Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Oklahoma was posted on May 28, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sensor Replacement

Closed
EV00000478State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
ON-CALL STRUCTURAL ENGINEERING SERVICES
Solicitation # 26/27-15
The Town of Manchester, Connecticut, is soliciting proposals under solicitation number 26/27-15 for a qualified structural engineering firm to provide on-call services on an as-needed basis. The scope of work involves the review, analysis, inspection, and design of municipal infrastructure. To be eligible, the consultant must be a professional engineer licensed in the State of Connecticut. Proposals are due by October 29, 2026, and must be submitted electronically via the Town's procurement portal. The selection process is based on a points-based scoring method evaluating qualifications, relevant experience, key personnel, and hourly pricing, though the award is not based solely on cost. The Town reserves the right to shortlist candidates for interviews and negotiate with the selected vendor prior to the final award. Contractors must adhere to strict insurance requirements, including General Liability, Professional Liability, Cyber Risk, and Environmental Liability, each with minimums of 1,000,000 dollars. Additionally, the contract is subject to the Town of Manchester Living Wage Ordinance for values exceeding 25,000 dollars per fiscal year, requiring specific hourly wage rates for eligible employees and the submission of a Living Wage Certification. Required submission documents include a PDF proposal, a current IRS Form W-9, a SAM number, and a disclosure of any municipal litigation or arbitration from the past ten years. All services must comply with the laws of the Federal Government and the State of Connecticut.
Engineering

POSTED

about 1 hour ago

DEADLINE

in 8 days
NAICS: 541330
New
SLED
Carrell Canal Closed Drainage Design
Solicitation # RSQ 26-031
The City of Fort Myers is soliciting qualifications under RSQ 26-031 for a consultant to provide design plans to replace the existing open Carrell Canal, located between US 41 and the Ten-Mile Canal, with a closed drainage system. The project scope includes the design of a permanent emergency pumping station south of Palm Avenue near the Ten-Mile Canal and a 12-foot-wide asphalt multi-use path. The design must align with the findings of the Carrell Canal Drainage Study Report dated January 22, 2020. Required services encompass overall project management, composite boundary and topographic surveying, subsurface utility investigations, and supplemental geotechnical investigations. Submittals must be uploaded as a single signed PDF via the OpenGov portal by October 28, 2026, at 2:00 pm EST. The City will award the contract to the top-ranked consultant based on a points-based evaluation focusing on firm experience and personnel qualifications, project approach, Minority Business Enterprise compliance, and local vendor preference. Selected consultants must meet mandatory minimum qualifications and provide comprehensive insurance coverage. While construction estimates for the project range from 8.2 million to 9.9 million dollars, the professional services fee will be established through negotiations following City Council approval.
Engineering (Public Works)

POSTED

about 5 hours ago

DEADLINE

in 33 minutes

AI Contract Overview

Show more

The contract involves providing assistance in sensor replacement within an existing network infrastructure, with a focus on maintaining current components such as cables, connectors, and telemetry systems while expanding the network to include new wells. The primary goal is to facilitate sensor swaps and replacements without the need for extensive infrastructure development or new procedures, ensuring compatibility with existing telemetry systems and avoiding additional software purchases. Equipment used must be compatible with the In-Situ brand or an approved equivalent, and must be capable of fitting within the current network architecture, including the deployment of new cabling and connectors as needed for damaged equipment. The contract emphasizes seamless integration, operational consistency, and minimal disruption to ongoing data flow and maintenance routines. The solicitation, titled "Sensor Replacement," was posted by the Oklahoma Water Resource Board with a response deadline of June 26, 2024. The project size is estimated between $500,000 and $1,500,000. The contract aims to ensure that sensor replacements and network expansions are achieved efficiently, leveraging existing telemetry and data management systems without requiring significant new investments or procedural changes. The procurement process involves submitting detailed bidder information, including company registration, certifications, and compliance with relevant regulations, with specific forms and documentation required to demonstrate eligibility. The overarching objective is to secure a contractor capable of delivering compatible, reliable sensor replacement solutions that align with the current infrastructure and operational requirements of the agency.

General Info

Agency

Oklahoma Water Resource Board

Place of Performance

OK, USA

Set-Aside

NONE

Documents

7

Attachment A - Telemetry Solicitation for Oklahoma Water Resources Board

DOCX, High priority: read this firstcontract-document
High

Attachment B - State of Oklahoma General Terms

PDF, High priority: read this firstcontract-document
High

Attachment C - Agency Terms for Oklahoma Water Resources Board Contract

PDF, High priority: read this firstcontract-document
High

OMESFormCP004 Certification Statement for Competitive Bids and Contracts

PDF, High priority: read this firstcertification-statement
High

OMESFormCP076 Certification for Competitive Bid and Contract

PDF, High priority: read this first2 pages · certification-form
High

Solicitation EV00000478 Bidder Instructions for Telemetry Equipment

PDF, High priority: read this firstbidder-instructions
High

Attachment D - Oklahoma IT Terms

PDF, Low prioritycontract-document
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOklahoma Water Resource Board
Contacts1 person available
OfficeN/A
Organization / Agency
Oklahoma Water Resource Board
Office AddressN/A
Contacts

Full Description

Show more
Assist in the process of replacing sensors while maintaining the existing parts of the deployments (cables, connectors, telemetry, etc.) and expanding the network to include new wells. There are very specific requirements for the section to achieve these goals. The main requirements are that equipment fit within the existing network without the need for extensive development of infrastructure or procedures. This includes the ability to swap and replace sensors onto existing cables/connectors to maintain the existing network and allow equipment to be moved between sites as needed. New cabling and connectors must also be able to be deployed to replaced damaged equipment. All new equipment must work with telemetry systems already in place and not require the purchase and installation of new equipment. Additionally, new equipment must not require the development of new data flow and maintenance procedures or require new software purchases. To meet these requirements, we believe In-Situ brand or an approved equal equipment is needed.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS