Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Asphalt Concrete (AC) Liner Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Irvine Ranch Water DistrictView Agency

NAICS

238120 - Structural Steel and Precast Concrete ContractorsView NAICS

Place of Performance

Irvine, CA, 92603, USA

Set-Aside

NONE

Documents

This scope was carved out of 12524.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Sand Canyon Dam Liner Repair

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Irvine Ranch Water District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Irvine Ranch Water District
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply and installation of new asphalt concrete liner, including paving, rolling, and finishing.

Similar Contracts

Same NAICS industry code

More opportunities from California → Irvine Ranch Water District

Same awarding agency

NAICS: 237110
SLED
Sand Canyon Dam Liner Repair
Solicitation # 12524
The contract involves the repair of the asphalt concrete liner at Sand Canyon Dam in Irvine, California, under solicitation number 20260717046 issued by the Irvine Ranch Water District. The scope of work requires clearing and grubbing the work area, removing approximately 9,200 square feet of existing 4-inch thick damaged AC pavement, preparing and compacting the subgrade to 95% relative compaction, installing a new 4-inch thick AC liner, and performing crack filling on existing cracks of 1/4-inch width or greater using hot-applied rubberized asphalt material. The contractor must also regrade and compact approximately 7 feet of the adjacent slope to ensure a proper transition with the new liner. All construction activities must be completed within a strict 30-day window between October 1 and October 30, with work contingent upon issuance of a Notice to Proceed. The contract is structured as a fixed-price arrangement, with pricing submitted as lump sum items through the PlanetBids electronic portal, and no contract value is disclosed in the documentation. The award will go to the lowest responsive and responsible bidder under a Low Price Technically Acceptable (LPTA) basis, with no evaluation factors beyond responsiveness and responsibility specified. Submissions must be made electronically via PlanetBids by the deadline of August 12, 2026, and include a completed bid form, certification of a valid California contractor license, a signed non-collusion declaration, a safety program meeting Cal/OSHA standards, and compliance with California Air Resources Board regulations regarding off-road diesel equipment. Subcontractors performing more than 0.5% of the bid amount must be disclosed with their license numbers. All work must comply with Section 02100, SSPWC standards, and the project’s technical specifications, with no substitutions accepted without written approval from the district. Inspection and acceptance occur on-site, with the district retaining sole authority to reject defective work at any time, even after initial approval or payment. The contractor is responsible for notifying the district when work is ready for inspection, providing required test reports, and ensuring all materials are new and conform to specifications. No federal acquisition regulation clauses are used; instead, the contract relies on internal articles addressing changes in work, contract price or time, and warranty for defective work, with placeholder fields for quantities and adjustments. Documentation such as shop drawings, operation and maintenance manuals, and equipment lists are required post-award but not included in the
Water and Sewer Line and Related Structures Construction

POSTED

22 days ago

DEADLINE

in about 19 hours
View Details