Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on June 23, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Secondary Power C-61

Closed
FA2823-22-R-0011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for professional transformer oil testing services to enhance the reliability, safety, and maintainability of its assets. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections on energized transformers to identify thermal anomalies, installing standardized external oil sampling devices to improve technician safety, and performing comprehensive oil testing analysis. Additionally, the selected contractor must evaluate nitrogen preservation systems to ensure positive pressure is maintained and provide on-site training for up to 20 agency staff members on infrared camera usage and defect identification. All work must adhere to NETA MTS, IEEE, NFPA 70E, and ASTM D923 standards, with thermography performed by ASNT Level 1 certified technicians or equivalent. The agency intends to make a single award to the most capable and cost-effective offeror. Evaluation criteria include a proven track record of at least two similar projects within the last five years, personnel qualifications, the proposed staffing plan, and the ability to meet the project timeline. Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a detailed project approach, company profile, and required certifications such as a Non-Collusion Statement and Workers Compensation Certificate. Payment will be processed electronically via ACH within 30 days of invoice approval, with options for expedited payment in exchange for a discount. The contract is set aside for small businesses and various SBA-certified categories, and requires strict adherence to California Labor Code provisions for public works contractors.
Inland Empire Utilities Agency

POSTED

about 4 hours ago

DEADLINE

in 2 months
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves inspecting, testing, repairing, and certifying emergency lighting systems to ensure proper egress illumination in compliance with NFPA 101 (2024), NFPA 70, and OSHA standards. Key deliverables include a full inventory of fixtures, functional testing via simulated power outages, the application of durable tracking labels to each fixture, and the integration of recurring maintenance into the facility's Computerized Maintenance Management System. The estimated contract value ranges between $25,000 and $100,000. Bids are due by December 1, 2026, and must be submitted via email to Sandra Clore. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids of $25,000 or more, contractors must provide a bid bond equal to 20% of the base bid, as well as performance and payment bonds from a surety company with at least an A- rating. Award decisions will be based on overall best value. The contract is subject to strict federal labor and safety regulations, including the Davis-Bacon Act, Executive Order 14026 regarding minimum wages, and Executive Order 13706 for paid sick leave. Bidders must submit a detailed cost breakout on company letterhead and complete a supplier onboarding packet including a W-9 and self-certification of business size or socioeconomic status per FAR 52.219-8. First-tier subcontractors with awards exceeding $45,000 must also disclose any federal debarment or suspension status.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in about 1 month

General Info

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Place of Performance

Eglin AFB, FL, 32542, USA

Set-Aside

SBA

Documents

13

2022+Davis+Bacon+Wage+Building+Rate.txt

TXT

Attachment+3+Section+L_Instr+to+Off_FTFA+22-VH11.pdf

PDF

Attachment+L1-50DC+22-VH11.xls

XLS

Attachment+L2-FRQ.pdf

PDF

Attachment+L3++Past+Perf+Information+Sheets.pdf

PDF

Attachment+L4+Consent+Form.pdf

PDF

Attachment+L5-PPQ.pdf

PDF

Attachment+L6+Cover+Letter.pdf

PDF

main+base+to+c-61.pdf

PDF

R-0011+Questions+as+of+6-22-2022.pdf

PDF

Section+M_Final+22VH11.pdf

PDF

Solicitation+-+FA282322R0011.pdf

PDF

SOW+FTFA+22VH11.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA2823 Aftc Pzio
Contacts2 people available
OfficeEGLIN AFB, FL, 32542-5418, USA
Office AddressEGLIN AFB, FL, 32542-5418, USA

Full Description

Show more
At time of award, each business must be registered at SAM.gov with a UEI or Unique Entity ID and all Representations and Certifications completed The intent of project FTFA 22-VH11 Design/Build Secondary Comm Power C-61, Eglin AFB for this project, in accordance with the Statement of Work dated 18 January 2022. The anticipated Period of Performance is 238 days after notice to proceed GENERAL INTENTION: Route a 208/120V-3 phase-4 wire service from a recently installed 500 KVA pad-mounted transformer to a new outdoor mounted 1,200A panelboard. The above work shall also include the following requirements: (1) Provide a new combination KW-HR and KW-Demand meter on a new galvanized steel support structure that is independent of the existing 500 KVA pad-mounted transformer enclosure. The new combination KW-HR and KW-Demand meter shall include wireless transceiver hardware. The new meter and wireless transceiver hardware shall be compatible with current wireless system being utilized by Eglin AFB. Provide a new 13-point terminal meter can with voltage and current test switches. For information regarding the specifics of meter and wireless transceiver hardware to be utilized, including frequency Requirements, contact Mike Bass at Eglin AFB at the following telephone number: 850-882-4621. The new support structure shall consist of two 4" rigid steel conduits spaced as required, two unistrut member lengths as required, and one 3/4"-thick UHMW (ultra-high molecular weight polyethylene) sheet sized as required to support the new combination KW-HR and KW-Demand meter. Each conduit (referenced above) shall extend six feet above finished grade and four feet below finished grade. And each conduit shall be encased in concrete for its entire length below finished grade'the diameter of the poured concrete around each conduit shall be 10. (2) Provide new wiring and conduit (schedule 80 PVC, sized as required for the new wiring) routed 36 below the finished grade between the new meter and the existing transformer secondary compartment as required to provide a fully functional meter. (3) Provide three new 1,200/5 CTs on the transformer secondary, and coordinate with Chelco regarding access to the transformer secondary as needed. (4) Provide three new sets of 4 #600 MCM THWN copper conductors in three new 4 schedule 80 PVC conduits from the secondary compartment of the existing 500 KVA transformer to the new 1,200A panelboard. The distance between the existing transformer and the new 1,200A panelboard required by this contract is 200 feet. Route the new wiring and conduit referenced above at 36 below finished grade. And grass removed due to trenching shall be replaced with Argentine Bahia sod. (5) Provide a new 1,200A'120/208V'3 phase'4 wire panelboard that shall be rated for 65 KAIC, with a 1,200A main breaker, and include one new 600A-3 pole breaker and five new 225-3 pole breakers. This new 1,200A panelboard shall be NEMA 3R rated. And all new breakers in this paragraph shall be 65 KAIC rated. Also, a surge protective device shall be included with the 1,200A panelboard. (6) Provide a new 600A'3 phase'4 pole manual transfer switch that shall be NEMA 3R and 65 KAIC rated with input feeds located on the bottom end of the new 600A manual transfer switch and the output feed located at the top end of the new 600A manual transfer switch. The input feeds to the new manual transfer switch shall be as follows: (1) the commercial power input feed shall consist of two new sets of 4 #350 MCM THWN copper conductors in 3 galvanized rigid steel conduits originating from the new 600A feeder breaker in the new 1,200A panelboard, (2) for the emergency power input feed, reuse the existing outdoor rated cabling currently connected between the existing generator and the existing 600A disconnect (which is to be removed by this contract). Regarding the existing generator cables, provide one new 4 rigid steel conduit nipple (6 length) on the bottom side of the new 600A manual transfer switch for the existing generator cables (four) to pass through. Provide two new sets of 4 #350 MCM THWN copper conductors in 3 galvanized rigid steel conduits between the output side of the new 600A manual transfer switch and the existing 600A panelboard. (7) The new 1,200A panelboard, new 600A manual transfer switch, existing 600A panelboard, and an existing 6 x 6 x 24 wireway are to be mounted on a new outdoor support structure. The existing 600A disconnect switch is to be removed, which is currently on the existing outdoor support structure that is to be removed by this contract and replaced with the new 600A manual transfer switch. Also, remove the existing wiring and conduit between the existing 600A disconnect being remove and the existing 600A panelboard. Provide a new 600A-3 pole feeder breaker in the new 1,200A and route two sets of four 350 MCM THWN copper conductors in 3 rigid steel conduit from the new 600A-3 pole feeder breaker to the input side of the new 600A manual transfer switch. (8) The new support structure shall consist of three 4" rigid steel conduits spaced as required, eight eight-feet length unistrut members, and two new 3/4"-thick UHMW (ultra-high molecular weight polyethylene) sheets (3/4 x 96 x 96) to support the new and existing panelboards, new manual transfer switch, and existing wireway referenced above (two new 4 x 8 sheets of 3/4"-thick UHMW (ultra-high molecular weight polyethylene) on each side of the three new 4" rigid steel conduits). Each new conduit (referenced above) shall extend six feet above finished grade and four feet below finished grade. And each new conduit shall be encased in concrete for its entire length below finished grade'the diameter of the poured concrete around each new conduit shall be 10. (9) Regarding the existing 600A panelboard, existing 600A disconnect, and the existing 6 x 6 x 24 wireway'they are to be supported as required while removing the entire existing outdoor support structure that they are currently fastened to and installing the new outdoor support structure referenced above. The existing outdoor support structure that the above referenced existing items are fastened to consists of the following: two 4 x 4 x 10 wood poles (assume four feet of each pole is below finished grade) and two 4 x 8 sheets of plywood (one existing 4 x 8 sheet of plywood on each side of the two existing 4x4 wood poles). **************************************************************************************************************************************************** A Site Visit has been arranged for <<14 JUNE 2022>> at 0900 A.M. Central Time. Base access requests will need to be provided to the CS listed above identifying the company name and list of individuals who will attend. There is a limit of five (5) individuals per company who may attend.The email should include the following information: FULL LEGAL NAME AND DOB for each individual requesting access. Base access requests not providing at least 72-hour notice will not be honored. Contractors are required to follow all Base and Safer Federal Workplace Guidelines (if applicable) when visiting the base. Information on Safer Federal Workplace Guidelines can be found at: https://www.saferfederalworkforce.gov/faq/Contractors/. ************************************************************************************************************************************************** Questions and Answers Period: All questions regarding this solicitation must be submitted in writing. All questions and subsequent answers will be posted to the SAM.gov website. It is the responsibility of the Offeror to continuously monitor the site for updates. All questions shall be submitted electronically to the individual(s) listed above no later than 08:00 A.M. CENTRAL TIME <<17 JUNE 2022>>. Information provided as a result of these questions and answers shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply. ************************************************************************************************************************************************** 50 Division Cost Estimate (DCE) Worksheet (Attachment L1): Offerors shall provide a price breakdown for the project utilizing the 50 Division Cost Estimate (DCE) Worksheet (Attachment L1) for each CLIN as well as a summary page. Use and submit the 50 Division Cost Estimate (DCE) Worksheet (Attachment L1) to build your proposal. The Government has provided in Attachment L1 the anticipated division and cost elements per division for the project. Review the proposal divisions and the cost elements within each division and if division or any cost elements need to be added (do not remove pre-existing entries, place additions at the bottom of the column, as needed) the Contractor should provide explanation and direct reference to applicable requirement document(s). Offerors shall input the major work elements by specification division and provide pricing for those major work elements within each division sheet. The information from the division sheets may not be all inclusive. Offerors are allowed to include any missing items from each division and are allowed to fill in other divisions that are not listed in the prefilled division sheets. Offer will be complete, accurate, and sufficiently detailed to demonstrate a clear understanding of the requirement including providing sufficient details in the Division Cost Worksheet regarding quantities for material, labor, and other services. Offerors should not utilize lump sum or total pricing when pricing each specification division. Failure to breakout major work elements within a specification division may result in an unfavorable evaluation. If utilizing lump sum or total pricing when pricing the specific division, Offerors should provide rationale on why the price cannot be broken out. The burden of proof for credibility of proposed pricing rests with the Offeror. The Government anticipates the following divisions to be utilized: Div. 01 - General Requirements Div. 26 - Electrical June 21, 2022 - Questions from due date June 17, 2022 have been posted under attachments. Reminder RFP solicitations are due July 8, 2022. Please send a request for DoD SAFE Link no earlier than 5 days prior to submission. Requests are to be directed to david.clark.94@us.af.mil. June 22, 2022 - Clarification posted in respect to previous answer given on Question 1 with statement contained on Question 8. Previous Attachment labeled "R-0011 Questions as of 6-21-2022" was removed and an updated Attachment labeled "Questions as of 6-22-2022" was inserted.

More opportunities from Department Of Defense → FA2823 Aftc Pzio

Same awarding agency

NAICS: 334310
New
Federal
Conference Room Remodel
Solicitation # FA2823-26-Q-A113
Solicitation FA2823-26-Q-A113 is a firm-fixed-price request for quote issued by the Air Force Test Center for the modernization of the audiovisual system in Building 104, Room 101 at Eglin Air Force Base, Florida. This project is a total set-aside for small businesses under NAICS 334310. The scope of work includes the complete decommissioning of legacy equipment and the installation of a Trade Agreements Act compliant AV-over-IP distribution system, high-definition displays, digital audio processing, PTZ cameras, and an integrated conference table. The resulting system will be designated for unclassified use and must support hybrid collaboration and local presentations without connecting to the government network. The government will award the contract based on best value, evaluating technical capability, past performance, and price. Offerors must submit their proposals in three separate volumes—Technical Capability, Past Performance, and Price—contained within a single PDF. Key requirements include a delivery schedule of no later than 120 days after receipt of order and the provision of an on-site commercial dumpster for waste disposal. All equipment must be TAA-compliant, and high-value items costing $5,000 or more require unique item identification per MIL-STD-130. The current proposal submission deadline is October 21, 2026, at 1:00 PM EDT.
Audio and Video Equipment Manufacturing

POSTED

about 22 hours ago

DEADLINE

in 6 days
View Details
NAICS: 811121
Federal
FIRE APPARATUS INTERCOM SYSTEM UPLIFT AND INSTALLATION
Solicitation # FA282326Q0065
The Air Force Test Center, Operational Contracting Division at Eglin Air Force Base, Florida, is soliciting quotations for RFQ FA282326Q0065 to procure and install new 4-position onboard intercom systems for twelve fire apparatuses, including ten fire engines, one ladder truck, and one rescue vehicle. This firm-fixed-price contract requires the removal of legacy components and the installation of systems integrated with Motorola APX 6500 mobile radios, featuring wireless driver headsets with a minimum connectivity range of 500 feet. All work must be performed on-site at Fire Station 1 and comply with NFPA 1901 automotive and emergency vehicle wiring standards. The period of performance is 90 calendar days after award, with delivery terms set as FOB Destination. This acquisition is a 100 percent Small Business set-aside under NAICS code 811121, with a size standard of 9 million dollars. Award will be based on the Lowest-Priced Technically Acceptable (LPTA) solution, evaluating quotes on a strict acceptable or unacceptable basis regarding the Statement of Work. Offerors must be registered in SAM and provide firm-fixed pricing, business size status, and required representations and certifications by September 4, 2026. The contract incorporates various FAR and DFARS clauses, including strict requirements for safeguarding covered defense information, cybersecurity reporting, and prohibitions on certain foreign telecommunications equipment. Funding is contingent upon the availability of appropriated funds beyond October 1, 2026.
Automotive Body, Paint, and Interior Repair and Maintenance

POSTED

about 2 months ago

DEADLINE

in 11 months
View Details
NAICS: 541370
Federal
Fiber Cable Locate and Mapping ServicesThe contract encompasses specialized underground fiber cable locating and mapping services using ground penetrating radar technology to ensure precise identification of subsurface utilities prior to any excavation activities. Compliance with the 811 One-Call system is mandatory, requiring coordination with national utility notification protocols to prevent damage to buried infrastructure and maintain safety standards during construction or development operations. The work is classified under NAICS code 541370, indicating scientific and technical consulting services, and is structured as a subcontract within the Department of Defense’s procurement framework under the FA2823 AFTC PZIO office. Performance of the services is required at a location with a ZIP code of 32542, which is associated with Eglin Air Force Base in Florida, indicating the scope is tied to Defense Department infrastructure projects. The contract was posted on July 10, 2026, and while no solicitation number or set-aside details are provided, the emphasis on technical accuracy and regulatory compliance underscores the critical nature of the work in supporting secure and uninterrupted military communications networks. All activities must adhere to strict protocols for subsurface utility detection to mitigate risks of service disruption, environmental harm, or personnel injury.
Surveying and Mapping (except Geophysical) Services

POSTED

3 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS