Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Iowa was posted on October 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Selective Demolition & Surface Restoration

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This subcontract for Selective Demolition and Surface Restoration involves providing specialized services for prime contractors on City of Des Moines skywalk projects. The scope of work includes the removal of ceiling and wall-mounted signage along with all associated supports and attachments. Additionally, the contractor is responsible for surface restoration, which entails replacing gypsum board and ceiling tiles, patching wall finishes, and abandoning electrical wiring within junction boxes to deliver fully cleared and restored installation sites. All activities must be performed in strict compliance with ANSI A10.6 and NFPA 70 standards. The opportunity is categorized under NAICS code 238910 and was posted on October 6, 2026, with a response deadline of October 27, 2026.

General Info

Subcontract for signage removal and surface restoration for Des Moines skywalk projects.

Place of Performance

IA, USA

Set-Aside

NONE

Documents

This scope was carved out of 04-2026-017.

The full solicitation package (8 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

042026017

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Demolition and Disposal ServicesOpen now, due in 22 days
  • Excavation and Site RestorationOpen now, due in 21 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCity of Des Moines - Iowa
ContactsNo contacts available
OfficeN/A
Organization / AgencyCity of Des Moines - Iowa
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs removal of existing signage and surface restoration for prime contractors on City of Des Moines skywalk projects. Removes ceiling and wall-mounted signage, supports, and attachments; replaces ceiling tiles and gypsum board; patches and restores wall finishes; and abandons electrical wiring in junction boxes. Work must comply with ANSI A10.6 and NFPA 70. Delivers cleared installation sites with restored finishes.

More opportunities from City of Des Moines - Iowa

Same awarding agency

NAICS: 237110
New
SLED
072027001
Solicitation # 07-2027-001
The WRA Joint Trunk – Phase 14, Segment 3 project, managed by the Des Moines Metropolitan Wastewater Reclamation Authority, involves the construction of sanitary sewer infrastructure along Walnut Creek in Clive, West Des Moines, and Windsor Heights, Iowa. The scope of work includes the installation of approximately 16,652 feet of open-cut sanitary sewer (60-inch and 66-inch) and 3,000 feet of trenchless construction, along with manholes, special structures, bypass pumping, dewatering, and the replacement of storm sewers and water mains. Additional requirements include Hot Mix Asphalt and Portland Cement Concrete replacement, temporary traffic control, erosion control, and the installation of flow metering equipment with new electrical service. The engineer's construction estimate for the project is $40,372,230.00. The project is subject to strict compliance standards, including the Davis-Bacon Act for prevailing wage rates, American Iron and Steel requirements, and the City of Des Moines' Contract Compliance Program regarding Equal Employment Opportunity and Disadvantaged Business Enterprise (DBE) participation. Bids must be submitted electronically via Bid Express by December 1, 2026, and require a 10% bid bond. Substantial completion is mandated by October 1, 2029, with final completion by May 18, 2030. The contract specifies liquidated damages for missing key milestones, including trail closures and specific meter installations. There is no set-aside status specified for this solicitation.
Water and Sewer Line and Related Structures Construction

POSTED

5 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS