Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

San Lorenzo River Lagoon Culvert Debris Boom

Open
IFB No. DPW-0337State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 62 days

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
Contacts1 person available
OfficeSanta Cruz, CA, 95060, USA

Full Description

Show more
The San Lorenzo River seasonally shoals (closes) at its mouth, creating safety and environmental challenges for the adjacent neighborhood, beach, businesses, and nearby infrastructure. In 2025, a flood control culvert was constructed to reduce uncontrolled breaches and improve water quality for endangered fisheries. The project installed a dual-pipe drainage system designed to convey river water through the seasonal sandbar and discharge it to the ocean. This system reduces the need for mechanical breaching of the lagoon while improving water quality by removing high-salinity water from the lowest portion of the lagoon. By reducing the frequency of mechanical breaching, the project has proven to provide multiple benefits, including protection of public and private property, enhanced habitat conditions for endangered species such as tidewater goby and steelhead, and increased safety for recreational beach users. After the culvert became operational, an issue was identified with the specialized intake structures. These intakes are designed to allow continuous flow into the culvert while preventing fish from being harmed or impinged. However, because the screens have a fine mesh size, debris such as grass, small sticks, and trash can accumulate on the screens and reduce flow capacity. To address this issue, the City has designed a seasonal floating debris boom (Project) that will be installed around the intakes. The boom will intercept floating debris before it reaches the screens, helping keep the intake structures clear and ensuring the culvert system operates at full capacity during the summer months.

More opportunities from California → Public Works

Same awarding agency

NAICS: 236220
New
SLED
GENERAL CONTRACTOR PRE-QUALIFICATION PACKAGE TUSTIN POLICE DEPARTMENT LOCKER ROOM RENOVATION PROJECT
Solicitation # 2026-RFP-019
The City of Tustin is seeking Statements of Qualifications and completed Pre-Qualification Questionnaires from licensed General Building Contractors for the Tustin Police Department Locker Room Renovation Project. Located at 300 Centennial Way, the project involves the interior renovation of employee support spaces, including the modernization of men's and women's locker rooms, private changing areas, an employee lounge, and lactation/wellness spaces. The scope includes selective demolition, framing, drywall, flooring, painting, and the installation of new lockers and millwork. To maintain active police operations, the contractor must provide temporary facilities, including a locker room/shower trailer and an accessible restroom trailer, while adhering to ADA standards and strict security requirements, including DOJ fingerprinting and clearance for all personnel. The pre-qualification process, designed to comply with California Public Contract Code section 20101, is mandatory for any contractor wishing to bid. Evaluation is based on objective criteria, with a focus on comparable project experience in occupied municipal facilities, key personnel expertise, operational phasing experience, financial capacity, safety records, and performance history. Mandatory requirements include valid licensing, DIR registration, insurance, and bonding. Submittals must not exceed 50 pages and must be delivered via OpenGov by December 22, 2026. The City will use this process to identify the lowest responsible bidder, requiring adherence to the 2024 Standard Specifications for Public Works Construction (The Green Book) and compliance with California prevailing wage and labor laws.
Commercial and Institutional Building Construction

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS