Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on December 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sanjo Street Widening, Paving, Drainage, and Sidewalk Improvements Project

Closed
PE-66760-NONST-2026-000000008State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Sanjo Street Widening, Paving, Drainage, and Sidewalk Improvements Project is a Community Development Block Grant funded initiative for the City of Dacula, Georgia. The scope of work involves the demolition of the existing one-way asphalt road on Sanjo Street and its widening from approximately 13 feet to 26 feet to accommodate two-way traffic. Key construction activities include installing a new base and pavement section, constructing new curb and gutter, and implementing stormwater management improvements through the installation of new storm drainage pipes and structures within city right-of-ways and easements. The project also requires the removal of asbestos on a city-owned parcel and the application of thermoplastic pavement markings, including stop bars, centerlines, and ADA-compliant crosswalks, in accordance with Georgia DOT standards. This solicitation, identified by number PE-66760-NONST-2026-000000008, was posted on December 10, 2025, with a response deadline of January 22, 2026. The City of Dacula will award the contract to the lowest responsive, responsible, and qualified bidder based on a lump sum, fixed-price proposal. Evaluation factors include the bidder's reputation, past performance on similar work, and the quality of materials and equipment offered. The contractor is required to provide a time-scaled Critical Path Method schedule and maintain a dedicated on-site superintendent. Compliance with the Davis-Bacon Act, HUD Section 3 requirements, and various environmental regulations, including the Clean Air and Clean Water Acts, is mandatory. Payment will be processed within 30 days of receipt of certified AIA Form G702/G703 applications.

General Info

Place of Performance

GA, USA

Set-Aside

NONE

Documents

2
PDF, High priority: read this first250 pages · project-manual
High
PDF, Low priority22 pages · supporting-documents
Low

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Vallejo Ferry Terminal Reconfiguration ProjectOpen now, due in 4 days
  • Site Grading and Excavation for AccessibilityOpen now, due in 16 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Dacula
Contacts1 person available
OfficeN/A

Full Description

Show more
The scope of work includes demolition of Sanjo Street which is an existing one-way asphalt road; widening of the road to improve it for two-way traffic; installing new base and pavement section; and installing new storm drainage pipes and structures within the city right-of-way and easements.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS