tools, and equipment. Technical specifications require the wardrobes to be assembled in the United States, featuring smooth finishes free of blemishes and tubular stainless steel color door handles. Additionally, locks on the doors and top drawers must be compatible with BESTLOCK interchangeable 7-pin cores. This procurement is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside, and prospective offerors must be registered in the System for Award Management (SAM) database. The anticipated period of performance is from December 1, 2026, to March 1, 2027. Quotes are due by November 24, 2026, and must be submitted electronically to the Contract Specialist, Erica Miller. Evaluation will be based on a comparative process considering technical quality, past performance, price, and veterans involvement, with the award going to the quoter most advantageous to the Government.
Nonupholstered Wood Household Furniture Manufacturing

POSTED

about 16 hours ago

DEADLINE

in 5 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS