Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from North Carolina was posted on November 6, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Secondary Clarifier and RAS Pump Design & Construction Phase Services Neuse River Resource Recovery Facility

Closed
274-NRSCState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a solicitation issued by Garney Pacific, Inc. for the East Bay Municipal Utility District. The scope of work involves extensive infrastructure rehabilitation, including the repair of covered and open concrete structures, the relining or replacement of small and large diameter steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, and the replacement of motor control center components. The project also encompasses the modification of sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Key deliverables include lead abatement, metals fabrication, painting, coatings, and FRP reinforcing systems. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The contract involves providing design and construction phase services for a major upgrade at the Neuse River Resource Recovery Facility in Raleigh, North Carolina. Specifically, the scope includes constructing a new secondary clarifier with a 160-foot diameter to enhance the facility’s secondary treatment capacity, along with installing an additional Return Activated Sludge (RAS) pump at the existing RAS pump station serving clarifiers N1 and N2. The project aims to improve the reliability and efficiency of secondary clarification processes, ensuring compliance with effluent quality standards. The solicitation, issued as a Request for Qualifications (RFQ) by the City of Raleigh, seeks qualified engineering firms to submit proposals by December 12, 2025, with a mandatory pre-submittal conference scheduled for December 5, 2025. The anticipated contract value ranges from five to fifteen million dollars, emphasizing a focus on technical expertise, project approach, and firm experience, with no consideration of price during evaluation. The contractual framework incorporates detailed provisions on project management, compliance, and standards, including adherence to accessibility guidelines such as WCAG 2.1 AA and LEP requirements, as well as insurance and liability stipulations. The agreement emphasizes organizational conflict of interest mitigation through restrictions on subcontracting and mandates strict adherence to public records laws and confidentiality. It also specifies that proposals must follow a structured format, limited to ten pages excluding appendices and cover pages, and be submitted electronically via the North Carolina Vendor Portal by the specified deadline. While many contractual clauses and administrative details are outlined, the document appears to be a template with placeholders, and no specific pricing, legal entity identifiers, or completed certifications are provided at this stage. Overall, the project represents a significant infrastructure enhancement designed to ensure the continued environmental compliance and operational resilience of the wastewater treatment facility.

Documents

1
PDF, High priority: read this first23 pages · rfq
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 15 days
  • Lift Station No. 85 ReplacementOpen now, due in 26 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → City of Raleigh
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
RFQ: Raleigh Water is seeking design and construction phase services for one new 160-foot diameter secondary clarifier and one additional return activated sludge (RAS) pump in the existing RAS pump station currently serving clarifiers N1 and N2 at the Neuse River Resource Recovery Facility (NRRRF).

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS