Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

S38 Lateral Upgrade Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The S38 Lateral Upgrade Project, managed by the Arvin-Edison Water Storage District, involves water facility upgrades at two existing pump station sites in Kern County, California. The project is classified as a forecast under NAICS code 237110 and is designated as categorically exempt under Section 15301, as it consists of the repair, maintenance, and minor alteration of existing public water services facilities with negligible expansion. Samuel Blue, P.E., serves as the primary point of contact and Resource Manager for the project. Construction activities at the S38-P1 site, located northeast of N Rancho Drive and Teale Road, include replacing a pump and electric motor, upgrading discharge pipes, valves, and site electrical systems, and constructing a new gravity flow outlet, canal gate, short pipeline, and pipeline tie-in. At the S38-P2 site, located southeast of N Rancho Drive and Sweet Cherry Lane, the scope includes the installation of a new pump, electric motor, discharge pipe, and valves, along with site electrical upgrades.

General Info

S38 Lateral Upgrade: Pump and electrical upgrades at two Kern County stations for reliable water delivery.

Agency

California → Arvin-Edison Water Storage District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for S38 Lateral Upgrade Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Arvin-Edison Water Storage District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Arvin-Edison Water Storage District
Office AddressN/A
Contacts
Samuel BlueResource Manager

Full Description

Show more
The proposed Project is for water facility upgrades to the District's existing S38 Lateral at the existing two 2 existing pump station sites: S38-P1 (0.58 miles northeast of the intersection of N Rancho Drive and Teale Road), adjacent to the northwest corner of APN 446-032-13, and S38—P2 (0.58 miles southeast of the intersection of N Rancho Drive and Sweet Cherry Lane). within APN 446—050-11. Construction activities at S38-P1 include replacing a pump and electric motor, upgrading discharge pipes, valves, and site electrical, and constructing a new gravity flow outlet, canal gate, short pipeline, and pipeline tie-in. Construction activities at S38-P2 include installation of a new pump, electric motor, discharge pipe and valves, and upgrading site electrical.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 2 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a solicitation issued by James W. Fowler Co. on behalf of the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of various contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins measuring 54 and 145.5 inches. Additional infrastructure requirements include the construction of four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and piping systems. The project requires specialized civil works, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This opportunity is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. James W. Fowler Co. is actively encouraging M/W/DBE participation and offers assistance with bonding, insurance, and lines of credit to eligible subcontractors. Bids and subcontractor pricing must be submitted by September 29, 2026, with all negotiations finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 2 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS