Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Virginia was posted on July 24, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Segmental Retaining Wall (SRW) Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238140
New
Asphalt Roads Replacement
Solicitation # WL – 26 - 011
The Woodland Job Corps Center is soliciting proposals for the repair and renewal of five parking lot areas in Laurel, Maryland, including the center front gate, administration, wellness, education, and Willow building parking areas. The scope of work requires the contractor to provide all labor, materials, and equipment to resurface the top layer of these areas by one to two inches and replace all lot markings. This project is a small business set-aside and is open to various certified categories, including VOSB, SDVOSB, WOSB, and HUBZone small businesses. Bidders must attend a mandatory site visit on November 16, 2026, and submit their proposals by November 20, 2026. Award will be based on best value rather than lowest price, with evaluation criteria weighted across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Proposals must be submitted as a single lump sum with a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee. The selected contractor must hold a valid Maryland Contractor's License and comply with EPA, OSHA, and Davis-Bacon Act wage determinations. Performance must begin within 14 days of the Notice to Proceed, and the contractor is required to provide a one-year guarantee on workmanship. Payment terms are Net 30, and final payment is contingent upon the submission of certified payroll records, release of liens, and a completed SF 1413.
Woodland Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 3 days
NAICS: 238140
New
Asphalt Roads Replacement
Solicitation # WL – 26 - 011
The Woodland Job Corps Center is soliciting proposals for the repair and renewal of five parking lot areas in Laurel, Maryland, including the center front gate, administration, wellness, education, and Willow building parking areas. The project requires the contractor to provide all labor, materials, and equipment to resurface the top layer of asphalt by 1 to 2 inches and replace lot markings to ensure a safe and durable surface. This is a small business set-aside solicitation under NAICS codes 238140 and 238990. Proposals must be submitted as a single lump sum contract with a detailed cost breakdown, a timeline for substantial completion, and a minimum 90-day bid guarantee. A mandatory bid conference is scheduled for November 16, 2026, with a final response deadline of November 20, 2026. Award will be based on best value rather than lowest price, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). The selected contractor must comply with the Davis-Bacon Act (WD # MD20260082), EPA and OSHA regulations, and provide a one-year workmanship guarantee. Required documentation for submission includes a valid Maryland Contractor's License, insurance certificates meeting specific liability limits, a W9, and a completed vendor questionnaire. Once a Notice to Proceed is issued, the contractor must submit a sequenced construction schedule within 10 days and commence work within 14 days. Payment terms are Net 30.
Woodland Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 3 days
NAICS: 238140
New
International
Maplelawn Garden Wall Rehabilitation
Solicitation # NCC-DC-039015-RFP
The National Capital Commission is seeking a qualified proponent for the rehabilitation and reconstruction of 285 meters of historic native limestone masonry walls at the Maplelawn Garden Estate, located at 529 Richmond Road in Ottawa. The project aims to restore the structural and aesthetic integrity of six wall sections while preserving their heritage characteristics and eliminating public safety risks. The scope of work includes dismantling existing masonry, salvaging and reinstating stone units, installing new concrete footings, and constructing reinforced concrete retaining walls specifically for the east and south sections. Performance is scheduled to begin upon contract award, with demolition and excavation in spring 2027, foundations in summer 2027, and masonry reconstruction concluding in fall 2027. The contract will be awarded based on a combined score of a technical proposal (60 percent) and a financial proposal (40 percent), with a minimum technical threshold of 36 points required to proceed. Key requirements include the provision of a Lead Project Manager or Site Superintendent and the retention of a Qualified Person for soil management. The contractor must maintain professional liability and errors and omissions insurance of at least 2 million dollars. Payments are set at NET 30 days, and the project includes a twelve-month warranty period following a satisfactory final inspection by the NCC. Proponents must adhere to strict ethical procurement standards, including certifications against child and forced labor.
National Capital Commission

POSTED

1 day ago

DEADLINE

in 2 days

AI Contract Overview

Show more

This subcontract opportunity with the Virginia Department of Energy involves the design, supply, and installation of a segmental retaining wall. The scope of work is comprehensive, requiring the contractor to handle precast concrete unit installation along with essential site preparation tasks, including excavation, footer preparation, geogrid installation, and final grading. The project is categorized under NAICS code 238140. Interested parties must submit their responses by the deadline of August 5, 2025, following the posting date of July 24, 2025. Detailed solicitation information and submission guidelines are available through the provided vendor portal.

General Info

Virginia Department of Energy subcontract for segmental retaining wall installation by August 5, 2025.

Place of Performance

VA, USA

Set-Aside

NONE

Documents

This scope was carved out of A409DMME:98183.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Dismal Road Landslide

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Asphalt Roads ReplacementOpen now, due in 3 days
  • Asphalt Roads ReplacementOpen now, due in 3 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVirginia Department of Energy
ContactsNo contacts available
OfficeN/A
Organization / AgencyVirginia Department of Energy
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Design, supply, and installation of a segmental retaining wall using precast concrete units including excavation, footer preparation, geogrid installation, and final grading.

More opportunities from Virginia Department of Energy

Same awarding agency

NAICS: 237130
New
SLED
Solar Interconnection Grant
Solicitation # RFA-131767
The Solar Interconnection Grant Program, administered by the Virginia Department of Energy, provides funding to public bodies to offset the costs of connecting distributed solar energy systems to the electric grid. Established via Senate Bill 659 and House Bill 683, the program targets barriers to public-sector solar development by funding infrastructure upgrades, including transformers, relays, SCADA/telemetry, protection equipment, metering modifications, and necessary engineering services. Eligible projects may be behind-the-meter or front-of-the-meter and must be located at previously developed project sites. The anticipated period of performance ranges from 6 to 18 months. Applications must be submitted through the Virginia Energy Grant Portal by January 15, 2027. Awards are competitive and based on a 100-point scoring system that evaluates organizational summaries, project scope, readiness, interconnection details, and community benefits. Applicants must adhere to strict word counts and submit a master PDF and two Excel files. Grant recipients must comply with Virginia procurement laws and prevailing wage requirements mirroring federal Davis-Bacon standards. Administration requires monthly invoicing by the 15th of each month, quarterly progress reports, and final verification via equipment lists and photos. Payments are issued upon agency acceptance of work, with a potential 5% retainage for construction projects and a final audit before closing.
Power and Communication Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in about 2 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS