Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

S38 Lateral Upgrade Project

Forecast
S38State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The S38 Lateral Upgrade Project, managed by the Arvin-Edison Water Storage District, involves water facility upgrades at two existing pump station sites in Kern County, California. The project is classified as a forecast under NAICS code 237110 and is designated as categorically exempt under Section 15301, as it consists of the repair, maintenance, and minor alteration of existing public water services facilities with negligible expansion. Samuel Blue, P.E., serves as the primary point of contact and Resource Manager for the project. Construction activities at the S38-P1 site, located northeast of N Rancho Drive and Teale Road, include replacing a pump and electric motor, upgrading discharge pipes, valves, and site electrical systems, and constructing a new gravity flow outlet, canal gate, short pipeline, and pipeline tie-in. At the S38-P2 site, located southeast of N Rancho Drive and Sweet Cherry Lane, the scope includes the installation of a new pump, electric motor, discharge pipe, and valves, along with site electrical upgrades.

General Info

S38 Lateral Upgrade: Pump and electrical upgrades at two Kern County stations for reliable water delivery.

Agency

California → Arvin-Edison Water Storage District

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Arvin-Edison Water Storage District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Arvin-Edison Water Storage District
Office AddressN/A

Full Description

Show more
The proposed Project is for water facility upgrades to the District's existing S38 Lateral at the existing two 2 existing pump station sites: S38-P1 (0.58 miles northeast of the intersection of N Rancho Drive and Teale Road), adjacent to the northwest corner of APN 446-032-13, and S38—P2 (0.58 miles southeast of the intersection of N Rancho Drive and Sweet Cherry Lane). within APN 446—050-11. Construction activities at S38-P1 include replacing a pump and electric motor, upgrading discharge pipes, valves, and site electrical, and constructing a new gravity flow outlet, canal gate, short pipeline, and pipeline tie-in. Construction activities at S38-P2 include installation of a new pump, electric motor, discharge pipe and valves, and upgrading site electrical.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 17 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS