Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on October 17, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Seattle Municipal Tower 44-50 SPU Tenant Improvements

Closed
PW#2024-047State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves comprehensive tenant improvements to the Seattle Public Utilities offices located on floors 44 through 50 of the Seattle Municipal Tower, covering approximately 140,874 square feet. The scope includes demolition, structural reinforcement, construction of new walls, installation of doors, glazing, frames, built-in casework, ceiling modifications, and revisions to sprinkler, plumbing, mechanical, electrical, and fire alarm systems. Additionally, the project entails finish work and coordination with owner-furnished and installed equipment such as furniture, IT cabling, AV systems, security systems, and signage. The work is organized into three separate schedules, each separated by two weeks, with specific floors assigned to each schedule and staggered start dates to ensure smooth progression. The completion order within each schedule is specified, with floors to be finished in a designated sequence. The project also includes alternates and allowances, notably Alternate No. 1, which involves removing and replacing the freight elevator lobby CIR3 double doors, frames, and hardware. The contract solicitation, posted by the Washington Public Works agency under solicitation number PW#2024-047, has a response deadline of November 12, 2025, and is valued between 20 and 30 million dollars. The primary point of contact is Pamela Honma, reachable via email and phone, and further project details are accessible through the provided online procurement portal.

General Info

Place of Performance

WA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → Public Works
Contacts1 person available
OfficeN/A
Organization / AgencyWashington → Public Works
Office AddressN/A

Full Description

Show more
Project Description: The project includes tenant improvements to the existing Seattle Public Utilities offices on floors 44, 45, 46, 47, 48, 49, and 50 of Seattle Municipal Tower. The work is approximately 140,874 sf and includes demolition, structural reinforcement, construction of new walls, installation of doors, glazing and frames, built-in casework, ceiling revisions, sprinkler, plumbing, mechanical, electrical, and fire alarm revisions, finish work, and coordination with owner furnished and installed equipment (furniture systems, IT cabling, AV systems, security systems, signage, etc.) per plan.The work is divided into three separate schedules, separated by 2 weeks in between the finish and start of each schedule; permitted separately. Schedule dates to be coordinated with the owner.Schedule 1 includes floors 46 and 48. The start dates of the floors within this phase need to be staggered by a minimum of two weeks. Floors are to be completed in the following order: 46 and then 48.Schedule 2 includes floors 44 and 45. The start dates of the floors within this phase need to be staggered by a minimum of two weeks. Floors are to be completed in the following order: 44, and then 45.Schedule 3 includes floors 47, 49, and 50. The start dates of the floors within this phase needs to be staggered by a minimum of two weeks. Floors are to be completed in the following order: 47, 49, and then 50.Project alternates and allowances also listed in plans and specifications.Alternate No. 1: Remove the Replacement of Freight Elevator Lobby CIR3 Double Doors, Frames, and Hardware.

More opportunities from Washington → Public Works

Same awarding agency

NAICS: 237310
New
SLED
East Marginal Way S Preservation (FHWA)
Solicitation # 2025-057
The East Marginal Way S Preservation project (PW# 2025-057) is a federally funded solicitation by the City of Seattle Public Works to improve the roadway from 1st Ave South to the Tukwila City Limits. With an engineer's estimate of $10,800,000, the scope of work includes pavement overlay, spot base repairs, milling, excavation, and rechannelization to accommodate a protected bike lane and shared use path. Additional infrastructure requirements encompass the installation of curb ramps, sidewalks, drainage, signals, street lighting, signing, striping, and landscaping, with specific emphasis on electrical work and rebar installation. The project must be physically completed within 250 working days of the Notice to Proceed. The contract will be awarded to the lowest responsive bidder based on the Total Base Bid price. Bidders must comply with strict federal and state regulations, including Buy America requirements, Federal and State Prevailing Wage Rates, and a 13% Federal Small Business Enterprise (FSBE) goal. Required submissions include a bid guaranty of 5% of the total bid, wage law compliance certifications, and a proposal for incorporating recycled materials. Performance is subject to quality control standards overseen by the Engineer, and the contractor is required to provide payment and performance bonds in accordance with RCW 60.28.011 (b). Bids for this solicitation are due by November 18, 2026.
Highway, Street, and Bridge Construction

POSTED

about 20 hours ago

DEADLINE

in 20 days
View Details
NAICS: 238220
New
SLED
Charles Street Vehicle Maintenance HVAC Improvements
Solicitation # PW#2026-041
Solicitation PW#2026-041 is a lump sum contract issued by the City of Seattle's Department of Finance and Administrative Services for HVAC improvements at the vehicle maintenance facility located at 805 South Charles Street. The project focuses on upgrading the existing exhaust fan system and installing a new makeup air unit to improve the removal of noxious gases from the welding shop. The architect and engineer estimate for the work is 1,540,511.00 USD. Award will be granted to the apparent low bidder who meets mandatory responsibility criteria, with evaluation based on the sum of the base bid and any selected alternates. The contractor is required to provide payment and performance bonds for 100 percent of the contract amount and must adhere to strict quality control and safety standards, including UL certification and NEMA safety marking. Key submission requirements include an Inclusion Plan and a Bidder/Subcontractor List via the OpenGov portal. The project emphasizes social equity, requiring compliance with SMC 20.42 and the designation of an Equal Employment Opportunity Officer. Performance is subject to liquidated damages of 1,000.00 USD per working day for delays beyond the specified completion date. Weekly payroll reporting must be submitted through the designated online portal to ensure prevailing wage compliance.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 23 hours ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS