Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Sandmound Boulevard Water Systems Consolidation Project

Forecast
2025-00300State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Sandmound Boulevard Water Systems Consolidation Project, identified by solicitation number 2025-00300, is a forecasted infrastructure initiative managed by the Diablo Water District in Oakley, California. The primary objective of the project is to consolidate four distinct drinking water systems—M-27 Willow Park Marina (serving Willow Park Marina and Mariner Estates), Sandy Point Mobile Home Park, Delta Mutual Water Company, and Oakley Municipal Water Company—into the Diablo Water District service area. The scope of work involves significant civil engineering tasks, including the installation of a new water main pipeline, the replacement of service laterals, and the installation of valves and fire hydrants within existing paved roadways. The project has undergone environmental review in accordance with the California Environmental Quality Act (CEQA) and the State CEQA Guidelines. A Mitigated Negative Declaration was prepared and adopted via Resolution No. 2025-15, certifying that the project will not have significant environmental impacts provided that the adopted mitigation measures are implemented. The place of performance is located within the City of Oakley and Contra Costa County. While specific contract values, pricing schedules, and period of performance details are not provided in the current documentation, the project is officially documented through a Notice of Determination filed on October 28, 2025.

General Info

Diablo Water District will consolidate four water systems via new pipeline and infrastructure installation.

Agency

California → Diablo Water District

Place of Performance

Sandmound Blvd/Bethel Island Rd, Sandmound Blvd./south of E. Cypress Rd., E. Cypress Rd/E.Summer, Oakley, CA, 94561

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Diablo Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Diablo Water District
Office AddressN/A

Full Description

Show more
The project will consolidate four separate drinking water system,M-27 Willow Park Marina (serving Willow Park Marina and Mariner Estates), Sandy Point Mobile Home Park, Delta Mutual Water Company, and Oakley Municipal Water Company,into the service area of the Diablo Water District. Including the installation of a new water main pipeline, replacement of service laterals, installation of valves and fire hydrants within existinq paved roadways.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 16 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS