Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on May 10, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

San Juan Harbor Construction and Maintenance Dredging, 44-Foot and 36-Foot Project, San Juan, Puerto Rico

Closed
W912EP23B0008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 9 hours ago

DEADLINE

in 5 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

San Juan, PR, USA

Set-Aside

NONE

Documents

19

Amendment 0001 to Solicitation W912EP23B0008 San Juan Harbor Dredging

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation W912EP23B0008 for San Juan Harbor Dredging

PDF, High priority: read this firstamendment
High

Amendment 0003 to Solicitation W912EP23B0008 for San Juan Harbor Dredging

PDF, High priority: read this firstamendment
High

Amendment 0004 to Solicitation W912EP23B0008 for San Juan Harbor Dredging

PDF, High priority: read this firstamendment
High

Amendment 0005 to Solicitation W912EP23B0008 for San Juan Harbor Dredging

PDF, High priority: read this firstamendment
High

Amendment 0006 to Solicitation W912EP23B0008 for San Juan Harbor Dredging

PDF, High priority: read this firstamendment
High

Amendment 0007 to Solicitation W912EP23B0008 for San Juan Harbor Dredging

PDF, High priority: read this firstamendment
High

Pre-Bid Conference Memo and Attendance Roster for Solicitation W912EP23B0008

PDF, High priority: read this firstpre-bid-conference-memo
High

Pre-Solicitation Site Visit Memo for Solicitation W912EP23B0008

PDF, High priority: read this firstpresolicitation
High

Solicitation W912EP23B0008 San Juan Harbor Dredging Project

PDF, High priority: read this firstrfp
High

W912EP23B0008 San Juan Harbor Construction and Maintenance Dredging Specs Vol 2

PDF, High priority: read this firstspecifications
High

W912EP23B0008 San Juan Harbor Construction Dredging IFB Volume 1 Specs

PDF, High priority: read this firstifb
High

W912EP23B0008 San Juan Harbor Geotechnical Data Report

PDF, High priority: read this firstgeotechnical-data-report
High

Abstract of Bidders for W912EP23B0008 San Juan Harbor Dredging

PDF, Low priorityabstract-of-bidders
Low

W912EP23B0008 Analysis of Dredge Effects to -47 ft with Drained Soil Strength

PDF, Low prioritytechnical-report
Low

W912EP23B0008 Dredging Offset Recommendations Puma Energy Caribe

PDF, Low prioritytechnical-report
Low

W912EP23B0008 Puma Energy Bathymetry Survey Sections

PDF, Low priorityspecifications
Low

Revised+Bid+Abstract+W912EP23B0008+San+Juan+Harbor.pdf

PDF

W912EP23B0008+PRE+BID+CONFERENCE+SLIDES.pptx

PPTX

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

21 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline time changed from 5:00 PM UTC to 5:00 AM UTC on Apr 7, 2023. The notice title changed. The notice description changed. The point of contact changed.

Notice updated

Response deadline time changed from 5:00 AM UTC to 5:00 PM UTC on Apr 7, 2023. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Apr 7, 2023 to Apr 11, 2023. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Apr 11, 2023 to Apr 18, 2023. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Apr 18, 2023 to Apr 25, 2023. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Apr 25, 2023 to May 5, 2023. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from May 5, 2023 to May 9, 2023. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts2 people available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA

Full Description

Show more
5/10/23: Revised Bid Abstract posted, see attachments section 5/10/23: Bid Abstract posted, see attachments section ***UPDATE 5 MAY 2023: Issued Environmental permits indicated in amendment 0007 have been publicly posted to the SAJ Environmental Website at the following website: https://www.saj.usace.army.mil/About/Divisions-Offices/Planning/Environmental-Branch/Environmental-Compliance/#Puerto_Rico ***UPDATE AMENDMENT 0007 issued on 28 April 2023, see attachment W912EP23B0008 AMENDMENT 0007 FINAL ***UPDATE: AMENDMENT 0006 issued on 21 April 2023 ***UPDATE: AMENDMENT 0005 issued on 17 April 2023 ***UPDATE: AMENDMENT 0004 issued on 10 April 2023, see attachment W912EP23B0008 AMENDMENT 0004 FINAL 04102023 **UPDATE 7 April 2023: A forthcoming amendment is pending, which will extend the bid due date and bid opening. ***UPDATE: AMENDMENT 0003 issued on 31 March 2023 ***UPDATE: AMENDMENT 0002 issued on 29 March 2023, see attachment W912EP23B0008 AMENDMENT 0002 FINAL 03292023 ***UPDATE 23 MARCH 2023: Site Visit and Pre-Bid Conference information posted, see attachments. ***Amendment 0001 issued on 10 March 2023 *** Work associated with the requirement consists of construction and maintenance dredging in designated areas of deepening and widening of the Federal navigation channel and Puerto Rico Ports Authority (PRPA) berthing areas. The project work includes: Deepening Cut-6 of the entrance channel to a required depth of 47 feet, Deepening the Anegado Channel to a required depth of 45 feet, The Army Terminal Channel, and the Army Terminal Turning Basin to a required depth of 46 feet, Deepening the Federal channels adjacent to the cruise ship terminals, to include the San Antonio Approach Channel, the San Antonio Channel, the Cruise Ship Basin East, and the Cruise Ship Basin West to a required depth of 37 feet. Project work will also include maintenance dredging of areas within the Puerto Nuevo Channel, Puerto Nuevo Turning Basin, Graving Dock Channel and Anchorage Area - E to required depths ranging from 36 feet to 39 feet. The project widening involves constructing 50 feet of new channel on both sides of Army Terminal Channel to increase the total channel width by 100 feet from 350 feet to 450 feet, and eastern and western flares at the intersection of the southern terminus of the Army Terminal Channel and the Army Terminal Turning Basin. All areas of deepening and widening will incorporate +1 foot of allowable overdepth.All maintenance dredging areas will incorporate +2 feet of allowable overdepth. Project work also consists of dredging the PRPA Cruise and Pan American berthing areas and the PRPA berthing areas located adjacent to the Army Terminal Turning Basin. All dredged material will be disposed of in the San Juan Ocean Dredge Material Disposal Site (ODMDS) located approximately 2.3 nautical miles from the northern end of Cut-1. Said work, which will be performed in San Juan, Puerto Rico, and divided into a base and two options, is also inclusive of, but not limited to, environmental species monitoring, turbidity monitoring and vibration monitoring. THE BID OPENING WILL BE HELD VIRTUALLY VIA WEBEX ON 9 MAY 2023 AT 2:00 PM (EDT) Webex Link: https://usace1.webex.com/meet/adeline.f.fuata Call In Info:+1 (555) 000-0000 (US Toll Free), +1 (555) 000-0000 (US Toll) Access Code: 2761 122 9179 The period of performance is 440 calendar days after the notice to proceed is issued. The total completion time includes the following: Base Bid 370 calendar days (including 60 calendar days mob/demob) Option A 20 Calendar days Option B 30 calendar days Option C 10 calendar days Option D 10 Calendar days The NAICS is 237990, size standard of $37 million The estimated magnitude of construction is between $25,000,000 to $100,000,000 THIS IS AN UNRESTRICTED SOLICITATION. ALL RESPONSIBLE CONTRACTORS ARE ENCOURAGED TO PARTICIPATE. Solicitation will be issued in electronic format only and will be posted on the SAM website at www.sam.gov. In order to receive notification of any amendments to this solicitation, interested vendors must REGISTER AS AN INTERESTED VENDOR on the SAM website at www.sam.gov. If you are not registered, the Government is not responsible with providing you with notification of any changes to this solicitation. You must be registered in the System for Award Management (SAM) in order to be eligible to receive an award from this solicitation. For additional information, please call +1 (555) 000-0000 or visit the SAM website at https://www.sam.gov/.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS