Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Salt Brine Production System Fabrication (Osceola & Washington MG)

Active
DASIowa-645-DOTRFB-3174-2027State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

NAICS

N/A

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyIowa
Contacts1 person available
OfficeIA
Organization / AgencyIowa
Office AddressIA
Contacts
Kyle Williams

Full Description

Show more
Salt Brine Production System Fabrication (Osceola & Washington MG)

More opportunities from Iowa

Same awarding agency

NAICS: 238170
New
SLED
Rest Area Tiffin East Bound Façade Renovations
Solicitation # 645-DOTRFB-3161-2027
The Iowa Department of Transportation is soliciting bids for the facade renovations of the I-80 East Bound Rest Area near Tiffin, Iowa. The project involves the removal and replacement of the existing surface tile and stucco insulation system with a rain screen fiber cement siding system, as well as the application of cementitious stucco or parging over existing concrete masonry on specific walls. Because the facility will remain occupied during construction, the contractor must manage activities to minimize disruption to the public and DOT staff. All work must adhere to the provided project manual and plans and will be performed under the direct supervision of the Iowa DOT, including periodic site inspections and a requirement for 24-hour advance notice prior to installation. The contract will be awarded by item to the responsible bidder whose submission is most advantageous based on cost, proposed staffing, adherence to the time schedule, and a review of past work performance and capacity. Bids must be submitted via the IMPACS Business Opportunities site by November 17, 2026. The estimated start date is March 2027, depending on weather conditions, with a target completion date of June 30, 2026. Payment terms are set at Net 60, and the bidding process is governed by Iowa Administrative Code 761-20. Davis-Bacon wages do not apply to this project.
Siding Contractors

POSTED

4 days ago

DEADLINE

in 17 days
View Details
NAICS: 238990
New
SLED
Iowa DOT Repair Shop Annex Overhead Door Tracks
Solicitation # 645-DOTRFQ-3173-2027
Solicitation 645-DOTRFQ-3173-2027 is a request for quotes from the Iowa Department of Transportation for the removal and replacement of overhead door tracks at the Repair Shop Annex. The scope of work includes replacing standard overhead door tracks on doors RA-1, 2, 3, 4, and 7 with galvanized pitch of roof tracks that match the roof angle, replacing torsion springs, and the removal and re-installation of trolley operators. All work must adhere to the approved design and be performed under the direct supervision of the Iowa DOT, with the contractor providing at least 24 hours notice prior to installation for required inspections. Electrical conflicts will be managed by DOT electricians, and deliveries are specified as F.O.B Destination. The contract will be awarded to the responsible bidder whose submission is most advantageous, evaluating cost alongside mandatory requirements, proposed staffing, the ability to meet the time schedule, and past work performance and capacity. Bidders must certify acceptance of ten specific solicitation items and comply with Iowa Administrative Code 761-20. Payment terms are set at net 60 days after delivery of the new door track. This is a tax-exempt procurement, and Davis-Bacon wages do not apply. Responses are due by November 10, 2026, at 1:00 PM CST, with the primary point of contact being Kyle Williams.
All Other Specialty Trade Contractors

POSTED

4 days ago

DEADLINE

in 10 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS