Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on April 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sacramento North River Levee - Geotechnical Engineering and Material Testing

Closed
26-002-RFPState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project (Work Order C2305) on behalf of the Elsinore Valley Municipal Water District in California. This professional services agreement seeks qualified DBE firms to provide comprehensive design, bidding support, and engineering services during construction. The scope is divided into two phases: Phase 1 focuses on civil site design, technical specifications, and construction management for the drilling of a new well and the abandonment of the existing one; Phase 2 covers architectural, civil, mechanical, structural, electrical, and I&C design drawings, as well as equipping, testing, and commissioning. Technical requirements specify the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and compliance with AWWA potable water well construction standards, Riverside County, and California State Water Resources Control Board regulations. The contract is set aside for small and disadvantaged businesses, including DBE, WOSB, and SDVOSB entities. Award selection is based on the most advantageous proposal, considering both price and other factors. Key requirements include the provision of performance and payment bonds for 100 percent of the contract price, a bid guarantee of five percent, and adherence to California prevailing wage laws. Consultants must maintain active SAM registration and provide a project manager as the primary point of contact. Payment is processed via monthly itemized statements, with a 45-day review and payment cycle. Proposals must be submitted via PlanetBids by September 1, 2026, and must include a cover letter, a detailed project approach, staff resumes, a five-year representative project list, and three professional references.
Ardurra Group, Inc.

POSTED

about 11 hours ago

DEADLINE

in 9 days

General Info

Agency

California → Capital Projects - FloodView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

CA, USA

Set-Aside

NONE

Documents

(18)

Exhibit_B_-_City_of_West_Sacramento_Right_of_Entry_License.pdf

PDF

Table_9_-_Traffic_Control_References.pdf

PDF

Exhibit_Y_-_Contract_for_Services.docx

DOCX

Sacramento North River Levee - Geotechnical Engineering and Material Testing.pdf

PDF

Table 3 - Exploration Details

PDFother

Table_10_-_Archeological_Cultural_and_Biological_Monitoring_References.pdf

PDF

Table_4_-_Laboratory_Test_Quantities.pdf

PDF

Table_8_-_Safety_and_Health_References.pdf

PDF

Exhibit_C_-_Cost_Proposal_Item_Summary_R.2.pdf

PDF

Table_7_-_Quality_Management_and_Laboratory_Testing_References.pdf

PDF

Exhibit_A_-_Location_of_Borings.pdf

PDF

Contract for Services - West Sacramento Federal Boilerplate RFP 5.1.24

DOCXcontract-document

Table_5_-_Drilling_and_Geotechnical_Investigation_References.pdf

PDF

Group 2 Deliverable Due Dates Table

PDFschedule

Group 1 Deliverable Due Dates Table

PDFschedule

Table_6_-_EFA_Testing_References.pdf

PDF

WSAFCA Contract Insurance Requirements

PDFinsurance-requirements

Federal Award Requirements Appendix II to Part 200 Contract Provisions

DOCXcontract-provision-language

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Capital Projects - Flood
Contacts2 people available
OfficeWest Sacramento, CA, 95691, USA
Organization / Agency
California → Capital Projects - Flood
View Agency Profile
Office AddressWest Sacramento, CA, 95691, USA
Contacts
Ryan TevesAssistant Engineer
Jenn NguyenAdministrative Analyst

Full Description

Show more
West Sacramento is a vibrant riverfront community centrally located in Northern California. West Sacramento shares the Sacramento River with neighboring Sacramento, with the deep water ship canal serving the Port of Sacramento. Incorporated in 1987, West Sacramento encompasses approximately 22 square miles, with a population just over 55,000. The West Sacramento Federal Project (Project) was authorized in the 2016 Water Infrastructure Improvements for the Nation Act. The Project has a current estimated cost of $2.01 billion. Before the Project received a New Start designation, WSAFCA and State of California (State) invested nearly $210 million in advanced construction to immediately reduce flood risk to the 55,000 residents, property, and businesses in the City. This advanced construction included the first component of the authorized Project, the Southport Levee Improvement Project, and three segments in the north area of the City. The Corps has received approximately $153,000,000 to date in pre-construction engineering and design (PED) and construction funds for the Federal Project, which is being used to design and construct the next increments of the Federal Project, the Yolo Bypass East Levee project and Sacramento River North Levee (SRNL) 1S Contract. The SRNL 3E erosion protection project is the next phase of the Project. SRNL was studied at a feasibility level in the West Sacramento Project General Reevaluation Report. The levee seepage improvements project is currently at the 65% design phase. In advance of additional federal appropriations, WSAFCA intends to advance design of the erosion protection phase of the Project. The geotechnical subsurface investigations requested in this proposal will be used to determine recommended future improvements for design and construction along the west bank of the Sacramento River.