Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Washington was posted on October 31, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sanitary Sewer and Water Main Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The contract entails the installation of a 12-inch ductile iron water main system adhering to AWWA standards and DIPRA guidelines, encompassing all critical phases such as bedding, backfilling, compaction, joint assembly, thrust blocking, and pressure testing. The work requires meticulous attention to material specification and installation technique to ensure long-term integrity and compliance with industry best practices, including the use of detectable marking tape for future utility identification. All activities must be performed in accordance with technical requirements that prioritize safety, durability, and regulatory compliance. This subcontract is issued by the City of University Place in Washington under NAICS code 237110 for public infrastructure development, with a response deadline of November 21, 2024. The project is part of broader municipal efforts to upgrade water distribution infrastructure and is open for bid through the city’s official portal, though specific location details and point of contact information are not provided in the contract data. Bidders must be prepared to meet all engineering and construction standards outlined without deviation, and the successful contractor will be responsible for the full scope of work from mobilization through final inspection and acceptance.

General Info

Install 12-inch ductile iron water main per AWWA/DIPRA standards with full compliance and detectable tape.

Documents

This scope was carved out of 44.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

57th Avenue Public Sewer Extension Phase 1

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of University Place
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of a 12-inch ductile iron water main system including pressure testing, bedding, backfilling, compaction, joint assembly, thrust blocking, and detectable marking tape in compliance with AWWA standards and DIPRA guidelines.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS