Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Santa Margarita Lakefill Electrical Service Replacement, C-1348E.01

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Santa Margarita Water District is preparing to replace the existing Southern California Edison utility electrical meter panel and control panel at Rancho Santa Margarita, California, to ensure reliable power delivery and proper operational control for the current infrastructure. This project, identified as C-1348E.01, is slated for advancement with a posted forecast date of July 20, 2026, and will require the removal and installation of critical electrical components to maintain system integrity and service continuity. The work is expected to be performed at the facility located in zip code 92688, with all activity centered within the city of Rancho Santa Margarita. Chief Engineer Patricia A. Butler serves as the primary point of contact for this procurement, with inquiries directed to her email and phone number. While the solicitation number, NAICS code, and set-aside details are not yet specified, the project is formally recognized under the agency’s capital improvement planning and is accessible via the California Environmental Quality Act Network. The replacement effort underscores the district’s commitment to modernizing utility infrastructure to support long-term operational needs without disruption to existing services.

General Info

Replace electrical meter and control panels in Rancho Santa Margarita by July 20, 2026, for reliable power delivery.

Agency

California → Santa Margarita Water District

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Santa Margarita Parkway and Antonio Parkway, Rancho Santa Margarita, CA, 92688

Set-Aside

NONE

Documents

(1)

Santa Margarita Lakefill Electrical Service Replacement C-1348E Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Margarita Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Santa Margarita Water District
Office AddressN/A
Contacts
Patricia A. ButlerChief Engineer

Full Description

Show more
Replace the existing SCE utility electrical meter panel and existing control panel. These replacements ensure proper power and control for the existing infrastructure.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Operational Security Cameras Bagwell and North Cargo AreasThe contract entails the full spectrum of design, permitting, and construction services required to install 50 high-resolution surveillance cameras across 43 distinct locations in the Bagwell and North Cargo Operations areas of the Port of Seattle. The primary objective is to enhance security and operational oversight by replacing outdated systems with advanced imaging technology that supports detailed forensic investigations and enforces the Port’s movement rules and regulations. In the Bagwell area, the new camera network will expand coverage to include key drive lanes and entrances, areas currently under-monitored as existing units focus on conveyor systems and security doors. In the North Cargo Operations zone, the solution will introduce flexible, user-controlled Pan Tilt Zoom units to deliver dynamic, broad-area surveillance that adapts to varying operational needs. The project is managed by the Aviation Project Management Group under the Port of Seattle, with primary point of contact Angela Peterson and Project Manager Randa Williams available for coordination. The effort aligns with NAICS code 238210 for electrical contractors and is posted as a forecast with no set-aside designation. The installation will significantly upgrade the Port’s existing security infrastructure, ensuring comprehensive visual monitoring of critical cargo movement corridors and operational zones to improve safety, accountability, and regulatory compliance. All work must be completed in accordance with Port requirements and timelines, with no detailed solicitation number yet assigned but available through the official portal link for ongoing updates.
Aviation Project Management Group

POSTED

about 17 hours ago

DEADLINE

N/A
View Details