San Dieguito Lagoon Levee, Habitat Enhancement, and Trail Project
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → City of Del Mar
NAICS
N/A
Place of Performance
Jimmy Durante Blvd, Del Mar, CA, 92014Set-Aside
NONE
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → City of Del Mar
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Del Mar
Office AddressN/A
Contacts
Full Description
Show more
The Project consists of three reaches of the shoreline: North Riverbank, Southeast Riverbank, and Southwest Riverbank. The Project would involve incorporation of living levee design concepts to improve resilience to sea level rise (SLR), provide flood protection, meet FEMA’s No Rise certification standard for the floodplain, improve local water quality, improve public access, and enhance biodiversity. Additionally, the Project includes demolition of the primary Public Works Facility structure and removing other structures from the FEMA floodway. The replacement Public Works Facility structures (i.e., prefabricated, mobile structures) would be located within the existing Public Works Facility property, beyond the limits of the floodway, in compliance with FEMA’s floodplain standards.
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
