Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

SCR 17 PM 7.61 Drainage System Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 5 is planning a geotechnical site investigation for the SCR 17 PM 7.61 Drainage System Replacement project in Santa Cruz County, California, with work to be conducted entirely within existing pavement limits. The project involves abandoning an existing culvert using slurry cement and replacing it with a new reinforced concrete pipe culvert, requiring detailed subsurface characterization to support design and construction. The investigation will include drilling vertical soil borings to perform in-situ Standard Penetration Tests, collect undisturbed and disturbed soil samples for laboratory classification, and develop a comprehensive subsurface soil profile. These efforts are essential to assess potential geotechnical hazards and ensure the stability and safety of the new culvert installation. Field activities are confined to the project site at State Route 17, post mile 7.61, ZIP code 95066, with inspection and acceptance responsibility resting with Caltrans as the approving and performing agency. The project is currently in a forecast stage, with a posted date of July 14, 2026, and no formal solicitation number, contract value, or detailed pricing information available. While environmental compliance has been addressed through a filed Notice of Exemption under California Public Resources Code §§ 21080 and 21110, no standard federal contract clauses, evaluation factors, payment instructions, packaging requirements, or special contract provisions are documented in the available materials. The lead contact for the project is Lucas Marsalek, Senior Environmental Scientist Supervisor, reachable via phone and email, though no Contracting Officer’s Representative, Procuring Contracting Officer, or key personnel requirements are specified. No deadlines, submission protocols, or offeror certifications are defined in the current documentation, indicating that this is a planning-level notice pending formal procurement documentation.

General Info

Caltrans to conduct geotechnical investigation for culvert replacement at SR-17 PM 7.61, Santa Cruz County, 2026.

Agency

California → Caltrans, District 5 - San Luis Obispo/Santa Barbara

NAICS

541380 - Testing Laboratories and ServicesView NAICS

Place of Performance

State Route 17 and Vine Hill Road, CA, 95066

Set-Aside

NONE

Documents

(1)

Notice of Exemption for SCR 17 PM 7.61 Drainage System Replacement

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 5 - San Luis Obispo/Santa Barbara
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 5 - San Luis Obispo/Santa Barbara
Office AddressN/A
Contacts
Lucas MarsalekSenior Environmental Scientist Supervisor

Full Description

Show more
Caltrans Geotechnical Design proposes a geotechnical site investigation for the SCR 17 PM 7.61 Drainage System Replacement. The project proposes abandoning an existing culvert with slurry cement and replacing it with a new reinforced concrete pipe culvert. Recommendations for the improvements requires a subsurface investigation to determine the soil and site conditions by drilling vertical soil borings to perform in-situ soil testing utilizing Standard Penetration Tests, collect soil samples for laboratory testing and classification, and developing a subsurface soil profile. The subsurface investigation is also needed to assess the potential for geotechnical hazards associated with the design and construction of the new culvert. All drilling will occur within pavement limits.

Similar Contracts

Same NAICS industry code