Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Texas was posted on February 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Seismic and Structural Systems Compliance Verification

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Seismic and Structural Systems Compliance Verification subcontract involves specialized inspection and documentation of seismic force-resisting systems. The scope of work focuses on ensuring compliance with AISC 341 and AWS D1.1 standards for braced frames, moment frames, and shear walls. Managed by the Engineering agency in Texas, this opportunity is categorized under NAICS code 541330. The solicitation was posted on February 9, 2026, with a response deadline of February 26, 2026. There is no specified set-aside status for this contract.

General Info

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 2026-01A.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Structural and Special Inspections for Fire Station No. 8 Construction

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Cost Data Collection Support Services for the Office of Cost Estimating and Program Evaluation (CEPE) (NA-1.3).Open now
  • The combat modeling and simulation tools will include all licenses, on-site software maintenance, training, on-site support, creation and maintenance of site models (facility, defense, and attack sce…Open now
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Engineering
ContactsNo contacts available
OfficeN/A
Organization / AgencyTexas → Engineering
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Specialized inspection and documentation of seismic force-resisting systems including braced frames, moment frames, and shear walls per AISC 341 and AWS D1.1.

More opportunities from Texas → Engineering

Same awarding agency

NAICS: 238320
SLED
CWA2603 Water Well Rehabilitation: Willow Bank and Eldridge Road
Solicitation # 2027-ITB-005
The City of Sugar Land has issued solicitation 2027-ITB-005 for the rehabilitation of water wells at the Willow Bank and Eldridge Road sites, identified as CIP Project No. CWA2603. The scope of work includes replacing downhole equipment, performing electrical work, and providing surface preparation and protective coatings for metallic, concrete, masonry, and plastic surfaces, including storage tanks. Key deliverables include a base bid for docking stations and manual transfer switches, with an alternate bid for a generator at the Willow Bank site. The project requires strict adherence to electrical labeling standards, including ANSI A13.1 and NFPA 70, and specific coating quality standards such as SSPC-PA2 and ASTM D4417-84. The contract will be awarded to the lowest responsive and responsible bidder based on factors such as technical expertise, financial stability, and past performance. Bids are due by December 3, 2026. Required submission materials include a bid bond, financial statements, a conflict of interest questionnaire, and certification regarding debarment. The successful contractor must provide performance and payment bonds, maintain minimum insurance coverages, and ensure all labor is paid according to minimum prevailing wage rates. There is no set-aside status for this solicitation.
Painting and Wall Covering Contractors

POSTED

11 days ago

DEADLINE

in 11 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS