Sand Canyon Dam Liner Repair

Active
20260717046State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the repair of the asphalt concrete liner at Sand Canyon Dam in Irvine, California, under solicitation number 20260717046 issued by the Irvine Ranch Water District. The scope of work requires clearing and grubbing the work area, removing approximately 9,200 square feet of existing 4-inch thick damaged AC pavement, preparing and compacting the subgrade to 95% relative compaction, installing a new 4-inch thick AC liner, and performing crack filling on existing cracks of 1/4-inch width or greater using hot-applied rubberized asphalt material. The contractor must also regrade and compact approximately 7 feet of the adjacent slope to ensure a proper transition with the new liner. All construction activities must be completed within a strict 30-day window between October 1 and October 30, with work contingent upon issuance of a Notice to Proceed. The contract is structured as a fixed-price arrangement, with pricing submitted as lump sum items through the PlanetBids electronic portal, and no contract value is disclosed in the documentation. The award will go to the lowest responsive and responsible bidder under a Low Price Technically Acceptable (LPTA) basis, with no evaluation factors beyond responsiveness and responsibility specified. Submissions must be made electronically via PlanetBids by the deadline of August 12, 2026, and include a completed bid form, certification of a valid California contractor license, a signed non-collusion declaration, a safety program meeting Cal/OSHA standards, and compliance with California Air Resources Board regulations regarding off-road diesel equipment. Subcontractors performing more than 0.5% of the bid amount must be disclosed with their license numbers. All work must comply with Section 02100, SSPWC standards, and the project’s technical specifications, with no substitutions accepted without written approval from the district. Inspection and acceptance occur on-site, with the district retaining sole authority to reject defective work at any time, even after initial approval or payment. The contractor is responsible for notifying the district when work is ready for inspection, providing required test reports, and ensuring all materials are new and conform to specifications. No federal acquisition regulation clauses are used; instead, the contract relies on internal articles addressing changes in work, contract price or time, and warranty for defective work, with placeholder fields for quantities and adjustments. Documentation such as shop drawings, operation and maintenance manuals, and equipment lists are required post-award but not included in the

General Info

Remove and replace 9,200 sq ft asphalt pavement, crack fill, regrade slope, complete Oct 1–30 in Irvine.

Agency

California → Irvine Ranch Water DistrictView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Irvine, CA, 92603, USA

Set-Aside

NONE

Documents

(1)

Project Manual for Sand Canyon Dam Liner Repair - Project No. 12524

PDFrfp

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Irvine Ranch Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Irvine Ranch Water District
View Agency Profile
Office AddressN/A
Contacts
Laura Gates

Full Description

Show more
Bid #12524: The project consists of repairing the asphalt concrete (AC) liner at Sand Canyon Dam. The scope of work includes clearing and grubbing the work area, removing approximately 9,200 square feet of existing damaged 4-inch thick AC pavement, and preparing and compacting the subgrade to 95% relative compaction. The contractor will then install a new 4-inch thick AC liner and perform crack filling on existing cracks (1/4-inch and wider) using hot-applied rubberized asphalt material. Additionally, the contractor must regrade and compact approximately 7 feet of the adjacent slope to meet the new liner edge. All construction activities are required to be completed between October 1 and October 30.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Hagerstown Wastewater Treatment Plant Improvements - Phase 1
Solicitation # hagerstown-wastewater-treatment-plant-improvements-phase-1
The Hagerstown Wastewater Treatment Plant Improvements - Phase 1 project, managed by Carl Belt, Inc., focuses on upgrading aging infrastructure in Maryland to ensure compliance with nitrogen and phosphorous limits and NPDES thermal requirements. The scope of work includes replacing influent screens, washer compactors, in-plant and RAS pumps, and the operations building sanitary grinder pump station. Additional improvements involve installing a headworks enclosure building, a dedicated chemical storage tank for ferric chloride/alum, and upgrading motor control centers, PLCs, and switchgear. The project also includes structural repairs to concrete at the headworks and various building enhancements such as HVAC, roofing, and window replacements to improve plant reliability and water quality without increasing overall treatment capacity. This is a wage-rated solicitation under NAICS code 237110, with a response deadline of August 17, 2026, at 4:00 PM. Carl Belt, Inc. is actively seeking proposals from small businesses, including SDB, WOSB, HUBZone, and veteran-owned concerns, and specifically encourages MBE, DBE, and WBE participation for electrical, mechanical, masonry, and painting subcontractors, as well as suppliers for wastewater pumps, sluice gates, and concrete materials. Bids must be submitted to the Cumberland, Maryland office or via the designated online portal. Primary administrative contact for the project is Jared Burkett.
Carl Belt, Inc.

POSTED

about 10 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237110
New
Cypress Lake WTP, Wellfield, & Raw Water Main in Osceola County, FL
Solicitation # cypress-lake-wtp-wellfield-raw-water-main-osceola-county-fl
Wharton-Smith, Inc. is soliciting proposals from State of Florida Certified Disadvantaged Business Enterprise (DBE) subcontractors and suppliers for the Cypress Lake WTP, Wellfield, and Raw Water Main project in Osceola County, Florida, on behalf of the Central Florida Water Cooperative. The estimated project value is 270 million dollars. The comprehensive scope of work includes the construction of raw water production wells with well heads and pumps, discharge piping, a surge bladder tank, site civil work, and a wellhead cage. Additionally, the project requires the construction of an electrical building, a standby generator, Operations and Reverse Osmosis buildings, a pretreatment chemical building, a post-treatment chemical building, a post-treatment degasification system, and an odor control air exhaust dispersion stack system. Regulatory certification requirements include primary and secondary water quality analytical laboratory testing and production well disinfection. Proposals must be submitted via email to Nichole Voitel at watergmpbids@whartonsmith.com. The proposed scope of work is due at least 24 hours before the bid date, with firm pricing required by 10:00 AM on the day of the bid. The final bid deadline is August 19, 2026, at 2:00 PM EST. Bidding documents, including plans, specifications, and addenda, are available for free download through ConstructConnect. Wharton-Smith, Inc. will review responsible quotes and may negotiate terms as appropriate for the award.
Wharton-Smith, Inc.

POSTED

about 10 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237110
New
Central Coast Blue AWPF
Solicitation # central-coast-blue-awpf
Filanc is soliciting quotes for the Central Coast Blue AWPF project located at 966 Huber St., Pismo Beach, California. The scope of work involves the construction of a new Advanced Water Purification Facility with a nominal product water capacity of approximately 0.50mgd to produce 500AFY. Key technical requirements include a 200,000 gallon equalization storage tank, advanced treatment systems featuring pressurized MF/UF skids, a two-stage RO system, and a UV/AOP system. The project also encompasses post-treatment stabilization, final chlorination, chemical storage and feed systems, a purified water storage tank, a pump station, and extensive HDPE pipeline infrastructure. Additionally, the project requires the installation of one injection well and two monitoring wells for groundwater recharge. The solicitation is open to a wide range of trades, including civil works, mechanical systems, electrical, and specialized process equipment. Bids are due by 2:00 PM on August 13, 2026. This opportunity is designated as an SBA set-aside, strongly encouraging participation from small, minority-owned, women-owned, and veteran-owned businesses. All work must comply with Build America, Buy America (BABA) requirements. Interested parties can obtain plans and specifications at no cost by contacting Julia Masaitis. Filanc has expressed a commitment to equal opportunity and is willing to assist qualified small businesses with bonding, credit lines, and insurance to facilitate their participation.
Filanc

POSTED

about 10 hours ago

DEADLINE

in 2 days
View Details

More opportunities from California → Irvine Ranch Water District

Same awarding agency