San Diego Miramar College Master Plan Project
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → San Diego Community College District
NAICS
541620 - Environmental Consulting ServicesView NAICS
Place of Performance
Black Mountain Road and Miramar College Driveway, San Diego, CA, 92126Set-Aside
NONE
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → San Diego Community College District
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Diego Community College District
Office AddressN/A
Contacts
Interested Companies (1)
Show more
Harris & Associates
Concord, CA
Full Description
Show more
The Miramar College Facilities Path to 2035 (Master Plan) details proposed campus-wide improvements at Miramar College to replace aging buildings and enhance campus connectivity. The designs and concepts presented in the Master Plan are conceptual and intended to serve as a framework for the future detailed design of campus improvements as funding becomes available. The project consists of demolition, construction, and renovation of existing campus buildings and facilities on the 120-acre campus. The projects would generally demolish existing aging facilities on the campus and replace them with more modern facilities that accommodate campus programming. As the Master Plan is conceptual in nature, the exact architectural programming and design of each project would be developed during project implementation in coordination with user groups. Campus-wide improvements related to utility infrastructure and circulation are also part of the Master Plan and could be implemented in coordination with specific projects or undertaken as campus-wide efforts. Interior renovations and minor construction could also occur throughout existing campus buildings. The English, Gallery and Performing Arts Center Building, Early Education Center Building, and South Campus Drive and North Campus Drive Connection projects are anticipated to be designed and constructed in the near term. No specific timing or phasing is identified for the remaining projects or campus-wide improvements.
Similar Contracts
Same NAICS industry code
