This Government Contract opportunity from California was posted on September 25, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

San Jacinto Valley RWRF Aeration Basin Rehabilitation and Diffusers Replacement Project

Awarded
Spec # 1557SState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 7 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 8 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The San Jacinto Valley RWRF Plant 2 Aeration Basins Rehabilitation and Diffusers Replacement Project, managed by the Construction Department of Eastern Municipal Water District, involves comprehensive structural and mechanical upgrades to the facility's aeration zones. The contractor is responsible for coordinating shutdowns, performing structural repairs, and replacing existing aeration panels, stainless steel pipelines, and fasteners. Key technical requirements include the installation of new tubular aeration diffusers, motorized actuators, valves, mass flowmeters, and dissolved oxygen analyzers, along with the necessary electrical and control system modifications to integrate these components. Additional operational responsibilities include managing temporary pumping and piping systems for dewatering, installing a temporary RAS line during specific zone shutdowns, and replacing sluice gate gaskets as needed. The contractor must also handle the modification of the 24 inch aeration header pipe and manage algae growth during the commissioning and testing phases. Bids for this project, which require a 10 percent bid bond, are due by October 23, 2025.

General Info

Contract Value

$65,000

Place of Performance

San Jacinto Valley RWRF - 770 N. Sanderson Avenue, San Jacinto, CA 92582, CA, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Construction Department of Eastern Municipal Water District
Contacts1 person available
OfficeCA, USA
Office AddressCA, USA
Contacts
Jennifer Morgenstern xContact

Full Description

Show more
Scope: SC-02 Scope of Work - Under these Specifications the Contractor shall perform all work associated with construction of San Jacinto Valley RWRF Plant 2 Aeration Basins Rehabilitation and Diffusers Replacement Project. The scope of work for this project includes, but is not limited to, the following: 1. Coordinate with District’s treatment plant operations and electrical services to schedule and sequence the Plant 2 Aeration zones shutdowns and construction work. District will drain and clean aeration zones 2. Furnish and install, operate and maintain, temporary pumping and piping system to dewater any nuisance flow into the work area 3. Perform structural repairs of all Plant 2 aeration basins per detailed condition assessment of representative aeration zones of Plant 2’s Zones 3 4. Demolish and remove existing aeration panels and fasteners, stainless steel aeration pipeline, and appurtenances 5. Furnish, install, operate and maintain a temporary RAS line during shutdowns of Zones Z2 & Z1 construction work. 6. Perform gasket replacement for 102”x60” sluice gates between Zones 1 and 2, and Zones 3 and 4, if needed. 7. Perform gasket replacement for 20”x20” RAS sluice gates Zones 1 and 2, if needed. 8. Furnish and install new tubular aeration diffusers, new stainless steel aeration pipeline, pipeline supports, and appurtenances 9. Furnish and install new motorized actuators and valves, mass flowmeters, and dissolved oxygen analyzers and probes, and appurtenances 10. Modify, furnish and install, and terminate new conduits and wires and appurtenance for the new motorized actuators and valves, mass flowmeters, and dissolved oxygen analyzers and probes 11. Furnish and install associated electrical, instrumentation, control system modifications, and integrate control and instrumentation 12. Coordinate with District for the Plant 2 aeration basins shutdowns to modify existing 24” aeration header pipe and the coring of Zones Z2 & Z1 wall for the new aeration piping 13. Coordinate with District to obtain and drain reclaimed water for diffusers commissioning and testing for each aeration zone 14. Manage and control algae growth within the Plant 2 Aeration Basins during commissioning effort, without the use
Notes: Bid Results will be available in PlanetBids once time for receiving bids has expired.
Bid Bond: 10.00%

More opportunities from California → Construction Department of Eastern Municipal Water District

Same awarding agency

NAICS: 237110
SLED
Lindenberger Road Pipeline
Solicitation # 1588W
The Lindenberger Road Pipeline Replacement project, solicitation number 1588W, is a public works contract issued by the Construction Department of the Eastern Municipal Water District in California. The scope of work involves the installation, testing, and start-up of approximately 200 linear feet of 30-inch and 36-inch cement mortar lined and coated welded steel transmission pipeline at the intersection of Lindenberger Road and Simpson Road in the City of Menifee. Additionally, the contractor is responsible for the removal or abandonment of approximately 300 linear feet of existing 27-inch to 36-inch pipelines. The comprehensive project includes the installation of fittings, isolation valves, air/vac valves, blow-offs, corrosion monitoring systems, and all necessary trenching, backfill, and street pavement restoration, including traffic detector loops and thermoplastic striping. The contract will be awarded to the lowest qualified bidder based on the total bid price. To be considered responsive, bidders must ensure a company employee has inspected the jobsite and must submit a complete proposal package via PlanetBids by 10:00 a.m. on November 17, 2026. Required submissions include a 10 percent bid bond via Surety 2000, a signed proposal sheet, and various certifications such as the Non-Collusion Declaration and Cal OSHA Form 300A. Depending on the bid amount, Iran Contracting Act and Russia Economic Sanctions certifications may be required for bids exceeding 1 million and 5 million dollars, respectively. The contractor must adhere to prevailing wage rates, Cal OSHA Title 8 regulations, and ADA standards for access ramps. Performance and labor payment bonds equal to 100 percent of the contract amount are required upon award. Quality assurance includes pressure testing and soil density verification using sand cone or nuclear methods. The contractor is also obligated to repair any defective workmanship at their own expense for one year following the notice of completion and acceptance. Progress payments will be initiated by the District based on site meetings to determine the percentage of completion.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 21 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS