San Lorenzo River Lagoon Culvert Debris Boom
Open
IFB No. DPW-0337State & LocalResponse Deadline
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Documents
0No documents available
Documents will appear here when they are available.
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Get what you need to respond
No documents were posted with this contract.
- Buyer contactEmail and phone
- Original solicitationLink to the source posting
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
PhaseSolicitation
Posted
Solicitation
Response Deadline
Submission deadline
Response Deadline
Organization & Contact Information
Show more
AgencyCalifornia → Public Works
Contacts1 person available
OfficeSanta Cruz, CA, 95060, USA
Organization / AgencyCalifornia → Public Works
Office AddressSanta Cruz, CA, 95060, USA
Contacts
Ryan HaleyAssistant Engineer
Full Description
Show more
The San Lorenzo River seasonally shoals (closes) at its mouth, creating safety and environmental challenges for the adjacent neighborhood, beach, businesses, and nearby infrastructure. In 2025, a flood control culvert was constructed to reduce uncontrolled breaches and improve water quality for endangered fisheries. The project installed a dual-pipe drainage system designed to convey river water through the seasonal sandbar and discharge it to the ocean. This system reduces the need for mechanical breaching of the lagoon while improving water quality by removing high-salinity water from the lowest portion of the lagoon. By reducing the frequency of mechanical breaching, the project has proven to provide multiple benefits, including protection of public and private property, enhanced habitat conditions for endangered species such as tidewater goby and steelhead, and increased safety for recreational beach users. After the culvert became operational, an issue was identified with the specialized intake structures. These intakes are designed to allow continuous flow into the culvert while preventing fish from being harmed or impinged. However, because the screens have a fine mesh size, debris such as grass, small sticks, and trash can accumulate on the screens and reduce flow capacity. To address this issue, the City has designed a seasonal floating debris boom (Project) that will be installed around the intakes. The boom will intercept floating debris before it reaches the screens, helping keep the intake structures clear and ensuring the culvert system operates at full capacity during the summer months.
More opportunities from California → Public Works
Same awarding agency
Get AI-powered intelligence on this solicitation and the ones like it
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
