Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from California was posted on January 19, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Security System Commissioning and Acceptance Testing

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Western Placerville Interchanges Phase 2.3 - Design & Env RFP Final Complete
Solicitation # 20261113026
The City of Placerville is soliciting proposals from qualified engineering firms for the Western Placerville Interchanges Phase 2.3 Project, specifically focusing on the US 50 Westbound Off-Ramp at Ray Lawyer Drive. The scope of work encompasses the full project lifecycle, from Project Approval and Environmental Document (PA&ED) through Plans, Specifications, and Estimate (PS&E), Right-of-Way Certification, bid support, and design support during construction. Key objectives include constructing a new westbound off-ramp, improving the intersection at Ray Lawyer Drive, and enhancing bicycle and pedestrian facilities. The project is located on the State Highway System, funded by State Transportation Improvement Program (STIP) funds, and will be delivered by the City under Caltrans oversight. The selected consultant must adhere to rigorous Caltrans and City of Placerville standards, including CEQA and NEPA environmental revalidation and the Caltrans Workplan Standards Guide WBS. Payment will be structured as actual cost plus a fixed fee, with progress payments made monthly. To avoid organizational conflicts of interest, the selected firm and its subconsultants are prohibited from providing construction management services. Proposals must be submitted by December 7, 2026, consisting of a technical proposal and a separate sealed cost proposal. Award decisions will be based on a 50/50 weighted split between the written proposal score and an interview score for short-listed firms.
City of Placerville

POSTED

about 2 hours ago

DEADLINE

in 20 days
NAICS: 541330
New
SLED
RFP27-016 Countywide Bicycle & Pedestrian Master Trails Plan
Solicitation # RFP27-016
The Board of Commissioners of Glynn County, Georgia, is soliciting proposals for a Countywide Bicycle and Pedestrian Master Trails Plan covering the Brunswick Area Transportation Study Metropolitan Planning Area, including St. Simons Island and unincorporated Glynn County. The project involves professional planning, analysis, and public engagement to identify network gaps and develop concept-level recommendations for 10 to 20 priority projects. Key deliverables include a scored ranked segment database, a prioritized network gap inventory, a Priority Projects Technical Memorandum with planning-level cost estimates, and a Policy Audit Matrix. All work must comply with FHWA regulations, 2 CFR Part 200, and environmental standards including the Clean Air Act and Clean Water Act. Proposals are evaluated based on practical merit and price, with a technical ranking performed before fee negotiations. The highest-ranked proposer will negotiate the final scope and fee, which is compared against the County's independent cost estimate. Applicants must provide GDOT prequalification documentation, a SAM.gov unique entity ID, and certifications regarding EEO practices and anti-lobbying. Technical requirements include strict GIS data standards using NAD 1983 State Plane Georgia East and the delivery of Esri file geodatabase feature classes. Proposals must be submitted via the County's eProcurement Portal by December 17, 2026.
Glynn County Board of Commissioners

POSTED

about 3 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This subcontract opportunity with the California Department of Transportation involves the comprehensive commissioning and acceptance testing of a security system. The selected provider will be responsible for conducting full system commissioning, which includes functional testing, the calibration of motion detection, alert verification, and final acceptance testing to ensure all components meet strict Caltrans requirements. The project is categorized under NAICS code 541330. Interested parties should note that the solicitation was posted on January 19, 2024, with a response deadline of February 1, 2024. Further details regarding the event can be accessed through the Cal eProcure portal.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

This scope was carved out of 02A2189.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Surveillance Camera Installation

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • DBE Subconsultant Opportunity - Qualifications for E Wells PFAS Groundwater Treatment ImprovementsOpen now, due in 15 days
  • Western Placerville Interchanges Phase 2.3 - Design & Env RFP Final CompleteOpen now, due in 21 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Conduct full system commissioning, including functional testing, motion detection calibration, alert verification, and final acceptance testing per Caltrans requirements.

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 236220
New
SLED
Building Construction In Sonoma County In And Near Santa Rosa At 224 Lincoln Street And 3251 Brickway Boulevard
Solicitation # 04-2Q5804
The California Department of Transportation has issued solicitation 04-2Q5804 for building construction projects located at 224 Lincoln Street and 3251 Brickway Boulevard in Santa Rosa, California. The primary scope of work involves the removal of existing electrical service and distribution systems at the Santa Rosa Maintenance Station and the installation of complete, operational electrical systems. Key deliverables include the provision of temporary construction power, heat, and lighting, as well as the execution of testing and commissioning. The contractor is required to maintain as-built drawings and provide comprehensive product data and shop drawings. Technical requirements mandate strict adherence to NFPA 70, ANSI, and IEEE standards, with specific packaging and marking protocols for electrical devices and wood structural panels. Quality assurance involves the use of qualified testing agencies and factory-authorized representatives, with mandatory infrared scanning of switches and circuit breakers after substantial completion. The project also requires compliance with 2008 ADA Standards for Accessibility, Buy America requirements for steel and iron, and specific cybersecurity hardening guides for the system. Administrative requirements include a unit price bid submission with a security deposit of at least 10 percent. Bidders must provide certifications for Small Business Enterprise (SBE) and Disabled Veteran Business Enterprise (DVBE) participation, with specific deadlines for commitment and confirmation. The contract emphasizes labor compliance through prevailing wage rates as determined by the California Department of Industrial Relations. Performance milestones include the energization of the Battery Energy Storage System within two weeks of delivery to the site.
Commercial and Institutional Building Construction

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Napa County Near Calistoga At No Name Creek Bridge
Solicitation # 04-2J88U4
The California Department of Transportation has issued solicitation 04-2J88U4 for construction work on the State Highway in Napa County near Calistoga at the No Name Creek Bridge. With an estimated project cost of 880,000 USD, the scope of work focuses on bridge scour repair, including the use of shotcrete for scour holes and partially grouted rock slope protection. Additional requirements include the installation of a Midwest Guardrail System, culvert cleaning, structure excavation, and extensive landscaping and erosion control involving hydroseeding, fiber rolls, and soil amendment. The project also necessitates the removal of existing guardrails and thermoplastic traffic stripes, which are handled as hazardous waste. Performance is subject to strict environmental and regulatory constraints, including a restricted work window within creek channels from June 15 to October 15. Contractors must comply with prevailing wage laws and meet a 5 percent goal for both Small Business Enterprise (SBE) and Disabled Veteran Business Enterprise (DVBE) participation. Technical standards require that temporary concrete barriers be fabricated at authorized facilities and that local materials meet specific pH and lead concentration limits. Administrative requirements include the submission of a baseline schedule, weekly working days reports, and electronic payroll records via LCPtracker Pro. Bids are due by December 15, 2026, and must be submitted on a unit price basis.
Highway, Street, and Bridge Construction

POSTED

about 3 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Lake County Near Lower Lake On Route 29 From Coyote Creek Bridge To Diener Drive/Road 543 And On Route 53 At Route 29
Solicitation # 01-0J9304
Solicitation 01-0J9304 is a construction project issued by the California Department of Transportation for state highway improvements in Lake County. The scope of work focuses on Route 29, from Coyote Creek Bridge to Diener Drive/Road 543, and Route 53 at Route 29. Key activities include cold planing of AC pavement, installation of Rubberized Hot Mix Asphalt Gap Graded overlay, and Hot Mix Asphalt Type A surfacing. The project also involves bridge work at Coyote Creek Bridge, drainage improvements, utility plans, and the installation of sinusoidal rumble strips and traffic stripe tape. The estimated cost for the project is 14.4 million dollars. Bids must be submitted via the Bid Express website by January 6, 2027, and must include bidder security of at least 10 percent of the bid. Proposed project durations must fall between 100 and 140 working days. The contract is governed by the 2025 Standard Specifications and includes strict requirements for Buy America/Build America compliance and environmental product declarations for concrete and asphalt. Contractors must adhere to rigorous environmental standards, including specific pressure washing protocols for equipment to prevent the spread of invasive species and compliance with the RWQCB basin plan. Performance must begin within 55 days of contract approval by the Attorney General, with a notice of start required 72 hours prior to activity. The project mandates the use of prevailing wages and requires a certified safety representative with specific Cal/OSHA or OSHA training and professional certifications. Quality control personnel must hold ACI Concrete Field-Testing Technician Grade 1 certification. Temporary concrete barriers must be fabricated at authorized facilities and meet MASH Test Level 3 safety standards.
Highway, Street, and Bridge Construction

POSTED

about 16 hours ago

DEADLINE

in about 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS