Scotts Flat Spillway Improvements Project
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → Nevada Irrigation District
NAICS
N/A
Place of Performance
Nevada City, CA, 95959Set-Aside
NONE
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → Nevada Irrigation District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Nevada Irrigation District
Office AddressN/A
Contacts
Interested Companies (1)
StantecPasadena, CA
Full Description
Show more
The Proposed Project involves the replacement of the existing Scotts Flat Spillway trapezoidal chute with a rectangular chute (i.e., new chute floor with vertical side walls) and a new subdrain system, along with a flip bucket terminal structure. The upper plunge pool would be removed and replaced, the lower plunge pool would be excavated, and new rock armoring would be installed, all to meet the updated PMF flow of up to 23,990 cfs and help with erosion and scour protection. During construction of the Proposed Project, there would be no changes to existing reservoir level or stream releases. This is because construction would occur during the dry season when only the unimpaired low level outlet is in use, not the spillway. During construction, prior to each rainy season, the construction site would be stabilized, and repairs paused such that the spillway can pass flooding flows should it be necessary. Additionally, post-construction operations would be the same as current reservoir, release, and hydropower operations; no changes are proposed. For public safety during active construction, public access and recreation activities would not be permitted in the Proposed Project area but could resume at the end of each construction season when the site is stabilized. NID public noticing to the community for such construction-related closures began in 2025 and has continued through 2026.
The new spillway chute, upper plunge pool, and lower plunge pool improvements would be located within the same approximate footprint as the existing facility. The total footprint for the Proposed Project (which includes the work areas and all staging/access) occupies approximately 31 acres.
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
