Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

SELECTOR,RECEIVER S

Active
N0038326QHA90Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This solicitation from Navsup Weapon Systems Support is for the repair and overhaul of the Selector, Receiver S (NSN 5895 017091452), to be performed by Sierra Nevada Corporation in Dayton, Ohio. The contractor is responsible for providing all labor, materials, and testing equipment necessary to return the assets to a Ready For Issue condition in accordance with specific drawings and technical publications. The contract includes strict requirements for Repair Turnaround Time (RTAT), with a defined induction expiration date of 365 days after the award. Key operational provisions include protocols for Beyond Economical Repair (BER) determinations, Missing on Induction (MOI) assets, and Over and Above Repair (OAR) efforts, all of which require written concurrence from DCMA and the Procuring Contracting Officer. The contractor must maintain a quality management system compliant with ISO 9001/SAE AS9100 and a calibration system meeting ANSI/NCSL Z540.3 or ISO-10012-1 standards. All parts used must be new per FAR 52.211-5, and any cannibalization of units requires specific government approval.

General Info

Sierra Nevada Corporation will repair and overhaul Selector Receivers for Navsup Weapon Systems.

Agency

Department Of Defense → Navsup Weapon Systems SupportView Agency

NAICS

334290 - Other Communications Equipment ManufacturingView NAICS

Place of Performance

PA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navsup Weapon Systems Support
Contacts1 person available
OfficePHILADELPHIA, PA, 19111-5098, USA
Organization / Agency
Department Of Defense → Navsup Weapon Systems Support
View Agency Profile
Office AddressPHILADELPHIA, PA, 19111-5098, USA

Full Description

Show more
CONTACT INFORMATION|4|N722.30|B5F|albert.j.russo17.civ@us.navy.mil| 771-229-0549| ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|x|||||||| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report (Combo) Type||DFAS|N00383|DCMA|DCMA|See Schedule|Source||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|12 months|60 Days Upon Notice of Defect|||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (DEV 2026-O0040)(FEB 2026)|4||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATIONS ON PASS-THROUGH CHARGES (DEV 2026-O0048)(MAR 2026)|1|| SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7|||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13|||||||||||||| ROYALTY INFORMATION (APR 1984)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||x| This requirement is for the repair of the items herein thissolicitation. Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor?s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Required RTAT: ## ____ days after receipt of asset. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation:A reconciliation modification will be issued after final Inspection and acceptance of all assets inducted under the subsequent contract. The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractormeeting the RTAT requirements described within the schedule page. If the Contractor does not meet the applicable RTAT requirement, consideration will be assessed and subject to negotiation. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS, DELIVERY ORDERS AND MODIFICATIONS)RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE"CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. \ 1. SCOPE 1.1 . Markings shall be in accordance with MIL-STD-130. 1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;SIERRA NEVADA CORPORATION; drawing number ( ;02NU1; ) ; 02697600-100-001; , Revision ;latest; and all details and specifications referenced therein. 1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS 3.1 1.0 GENERAL 3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition. 3.2 2.0 DEFINITIONS. 3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order. 3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled). 3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired). 3.3 3.0 SCOPE 3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items. 3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition: SELECTOR,RECEIVER S ; 02697600-100-001; P/N, ;5895 017091452; NSN, ;Available repair manuals, drawings and specifications per p/n requirements; Tech Publications 3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s). 3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change. 3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility. 3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency" 3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test. 3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements. 3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract. 3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA). 3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either: 3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options: Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK. 3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed. 3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements. 3.5 4.0 PARTS AND MATERIALS 3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO. Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO. 3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility. 3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract. 3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings. 3.5.5 ^^^NOTE^^^PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE. 3.5.6 3.6 SOURCE AND LOCATION OF REPAIR SOURCE: 3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed. SELECTOR,RECEIVER S ;SIERRA NEVADA CORPORATION; Company Name , ;2611 COMMONS BLVD,DAYTON, OH, 45421-3704; Address , ;02NU1; Cage Code inspection will be accomplished on the contractor's equipment 3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS: 3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality. 3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government. 3.8 6.0 CONFIGURATION MANAGEMENT (CM): 3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract). 3.9 7.0 MARKINGS. 3.9.1 Marking shall be as indicated in the contract when applicable. 3.10 8.0 STORAGE; 3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored. 4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE

Similar Contracts

Same NAICS industry code

NAICS: 334290
New
DIBBS
PLATE, MOUNTING
Solicitation # SPE4A6-26-T-14RN
The contract concerns the procurement of a single mounting plate identified by NSN 5895017012637 and part number 12272-3317-01 from L3HARRIS GLOBAL COMMUNICATIONS, INC., with a unit price of $1.00 and a total contract value of $1.00. Delivery is mandated within five days after award, with FOB origin terms, and must be shipped by the fastest traceable means excluding parcel post to an address in Vancouver, WA. The item is subject to stringent packaging and marking requirements per MIL-STD-2073-1E and MIL-STD-129, including standardized barcoding, unit container specifications, intermediate container codes, and a pack code of U. Preservation methods require cleaning and drying with no preservation or cushioning materials applied. Palletization must conform to DLA’s RP001 packaging requirements, and physical item marking must follow RQ017 standards. Inspection and acceptance occur at the destination, with sampling governed by MIL-STD-1916 or ASQ H1331 Table 1, enforcing zero non-conformances for acceptance unless otherwise specified, and assigning verification levels of VII, IV, and II to critical, major, and minor attributes. Technical and quality compliance is enforced through referenced DLA Master List requirements including RA001, RC001, RQ011, and RQ017. The contract incorporates a comprehensive suite of FAR and DFARS clauses, including those addressing equal opportunity, trafficking in persons, employment eligibility, sustainable products, hazardous material identification, cybersecurity safeguards, subcontracting, inspection of supplies, and prohibitions on certain foreign-sourced defense equipment and chemicals. Payment must be processed through Wide Area WorkFlow, and all offerors must provide a UEI and CAGE code. The solicitation is subject to automated award under a likely Lowest Price Technically Acceptable methodology, with no options, modifications, or pricing alternatives present. All proposals must be submitted electronically via DIBBS by the deadline of August 17, 2026, and the contract references overarching compliance with the DLA Master Solicitation Revision 105.
ASC COMMODITIES DIVISION

POSTED

1 day ago

DEADLINE

in 5 days
View Details
NAICS: 334290
New
DIBBS
PANEL, CONTROL, ELECT
Solicitation # SPE4A7-26-R-0777
DLA Aviation is conducting market research through a Sources Sought notice for the new manufacture of an electrical control panel, identified by NSN 5895-01-584-9094 and part number 160305-1. The procurement is intended to result in an unrestricted Indefinite Quantity Contract with a five-year base period. The scope of work includes the procurement of component parts, manufacturing, inspection, testing, preservation, packaging, and shipping. The estimated annual demand is 10 units, with delivery orders ranging from a minimum of 5 to a maximum of 10 units. This is a critical application item, and the contract will be subject to the Supplier Performance Risk System, where price, past performance, and delivery will be equally weighted in the award decision. Interested parties must be registered in the System for Award Management (SAM) to participate. While the current notice is for market research purposes to determine the procurement method, the anticipated solicitation will require written quotes and may necessitate certified cost and pricing data. The delivery schedule is set at 115 days after receipt of order (DARO) with FOB Origin and destination inspection/acceptance. Potential suppliers are requested to submit capability statements and organizational details via email to Montana Kipp by August 18, 2026. The final solicitation is expected to be issued around September 3, 2026, with a closing date of October 5, 2026.
ASC SUPPLIER OPER AE AND AF DIV

POSTED

1 day ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Defense → Navsup Weapon Systems Support

Same awarding agency

NAICS: 335931
New
Federal
59--WIRING HARNESS
Solicitation # N0038326RNA52
The item identified by NSN 1R-5995-016915333-V2 is a wiring harness requiring procurement of exactly 50 units under FOB origin terms, and it is designated as a sole-source acquisition due to its flight-critical nature and lack of usable technical data or Government data rights to support alternative sources or competitive bidding. Only previously approved sources, as defined by DoD-STD-100 criteria, are eligible to respond, and new vendors must submit full source approval documentation per NAVSUP WSS guidelines, including detailed evidence of experience with similar items or proof of pending approval. The Government has determined that no adequate technical data package exists to permit qualification testing of substitute parts, and delays for new source approval would prevent meeting operational timelines, necessitating sole-source treatment. Offers lacking complete source approval information or documentation of prior submission will be rejected outright, though awards may proceed based on Fleet support needs if approvals are not finalized in time. The acquisition is not conducted under FAR Part 12 commercial item policies, however interested parties may propose commercial alternatives within 15 days of notice if they can satisfy the requirement. The acquisition is subject to the Buy American Act, Free Trade Agreements, and the World Trade Organization Government Procurement Agreement, with compliance tied to applicable DFARS clauses. All proposals must ensure that the offeror, product, or manufacturer meets all qualification standards at time of award per FAR 52.209-1, and inquiries should be directed to the primary point of contact listed at NAVSUP WSS in Philadelphia. Technical specifications and related standards can be obtained via ASSIST-Online or DODSSP, though drawings, patterns, and deviation lists are not available through these channels.
Current-Carrying Wiring Device Manufacturing

POSTED

about 7 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 336413
New
Federal
16--ACTUATOR,ELECTROMEC, IN REPAIR/MODIFICATION OF
Solicitation # N0038325QT556
This contract pertains to the repair and modification of electromechanical actuators under solicitation N0038325QT556, managed by the Naval Supply Systems Command Weapon Systems Support. The contract mandates that all repairs be conducted in strict compliance with technical drawings, specifications, and industry standards, with a requirement for 100% repair rate on all contract line items. Contractors must ensure repairs are performed within a defined Repair Turnaround Time of 49 calendar days from physical receipt of the asset at their facility, as recorded in the Commercial Asset Visibility system, and must maintain a monthly throughput capacity to be specified by the contractor. All work must be completed at the designated facility in Ridgely Park, Pennsylvania, and no repairs may proceed beyond approved procedures without prior written authorization from the Procuring Contracting Officer. The contractor is fully responsible for procuring parts, tooling, test equipment, and quality systems, with no Government-provided materiel except as explicitly stated. The contractor is required to maintain a quality management system compliant with ISO 9001/SAE AS9100, and must implement rigorous controls for purchasing, receiving inspection, nonconforming material, and corrective actions. All repairs must be documented through detailed records, including inspection reports, repair travelers, and test data, which must be retained for Government review. The use of MIL-W-81381 wire is prohibited in favor of SAE-AS22759, and any deviation from approved drawings, specifications, or repair procedures must be formally submitted for Government approval. Beyond Economical Repair, Missing on Induction, and Over and Above Repair scenarios require prior written concurrence from the Defense Contract Management Agency and the Procuring Contracting Officer before work may proceed. The contract also enforces strict configuration management, marking, and packaging standards, and all deliverables must meet Ready for Issue conditions. The solicitation deadline has been extended to July 24, 2026, and the Induction Expiration Date is set at 365 days from contract award, after which incoming assets require bilateral agreement for repair authorization.
Other Aircraft Parts and Auxiliary Equipment Manufacturing

POSTED

about 7 hours ago

DEADLINE

in 11 days
View Details