San Rafael River Riparian Restoration
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The State of Utah Division of Wildlife Resources is seeking a single contractor for the San Rafael River Riparian Restoration project to improve wildlife habitat, remove invasive species, and reduce hazardous fuels. The scope of work involves the mechanical and chemical removal of non-native species across approximately 52 acres, specifically requiring lop and scatter services and herbicide application to cut stumps. The selected vendor must provide all necessary labor, equipment, supervision, transportation, and operating supplies. This invitation for bid will be awarded to the lowest cost responsive and responsible vendor. All project work must be completed by October 31, 2026, and the contractor is required to guarantee their pricing through the end of the project. Responses for solicitation JH27-7 are due by August 24, 2026.
General Info
Agency
NAICS
Place of Performance
UT, USASet-Aside
Documents
(8)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
The purpose of this IFB is to enter into a contract to provide: acquiring services in this contract to provide for wildlife habitat improvement, invasive species removal, and hazardous fuels reduction by mechanically and chemically removing non-native/invasive species using crews with hand saws or chainsaws and applying herbicide to the stumps that have been cut. This task order includes the Contractor furnishing labor, equipment, supervision, transportation, operating supplies, and incidentals. See the attached map for the Project layout and treatment units. Total Project area: approximately 52 acres. Line item 1: 52 acres of lop and scatter Line item 2: 52 acres of herbicide application
Mandatory Site Visit: None
It is anticipated that this IFB will result in a single contract award to the lowest cost responsive and responsible vendor.
Project Performance Time: ALL work must be completed by October 31, 2026
Vendor must guarantee its pricing through completion of the project.
Similar Contracts
Same NAICS industry code
More opportunities from Utah
Same awarding agency
