Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Satin Black Powder-Coated Round Sign Posts Supply

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

NAICS

332312 - Fabricated Structural Metal ManufacturingView NAICS

Place of Performance

UT, USA

Set-Aside

NONE

Documents

This scope was carved out of 2026-029.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

IFB - Sign Posts 2026

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeN/A
Organization / Agency
Utah
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies 370 round sign posts for prime contractors on City of South Jordan Public Works projects. Fabricates 2 3/8” diameter x 11’ length posts using 16 gauge ASTM-A653, G90, HSLAS, Type B steel and applies a Satin Black powder-coating. Ensures compliance with F.H.W.A. and ASHTO standards under NCHRP Report #350. Delivers 370 finished, coated sign posts.

Similar Contracts

Same NAICS industry code

NAICS: 332312
New
International
Supply and Delivery of Transmission Line Structures - Muskrat Falls, NL
Solicitation # 109685 SY
Newfoundland Labrador Hydro has issued Request for Quotations 109685 SY for the supply and delivery of transmission line structures for Muskrat Falls, NL. The scope of work involves providing various tower components, including hardware, fasteners, plates, and angles, in accordance with Engineering Standard NAL-EG-ED-0000-CV-SD-0005-01 and specific project drawings. Deliverables must be shipped under DDP terms, landed and insurance paid to the destination, with a required on-site date of December 1, 2026. All steel destined for ocean transport requires a dichromate dip or approved treatment, and all pieces must be stamped with specific erection marks using steel dies at least 16 mm high. The procurement process follows a three-stage evaluation consisting of mandatory submission review, mandatory technical assessment, and pricing evaluation. Bidders must provide proof of Commercial General Liability Insurance with a minimum coverage of five million dollars per accident or occurrence and comply with Bill S-211 regarding forced and child labour. Quality control includes mandatory factory acceptance testing reports submitted ten business days prior to dispatch and the inspection of full-scale trial assemblies by the Engineer. Payment is issued within thirty days of receiving a satisfactory invoice that includes the purchase order number, item number, and a separate breakdown of HST. Quotations must be submitted electronically by October 13, 2026.
Newfoundland Labrador Hydro

POSTED

about 23 hours ago

DEADLINE

in 25 days
View Details

More opportunities from Utah

Same awarding agency

NAICS: 238110
New
SLED
Upper PI Pond Joint Repair
Solicitation # PI2026001
The City of American Fork is soliciting bids for the Upper PI Pond Joint Repair project, solicitation number PI2026001. The scope of work involves repairing failing or cracking waterstop joints in the Upper Pond of the city's pressure irrigation system. This process requires the removal of damaged concrete sections and the installation of new waterstop, rebar, and concrete. The project includes specific quantities for mobilization, 1,600 square feet of concrete demolition and patching, and 1,110 linear feet of existing waterstop joint sealing. All work must adhere to American Public Works Association standards and City of American Fork design specifications. A mandatory pre-bid conference is scheduled for September 22, 2026, at 10:00 AM at the Upper PI Pond site. Electronic bids must be submitted via the U3P/Bonfire portal by October 5, 2026, at 12:00 PM local time, with the award expected on October 13, 2026. The contract will be awarded to the lowest responsive and responsible bidder. Qualified bidders must provide a valid state contractor's license, a financial statement, a resume for the on-site manager, and details on three similar recently completed projects. The project timeline requires substantial completion by December 3, 2026, and final completion by December 17, 2026. Bidders must provide a bid bond for 5 percent of the total bid amount, and the successful contractor will be required to execute both performance and payment bonds. Compliance with various federal and state regulations is mandatory, including the Clean Air Act, the Clean Water Act, the Copeland Anti Kick-back Act, and Executive Order 14173. The contractor is responsible for all required testing and inspection services as specified in the contract documents.
Poured Concrete Foundation and Structure Contractors

POSTED

about 19 hours ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS