Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Maryland was posted on June 2, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

S802384 / S806104 Cox Creek WRF Non-ENR Misc 2 Impr & Odor Control Sys Upg

Closed
CAP25000373State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333924
New
DIBBS
BINDER, LOAD
Solicitation # SPE8EF-27-T-0188
Solicitation SPE8EF-27-T-0188 is a request for quotations issued by DLA Troop Support, Construction and Equipment Manufacturing and Construction for the procurement of 61 units of Load Binders, identified by NSN 3990-01-554-6200 and Columbus McKinnon Corporation part number D060164. The requirement is designated as a total small business set-aside under FAR 19.5, with a response deadline of November 9, 2026. Delivery is required within 167 days after order, with a need ship date of April 26, 2027, and a final required delivery date of September 13, 2027. The items are to be delivered FOB Origin to DLA Distribution Red River in Texarkana, Texas, where both inspection and acceptance will take place. The contract mandates strict adherence to packaging and marking standards, requiring compliance with MIL-STD-129 and ASTM D3951, though DLA Master List technical and quality requirements take precedence. Palletization must follow RP001 guidelines. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and payment. Key regulatory clauses are incorporated, including DFARS 252.204-7012 for safeguarding covered defense information and various prohibitions regarding hazardous materials and covered telecommunications equipment. Offerors must maintain current certifications in the System for Award Management and provide safety data sheets where applicable to be considered responsible for award.
CONSTRUCTION & EQUIPMENT MANU & CON

POSTED

1 day ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The contract involves comprehensive upgrades and replacements at the Cox Creek Water Reclamation Facility, focusing on both HVAC and odor control systems. Key tasks include replacing the existing air handler system, electrical components, ductwork, drain pumps, variable frequency drives, valves, and piping within the Drain Pump Station. Additionally, the project entails installing non-potable water systems in the Digester Building, adding electric valve actuators, and upgrading bubbler level sensors to pressure transducer level meters. On the odor control front, the work involves installing a new BioAir Odor Control module, repositioning the odor control tower, installing a new blower, and reconfiguring ducting, electrical, and instrumentation systems to ensure seamless integration. A condition assessment and report of the existing odor control system are also required. The solicitation, posted by Anne Arundel County, Maryland, under the project title "S802384 / S806104 Cox Creek WRF Non-ENR Misc 2 Impr & Odor Control Sys Upg," is set for responses by July 15, 2025. The project is estimated to cost between two and five million dollars and is designated as prevailing wage eligible. The primary contact for the project is Chris Biggerstaff, reachable via email or phone. Interested parties can find additional details and bidding information through the county’s procurement website.

Documents

2

CAP25000373 - Cox Creek WRF Improvements & Odor Control System Upgrade

PDF, High priority: read this firstrfp
High

CAP25000373 - Cox Creek WRF Non-ENR Misc 2 Impr & Odor Control Sys Upg

PDF, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMaryland → Anne Arundel County
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
The Work includes the following major items: S806104 - Replace existing air handler system (HVAC Improvements), electrical, and ductwork; Replace existing drain pumps, VFDs, valves, and piping in Drain Pump Station; Install non-potable water to Digester Building; Install electric valve actuator; Replace bubbler level sensors with pressure transducer level meters. S802384 - Installation of a new BioAir Odor Control module; Repositioning of the odor control tower; Installation of a new blower; Reconfiguration of ducting, electrical and instrumentation integration; Condition assessment and report of the Odor Control System. "See Notice to Contractors for the pre-bid meeting information" "Prevailing Wage Eligible"

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS