Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Salmon River Dike Upgrades

Closed
BC26-147_TOLCanada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract includes a comprehensive suite of airfield infrastructure upgrades at the Port of Seattle, focusing on critical safety and operational improvements. Key elements involve replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signage to enhance visibility and energy efficiency, while also upgrading failing pavement sections and essential utilities to ensure structural integrity and long-term reliability. Wildlife hazard mitigation is a major component, requiring the removal of turf edge dams along runways and taxiways, installation of anti-perching devices on airfield signs to deter birds, and comprehensive stormwater management through regrading and new drainage infrastructure to eliminate ponding that attracts wildlife. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid, unobstructed access for emergency response teams. All work is part of a larger, coordinated initiative under the Airfield 2029 All Projects program, aimed at modernizing the airport’s ground infrastructure to meet operational and safety standards. The project is managed by the Aviation Project Management Group within the Port of Seattle, with Yanet Maldonado serving as the primary point of contact. Though the solicitation is currently posted as a forecast, the scope indicates a significant investment in airfield resilience, combining electrical, civil, environmental, and emergency response improvements in a single integrated effort to support the long-term functionality and safety of the airfield.
Aviation Project Management Group

POSTED

14 minutes ago

DEADLINE

N/A
NAICS: 237990
New
SLED
Jack Block Park Pier ReplacementThe contract involves the complete demolition of the aging, end-of-life pier at Jack Block Park and the construction of a new pier structure to replace it, along with necessary repairs to the surrounding pier plaza to ensure structural integrity and functionality. This project is managed by the Port of Seattle under the Northwest Seaport Alliance, targeting infrastructure renewal in a publicly used waterfront area. The work will require careful planning and execution to minimize disruption to park users and surrounding maritime operations, with all activities governed by applicable environmental and safety regulations. The North American Industry Classification System code 237990 indicates the scope falls under other heavy and civil engineering construction, encompassing substantial marine construction efforts. Primary point of contact for the procurement is Yanet Maldonado, reachable at the Port of Seattle, with Valerie Huffman serving as the project manager for ongoing coordination and oversight. The solicitation was posted in July 2026, signaling an upcoming competitive bidding phase for qualified contractors with experience in marine infrastructure. While no set-aside designation has been specified, bidders are encouraged to review the official solicitation portal for detailed requirements, timelines, and submission guidelines. The place of performance is fixed at Jack Block Park, and no additional office or location details are provided beyond the broader agency affiliation with the Port of Seattle.
Northwest Seaport Alliance (NWSA)

POSTED

14 minutes ago

DEADLINE

N/A

AI Contract Overview

Show more

The contract involves the elevation of a 600-meter-long earth dike along the Salmon River by approximately 0.9 meters on average, accompanied by the installation of a reinforced concrete and steel barrier system within the pump house section to enhance structural integrity. The project includes integration with the existing river-side trail network and maintenance driveways, as well as the construction of a 16-foot-tall golf ball protection fence along the newly elevated dike crest. Approximately 60 trees with diameters exceeding 300 millimeters will be removed from the dike alignment and transported off-site for disposal. Additional incidental work as outlined in the Contract Documents is also included. Parallel to the dike upgrade, Part B and Part C address erosion mitigation along the Bedford Channel riverbank at two designated work sites, WP2 and WP6, with the latter being optional. This phase entails the deployment of a natural erosion control system using rock armouring, large woody material, and geotextile or soil-wrap technologies to stabilize the eroding banks. Vegetative restoration will be performed through live staking at intervals of no more than 0.6 meters to promote long-term ecological recovery. The solicitation number is BC26-147_TOL, with bids due by May 28, 2026, and all submissions require prior registration as a Plan Taker through the designated bidding system to receive updates and ensure eligibility.

General Info

Elevate 600m dike, install concrete-steel barrier, build golf fence, remove 60 trees, stabilize riverbank with rock and live staking.

Agency

Government of Canada → Township of Langley

NAICS

237990 - Other Heavy and Civil Engineering Construction View NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Township of Langley
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Township of Langley
Office AddressN/A
Contacts
Contracting Authority

Full Description

Show more
Part A - Salmon River Dike Upgrades Raising of the existing 600m-long earth dike by approximately 0.9 meters on average Installation of a concrete and steel barrier system through the pump house section of the dike Tie ins to the existing river side trail network and maintenance access driveways Installation of new golf ball protection fence (16-feet tall) along the new trail at top of dike Cut and off-site removal of approx. 60 trees (diameter > 300mm) along the dike alignment Other miscellaneous and incidental work as described in the Contract Documents Part B & C – Bedford Channel Bank Erosion Mitigation Installation of a natural erosion protection system at two sites, WP2 (Part B) & WP6 (Part C – Optional Work) along the riverbank adjacent to the dike upgrade work Installation of rock armouring, large woody material (LWM), and geotextile/soil‑wrap systems to repair the eroding riverbank Vegetative restoration measures including live staking at maximum 0.6m spacing To obtain documents, please visit our Bidding System https://tol.bidsandtenders.ca. Note: In order to submit a response to this Bid the proponent MUST register as a Plan Taker for this opportunity.Only by being registered, can a proponent be certain to receive addenda notifications.DatesThe Township will not update BC Bid of any date changes related to this Bid.