This Solicitation opportunity from Hawaii was posted on May 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

S50231 Kawaihae Harbor, Pier 2B, Substructure Repairs, Hawaii

Closed
B26002934State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract pertains to substructure repairs at Kawaihae Harbor, Pier 2B, on the Island of Hawaii, focusing on repairing spalls and delaminations in concrete components including piers, beams, and precast planks. The scope includes sounding concrete, removing deteriorated material, replacing corroded steel reinforcement, installing formwork, placing patching concrete, and applying protective epoxy coatings. Work must comply with strict environmental regulations for hazardous materials such as lead, PCBs, PAHs, and tributyltin, requiring containment, controlled removal, and documented disposal via hazardous waste manifests. All activities must adhere to ACI 318R and 546R standards for concrete repair, ANSI PPE standards, OSHA respiratory protection and exposure limits, and state-specific regulations including HIOSH 12-148.1 and RCRA requirements. The project demands a certified Work Procedure and Waste Management Plan, digital photographs of repair stages, and verification of concrete compressive strength at 4,000 psi after seven days. The contract mandates stringent security and workforce protocols unique to the maritime facility. All personnel must hold a Transportation Worker Identification Credential (TWIC) and wear photo ID cards displaying full legal name, company, and photograph; individuals without TWIC must be escorted at a 1:5 ratio. An 80% Hawaii resident workforce requirement applies, with certified payrolls and notarized compliance documentation required for final payment. Contractors must provide 40-hour HAZWOPER training for workers, 8-hour supervisor training, medical clearance for respirator use, and maritime security awareness certification. Physical security measures include full perimeter fencing restoration daily, vehicle marking and search authority, and prohibitions on eating, drinking, or smoking in controlled areas. The State retains the right to modify work scope without cost adjustment and may terminate the contract for noncompliance, with all security and training obligations borne by the Contractor at no extra cost to the State. Proposals must be electronically submitted via the HIePRO portal by June 18, 2026, at 2:00 p.m. HST, with bid security delivered physically to Honolulu. The contract does not specify unit prices, total value, or award evaluation criteria, and no formal FAR clauses are referenced—instead, state law HRS Chapters 103D and 104 govern the proceedings.

General Info

Substructure repairs at Kawaihae Harbor Pier 2B with strict environmental, safety, security, and Hawaii workforce compliance requirements.

Agency

Hawaii → Department of TransportationView Agency

NAICS

238140 - Masonry ContractorsView NAICS

Place of Performance

HI, USA

Set-Aside

NONE

Documents

(3)

Kawaihae Harbor Pier 2B Substructure Repairs Job S50231 Specifications and Proposal

PDFrfp

S50231 Kawahae Harbor Pier 2B Substructure Repair Plans

PDFspecifications

Addendum No. 1 for Kawaiahae Harbor Pier 2B Substructure Repairs S50231

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyHawaii → Department of Transportation
Contacts2 people available
OfficeHI, USA
Organization / Agency
Hawaii → Department of Transportation
View Agency Profile
Office AddressHI, USA
Contacts

Full Description

Show more
S50231 - Kawaihae Harbor, Pier 2B, Substructure Repairs, Island of Hawaii The scope of work consists of repairing spalls and delaminations on the substructure at Kawaihae Harbor, Hawaii.

More opportunities from Hawaii → Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Highway, Street, and Bridge Construction

POSTED

about 12 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 561730
New
SLED
BO1741-73 Landscape Maintenance at HNL
Solicitation # B01741-73
The State of Hawaii Department of Transportation is soliciting bids for landscape maintenance services at the Daniel K. Inouye International Airport (HNL) for fiscal year 2027. The contractor will be responsible for providing all labor, materials, and equipment to maintain designated areas on an as-is basis. Key deliverables include daily watering and maintenance from Monday through Friday, debris removal three times weekly, and root-level weeding. The scope also includes monthly hedge trimming, quarterly and semi-annual tree trimming, and fertilization services. A Certified Arborist with at least five years of local experience must be onsite during all tree and hedge trimming, and all chemical applications must be performed by certified individuals. Eligible bidders must hold a valid State of Hawaii Specialty Contractors C-27 license. Proposals must be submitted via the HIEPRO portal by October 8, 2026, at 2:00 p.m. HST. The contract will be awarded to the lowest responsive and responsible bidder based on the total amount for comparison, with a 5% preference available for certified Hawaii bidders. The initial term includes an option for extensions, with a total maximum duration of 48 months. Payment is made monthly, subject to a 5% retainage. Required qualifications include a combined single limit of $5,000,000 for auto liability insurance and the submission of performance and payment bonds upon contract execution. Personnel requiring access to the Air Operations Area must undergo background checks and obtain the necessary security clearances.
Landscaping Services

POSTED

about 12 hours ago

DEADLINE

in 27 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS