Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Sanitary Sewer Main Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of RCP2023-21228.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

La Palma Alleys Sewer Improvement Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → Public Works
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs excavation and installation of sanitary sewer piping for prime contractors on City of Anaheim public works projects. Replaces existing 6-inch diameter pipes with 8-inch minimum standard pipes, removes siphons, and corrects pipe sags per the Central Anaheim Master Plan of Sanitary Sewers. Delivers a completed and tested 8-inch sanitary sewer system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter, as well as 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include the installation of standard and doghouse manholes, interior drop assemblies, and the completion of the CSO regulator fit out and outfall. Site preparation tasks consist of clearing and grubbing over 5,100 square yards of wooded areas, seeding, fine grading, and select tree removal. Key project deliverables also include the implementation of a Stormwater Pollution Prevention Plan (SWPPP), geotechnical instrumentation and monitoring, and the maintenance of flows and bypass for all pipes and manholes. Specialized requirements include the procurement of railroad insurance.
Cleary Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, identified as Project No. SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days following the Notice to Proceed. The contract is administered by the City of Belmont with Willis Engineers serving as the representative. Award will be granted to the responsible bidder submitting the lowest responsive bid, with specific evaluation criteria focusing on bidder qualifications, financial ability, and the submission of required Good Faith Efforts and Table A forms. The project mandates strict adherence to ANSI/AWWA and ASTM standards for materials and requires performance and payment bonds. Additionally, the contract establishes socioeconomic participation goals, including an EPA MBE goal of 10.9 percent and a combined State of North Carolina MBE/WBE goal of 10 percent. Payment is processed via Applications for Payment and becomes due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 11 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking qualified DBE, MBE, WBE, and SBE subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of open and covered concrete structures, relining or replacing steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additional technical requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, motor control center component replacement, and modifications to sluice and slide gates. The project also encompasses the installation of access platforms, rerouting sump pump discharge lines, excavation, trench work, and surveying. This solicitation is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid for reimbursement. Requested services and supplies include lead abatement, rebar, metals fabrication, painting, trucking, concrete resurfacing, and FRP reinforcing systems. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 19 days
View Details

More opportunities from California → Public Works

Same awarding agency

NAICS: 237310
New
SLED
Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083)
Solicitation # CIP 20083
The Tustin Legacy Linear Park - Phase 3 Between Armstrong to Warner (CIP No. 20083) is a public works solicitation by the City of Tustin, California, for the construction of park infrastructure. The scope of work includes site excavation, plumbing, electrical, instrumentation, street improvements, and the installation of a 12-foot multi-modal path and a 6-foot walking trail. The project has an engineer's estimate of 11,100,000 dollars and a project schedule of 190 contract days. Bidders must hold a Class A contractor's license and submit their proposals via the OpenGov portal by December 10, 2026, at 2:00pm. A critical requirement for responsiveness is the submission of the bid bond both as an electronic upload and as a hard copy delivered to the City Clerk. The contract will be awarded to the low bidder based on the total sum of correctly calculated unit prices. The successful contractor must provide a project baseline schedule within 15 calendar days of execution and adhere to strict safety and quality standards, including Cal-OSHA requirements for qualified persons working near utilities and 2008 ADA Standards for Accessibility. Payment is structured as monthly progress payments at 95 percent of the work value, with the final 5 percent retained until 60 days after the recordation of the Notice of Completion. Liquidated damages are set at 8,800 dollars per calendar day for delays. Required post-award documentation includes payment, faithful performance, and guaranty bonds, as well as a compensation insurance certificate.
Highway, Street, and Bridge Construction

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details
New
SLED
La Palma Alleys Sewer Improvement Project
Solicitation # RCP2023-21228
The La Palma Alleys Sewer Improvement Project, solicitation RCP2023-21228, is a public works initiative by the City of Anaheim to address capacity and operational deficiencies within its sanitary sewer system. The primary objective is to replace outdated 6-inch diameter pipes with the current 8-inch minimum standard to mitigate root intrusion and offset joints. Additionally, the project focuses on resolving specific operational failures, including the removal of a siphon at the intersection of La Palma and Harbor and the correction of a previously unknown sag between manholes SW070319 and SW071102. The scope also includes the design of neighborhood greening and stormwater capture systems using modified tree wells and catch basins, with all work adhering to the Central Anaheim Master Plan of Sanitary Sewers and City Design Standards. The City utilizes a qualifications-based selection process to award the contract, ranking consultants based on their expertise and the qualifications of key personnel. Selected firms must provide a Preliminary Design Report and CAD drawings, while adhering to strict administrative requirements, including bi-weekly status reports and monthly invoicing tied to a Work Breakdown Structure. Compliance mandates include the use of California prevailing wage rates, Buy America requirements, and the submission of various certifications regarding non-collusion, non-lobbying, and equal employment opportunity. Final acceptance of the work is contingent upon the submission of CCTV inspection videos for all pipes exceeding four inches in diameter and the successful restoration of ADA ramps. Proposals must be submitted electronically via OpenGov by December 3, 2026.

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 238210
New
SLED
On-Call Industrial Electricians for Regional Water Quality Control Plant
Solicitation # IFB199384
The City of Palo Alto is soliciting bids under IFB199384 for on-call industrial electrical services at the Regional Water Quality Control Plant. The selected contractor will provide personnel, supervision, and technical support for scheduled preventive maintenance, troubleshooting, and 24-hour emergency repairs to ensure the reliable operation of wastewater treatment systems. The contract is established on a non-exclusive, as-needed basis with a total spending ceiling of 2,000,000 dollars over a five-year term, with an annual expenditure limit of 800,000 dollars. Qualified bidders must hold an active California C 10 Electrical Contractor license, maintain current DIR registration, and demonstrate at least five years of industrial electrical experience, including specific experience with continuous process industrial facilities. Personnel requirements are stringent, requiring journey-level training and specific years of experience for both general and lead electricians, with specialized skills needed for systems up to 12kV. The contractor is required to provide performance and payment bonds totaling 100 percent of the contract sum and adhere to the Palo Alto Minimum Wage Ordinance and prevailing wage requirements. Deliverables include next-business-day service reports and final technical records within five business days of each assignment. Bids are due by November 19, 2026, at 3:00 pm.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 18 hours ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS