Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

SAM Force Main in Montara Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Mid-Coastside Sewer Authority

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Sonora Avenue and SR-1, CA, 94019

Set-Aside

NONE

Documents

(6)

SAM Force Main Montara Replacement Project NOA 01082026

PDFnotice-of-availability

CDFW Comment on SAM Force Main in Montana Replacement Project MND

PDFcomment

SAM Force Main in Montara Replacement Project SCH Summary Form

PDFenvironmental-summary

Notice of Completion & Environmental Document Transmittal for SAM Force Main in Montara Replacement Project

PDFnotice-of-completion

Caltrans Comment Letter on SAM Force Main Replacement Project Draft IS/MND

PDFcomment-letter

Flattened SAM Force Main in Montara Replacement Project Combined

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Mid-Coastside Sewer Authority
Contacts3 people available
OfficeN/A
Organization / Agency
California → Mid-Coastside Sewer Authority
Office AddressN/A
Contacts
Debra LeightEnvironmental Planning Practice Lead
Kishen PrathivadiProject Manager

Interested Companies (1)

Show more
MNS Engineers
San Jose, CA

Full Description

Show more
The SAM Force Main in Montara Replacement Project (herein referenced as the “project”) is proposed for a sewer force main replacement along the alignment of the existing Intertie Pipeline System (IPS). The project is proposed by the Sewer Authority Mid-Coastside (SAM) and includes the construction of a sewer force main segment, starting within the boundaries of the Montara Water and Sewer District along Caltrans State Route 1 (SR-1) with a proposed length of approximately 13,540 feet. An existing 8-inch diameter Princeton force main connects to the project force main approximately 200 feet southwest of Coral Reef Avenue. The project will relocate this connection to the intersection of Coral Reef Avenue and SR-1 in order to avoid the requirement to work to connect the pipelines in sensitive environmental habitats. The project site is located along SR-1 between California Avenue in the community of Moss Beach and Sonora Avenue in the community of El Granada, within unincorporated San Mateo County (County), California. The project traverses the census-designated places of Miramar, El Granada, and Moss Beach. The project site is primarily developed along the paved road and open space.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 2 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS