Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on June 3, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

SATOC for Matagorda Ship Channel-Peninsula to Point Comfort, Matagorda, TX Pipeline Dredging

Closed
W912HY-24-S-10CMFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 9 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 9 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 9 hours ago

DEADLINE

in about 21 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 9 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 14 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Matagorda, TX, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W076 Endist Galveston
Contacts2 people available
OfficeGALVESTON, TX, 77550-1229, USA
Office AddressGALVESTON, TX, 77550-1229, USA

Full Description

Show more
This is a SOURCES SOUGHT NOTICE (W912HY-24-S-10CM); a market survey for information only, to be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS NOTICE. No reimbursement will be made for any costs associated with providing information or industry response to this notice or any follow up information requests. Not responding to this notice does not preclude participation in any future procurement. If a solicitation is released, it will be synopsized in the System for Award Management (SAM). It is the responsibility of potential offerors to monitor SAM for additional information pertaining to this requirement. The acquisition strategy will be determined based on responses received from this notice and/or other market research methods. The planned acquisition strategy will be posted in SAM upon completion of market research analysis. The purpose of this notice is to gain knowledge of interest, capabilities, and qualifications of industry, to include the Small Business Community: Small Business, Section 8(a), Historically Underutilized Business Zones (HUB-Zone), Service-Disabled Veteran-Owned Small Business (SDVOSB), or Women-Owned Small Business (WOSB) / Economically Disadvantaged Women-Owned Small Business (EDWOSB). All are highly encouraged to respond. Based on selected NAICS 237990, pick either WOSB or EDWOSB, do not identify both. The U.S. Army Corps of Engineers, Galveston District has been tasked to solicit for and award a five year (5) Single Award Task Order (SATOC) for pipeline dredging of Matagorda Ship Channel-Peninsula to Point Comfort. Anticipated project will be a competitive, firm-fixed price, Single Award Task Order Contract (SATOC) procured in accordance with FAR 15, Negotiated Procurement using - Lowest Price, Technically Acceptable process. The Government is seeking experienced firms for Pipeline Dredging capable of dredging 20,000 cubic yards/per day. Minimum experience requirements: Contractor must demonstrate - recent and - relevant experience on Pipeline Dredging completed or substantially completed to the Matagorda Ship Channel project. The project description shall contain enough information for the Government to clearly and easily understand how the project is relevant to this notice. Contractor shall submit a minimum of three (3), but no more than five (5) projects, at least one project successfully completed within the last 5 years. Challenges to the project: Open Bay system with high winds at times. Minimum equipment required includes cutterhead pipeline dredge that can work in open bay conditions of Matagorda Bay and has successful history of working in open bay areas. In accordance with FAR 36/DFARs 236, the estimated construction price range for this project is: Between $25,000,000 and $100,000,000. The contract period of performance is for a base and four (4) options. The total contract capacity will not exceed $100,000,000.00. The estimated minimum size of a task order is $8,000,000.00. The estimated maximum size of a task order is $15,000,000.00 with the average size task order of $8,000,000.00. Firms must have ability to perform up to 2 task order(s) simultaneously. The North American Industry Classification System code for this procurement is 237990 which has a small business size standard of $37 Million. The Product Service Code is Z1KB. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting. General Construction: This applies to NAICS 236 and 237. General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded. Dredging: To be considered small for purposes of Government procurement, a firm or its similarly situate subcontractors must perform at least 40% of the volume dredged with its own equipment or equipment owned by another small dredging concerns. Should this action be solicited as Full and Open Competition, a Small Business Participation Proposal will be identified as an evaluation factor in the solicitation. LPTA/IFB requires SBSP statement. Large Business(es) must comply with FAR 52.219-9 by submitting an acceptable Small Business Subcontracting Plan. Moratorium ends Sep 2024. Do not use statement currently. New language states: Keep, just in case'Should the acquisition be set-aside for the 8(a) program, 8(a) firms are reminded the need to have a bona-fide office in the geographical area where work is to be performed as determined by the U.S. Small Business Administration. Prior Government contract work is not required for submitting a response to this notice. However, respondents are reminded that all construction performance must follow the USACE Safety and Health Requirements Manual (EM 385-1-1), and must also comply with all Federal, State and local laws, ordinances, codes and/or regulations. Anticipated solicitation issuance date is on or about February 7, 2025, and the estimated proposal due date will be on or about March 7, 2025. The official notice citing the solicitation number will be issued in Procurement Integrated Enterprise Environment (PIEE) and firms are to register electronically to receive a copy of the solicitation when it is issued. Firm response to this Notice shall be limited to 5 pages and shall include the following information: 1. Firm's name, address, point of contact, phone number, and e-mail address. 2. Firm's interest in bidding on the solicitation when it is issued. 3. Firm's experience to perform the magnitude and complexity outlined in the Scope of Work above by providing: Brief description of the project, customer name, and dollar value of the project - provide at least 3 examples. 4. Firm's Business Size - LB, SB, 8(a), HUBZone, SDVOSB, or WOSB. 5. Will the firm submit a response as a Joint Venture or other arrangement? If YES, specific type: Joint Venture, Mentor-Prot'g, Teaming Arrangement, or Other 6. Firm's Bonding Capacity (construction bonding level per contract and aggregate construction bonding level, both expressed in dollars) via letter from bonding company. This announcement and all information will be issued via the Government Point of Entry, SAM.gov. Responses can be emailed to Mr. Hodges at Willie.E.Hodges@usace.army.mil or Mr. Babb at Jeremy.Babb@usace.army.mil . Offerors must be active in SAM to be eligible for award of Government contracts, including documenting Sec. 889 Compliance in SAM that include FAR 52.204-24 and FAR 52.204-25. Contracting will verify the 889(a) and (b) compliance - per FAR 52.204-26. Award cannot be issued for non-compliance until SAM Registration is complete, otherwise offerors will not be eligible for award. The Supplier Performance Risk System (SPRS) is the Department of Defense, single, authorized application to retrieve supplier performance information. SPRS is a web-enabled enterprise application that gathers, processes, and displays data about the performance of suppliers and must be completed prior to an award in accordance with DFARS 204.7303(b)(1), DFARS 204.7304(e), DFARS 252.204-7020, DoDI 5000.79. Review NIST SP 800-171 for further information. Interested Firms shall respond to this Notice no later than, 2:00 PM, on 3 July 2024. Email your response to willie.e.hodges@usace.army.mil, Galveston District, 2000 Fort Point Road, Galveston, TX 77550-1229. EMAIL IS THE PREFERRED METHOD WHEN RECEIVING RESPONSES TO THIS NOTICE.

More opportunities from Department Of Defense → W076 Endist Galveston

Same awarding agency

NAICS: 237990
New
Federal
Gulf Intracoastal Waterway High Island to Causeway with Channel to Port Bolivar Maintenance Dredging
Solicitation # W912HY26BA019
Solicitation W912HY26BA019 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers, Galveston District, for pipeline maintenance dredging of the Gulf Intracoastal Waterway from High Island to Causeway, including the channel to Port Bolivar, in Texas. The primary scope of work involves dredging approximately 959,000 cubic yards of material, with additional options for the Galveston Alternate Route, Offatts Bayou Channel, and the Bolivar Ferry Channel, as well as beneficial use placement at the Joycelyn Nungaray area. The project requires all dredged material to be placed in designated nearby areas and mandates strict adherence to the USACE Safety and Health Requirements Manual EM 385-1-1 and design standard ER 1110-1-8152. The performance period for the base requirements is 165 calendar days from the notice to proceed, with various shorter durations for optional line items. Bidders must provide a bid guarantee of 20 percent of the offer or 3 million dollars, whichever is less, and furnish performance and payment bonds at 100 percent of the contract amount upon award. Evaluation is conducted via sealed bidding, with preferences given to HUBZone and other small business concerns. Contractors are required to maintain an effective Quality Control system and submit payment requests electronically through Wide Area WorkFlow. All proposals must be submitted via the PIEE Solicitation Module by October 29, 2026.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

in 9 days
View Details
NAICS: 237990
Federal
FY26 HOUSTON SHIP CHANNEL, TEXAS BAYPORT FLARE HOPPER DREDGING
Solicitation # W912HY26BA018
Solicitation W912HY26BA018 is an unrestricted sealed bid for the FY26 Houston Ship Channel, Texas Bayport Flare Hopper Dredging project, managed by the US Army Engineer District Galveston. The project involves maintenance hopper dredging in Chambers and Galveston County, Texas, with excavated material to be placed at Ocean Dredged Material Disposal Sites. The estimated contract value ranges between 25 million and 100 million dollars. The scope includes mobilization, dredging operations with bed leveling, and the implementation of an Endangered Species Protection Plan. The contractor must adhere to strict safety and communication protocols, including USACE EM 385-1-1 (2024) standards and Houston-Galveston Vessel Traffic Service reporting. The contract requires work to commence within 10 calendar days of the notice to proceed, with a total completion period of 85 calendar days. Award is based on the apparent low bidder, with a 10 percent price evaluation preference for HUBZone small business concerns. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and the Resident Management System or Construction Management Platform for contract administration and handling Controlled Unclassified Information. Bidders must submit electronic proposals via the PIEE solicitation module, providing a bid guarantee of 20 percent of the offer or 3 million dollars, whichever is less. Performance and payment bonds are required, and the project is subject to Davis-Bacon Act wage standards.
Other Heavy and Civil Engineering Construction

POSTED

20 days ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS