Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on December 5, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sentinel Utility Corridor, F.E. Warren Air Force Base, Wyoming

Closed
FA8219-24-R-UCFEWFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
North State And Hwy 101 Utility Infrastructure Boring Project
Solicitation # 26-02
The City of Ukiah, Department of Electric Utility, is soliciting bids for the North State and Hwy 101 Utility Infrastructure Boring Project (Solicitation #26-02). This project involves the installation of utility infrastructure through horizontal directional drilling (HDD) and trenching at North State Street and Highway 101 in Ukiah, California. The scope of work includes 1,375 linear feet of HDD and 142 linear feet of trenching, backfilling, and compaction. Key deliverables include the installation of various HDPE and PVC conduits ranging from 1.25 to 6 inches and the installation of six fiber service vaults. The contract will be awarded to the lowest responsive and responsible bidder based on the lowest Base Bid. Eligible bidders must possess a valid State of California Class A Contractor's License and be registered with the Department of Industrial Relations. Submission requirements include a detailed proposal with unit pricing, a Fair Employment Practices Certification, a notarized Non-Collusion Affidavit, and a statement of experience. Bids must be accompanied by a 10 percent bid security. Upon award, the contractor is required to provide a performance bond for 100 percent of the total contract price, as well as a payment bond and appropriate insurance certificates. The City will provide engineering personnel for inspections, and the contractor is responsible for ensuring all materials are stored to preserve quality and fitness for the work. The response deadline for this solicitation is December 1, 2026.
City of Ukiah

POSTED

about 14 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Broadband Implementation Project - FFA
Solicitation # 2001063
The Broadband Implementation Project - FFA, solicitation number 2001063, is a comprehensive infrastructure initiative for the City of San Luis Obispo, California. The project involves the installation of aerial and underground fiber optics, including directional boring for conduit, deep bore casing, and the installation of 288 CT fiber cable. The scope of work encompasses the placement of various sized vaults, copper clad ground rods, pole risers, down guys, anchors, and new wooden poles, as well as cut and kick operations for existing poles. Additional requirements include potholing, tree trimming, public notification, and strict compliance with CPUC grant reporting and archaeological monitoring. The project is structured with a base bid and five additive alternates covering specific street segments, with award decisions based on a total project bid hierarchy capped at 2,400,000 dollars. Contractors must adhere to stringent technical and regulatory standards, including CPUC General Order 95, Caltrans 2024 specifications, and the City of San Luis Obispo 2025 Engineering Standards. Key requirements include the submission of OTDR bi-directional testing results prior to acceptance and the employment of directional drilling personnel with at least two years of experience. Bidders must provide a bid guaranty of 10 percent of the bid amount and, upon award, provide performance and payment bonds equal to 100 percent of the contract price. Compliance with California Labor Code is mandatory, requiring registration with the Department of Industrial Relations and adherence to prevailing wage laws. Sealed bids are due by 11:00 a.m. on November 19, 2026, to the Public Works Administration Office in San Luis Obispo.
City of San Luis Obispo

POSTED

about 14 hours ago

DEADLINE

in 30 days
NAICS: 237130
New
SLED
24-17.11
Solicitation # 24-17.11
The City of Piqua, Ohio, is soliciting bids for Project No. 24-17.11, which involves the construction of the Washington Road 69kV Transmission Line. The scope of work includes the furnishing and installation of approximately 2.0 miles of 69kV transmission line terminating at a new 69kV/13.8kV substation. Key technical requirements include a 12.47kV distribution underbuild from Pole P1 through Pole P18, the installation of all-dielectric self-supporting fiber optic cable along the entire line, and the use of both contractor-furnished materials and owner-furnished self-supporting steel poles. The project has an engineer's estimate of $1,900,000 and requires adherence to the National Electrical Safety Code and various ASTM standards for ductile iron poles and fiberglass crossarms. Bidders must provide evidence of financial and performance experience and are required to submit a bid bond of at least 10% of the total bid amount. The successful contractor must post a combined performance and payment bond for 100% of the contract value. Compliance with State of Ohio Prevailing Wage laws, the Americans with Disabilities Act, and Drug-Free Workplace certifications is mandatory. Bids must be submitted via Bid Express, email, or sealed hard copy by October 29, 2026. All equipment must be delivered FOB Destination to the City of Piqua, and any bids specifying FOB Factory will be rejected.
City of Piqua

POSTED

1 day ago

DEADLINE

in 9 days
NAICS: 237130
New
SLED
24-17.10
Solicitation # 24-17.10
The City of Piqua, Ohio, is soliciting bids for project 24-17.10, which involves the electrical construction of the Piqua 69kV The Site Substation. With an engineer's estimate of $1,310,000, the scope of work includes furnishing and installing major equipment such as liquid-filled step-down transformers, circuit breakers, and switches, as well as the construction of 69kV incoming, switch, metering, and bus support structures. The contractor is responsible for comprehensive site work, including minor clearing, excavation, structural fill, grounding for all equipment, and the installation of above-ground conduits. The project also requires assistance with the start-up and commissioning of all mechanical, electrical, and electronic systems. Bidders must adhere to strict compliance standards, including State of Ohio Prevailing Wage laws, the Americans with Disabilities Act, and Drug-Free Workplace certifications. A bid bond of no less than 10 percent is required, and the successful contractor must provide performance and payment bonds equal to the full contract price. Award selection will be based on a comparison of relative merits and the lowest and best bid. Technical execution must follow NESC, NEC, IEEE, and ANSI standards, with specific quality controls for concrete foundations and equipment shipment integrity. Performance penalties of $500 per calendar day apply for deliveries exceeding the designated completion date.
City of Piqua

POSTED

1 day ago

DEADLINE

in 9 days

General Info

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

Hill AFB, UT, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

Response deadline changed from Dec 10, 2024 to Dec 17, 2024. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8219 Afnwc Pzbg
Contacts2 people available
OfficeHILL AFB, UT, 84056-5837, USA
Office AddressHILL AFB, UT, 84056-5837, USA

Full Description

Show more
5 December 2024 Update: The deadline for replies has been extended from 10 December 2024 to 17 December 2024. Further, the place of performance for this project is as in the below description. Due to technical difficulties in the SAM system, the place of performance listed in the general information section of this notice was listed as Hill AFB. However, the actual place of performance is F.E. Warren missile fields located in WY, NE, and CO as per this description. Thank you _______________ Original Descripton with updated reply date is below. . . This Sources Sought Notice is being issued for informational purposes only as market research to determine the availability, capability, and interest of firms for a potential Government requirement. This is not a request for proposal. It does not constitute a solicitation and shall not be construed as a commitment by the Government. Responses in any form are not offers and the Government is under no obligation to award a contract as a result of this announcement. No funds are available to pay for preparation of responses to this announcement. Any information submitted by respondents to this sources sought synopsis is strictly voluntary. Responses will be used to determine potential acquisition strategies, understand current market capabilities, and to gain knowledge of potential sources. GENERAL SCOPE: The Air Force Nuclear Weapons Center anticipates a potential requirement for military construction (MILCON) of a Sentinel Utility Corridor at FEW AFB missile fields located within Wyoming (WY), Colorado (CO) and Nebraska (NE). This requirement is anticipated to be accomplished as a design-bid-build (DBB) project delivery method. The project execution window is currently anticipated between 2026-2029. This is a mission-critical effort to install/construct an estimated 1600-2000 miles of utility corridors. This project may include installation of conduits (trenching, boring, direction drilling), communication lines, construction of pull vaults and manholes, and boring under roadways, rivers, railways, etc. and the purchase/installation of the communications media. All facilities and utility systems will be permanent construction in accordance with applicable Department of Defense Unified Facilities Criteria, including but not limited to 1-200-01, General Building requirements and 4-010-01 Antiterrorism/Force Protection requirements. Additionally, the Utility Corridor will be equipped with water intrusion/control measures. Additional information about the program can be found in the Final Environmental Impact Statement (FEIS) which is located here: https://www.afgsc.af.mil/Sentinel/Environmental-Impact-Statement/ In accordance with Defense Federal Acquisition Regulation Supplement (DFARS) 236.204(v), the Government currently estimates the magnitude of construction for the potential project is over $500,000,000. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 237130 Power and Communication Line and Related Structures Construction. The small business size standard for the NAICS, as established by the U.S. Small Business Administration, is $45,000,000 annual revenue. The Product Service Code for the potential requirement is anticipated to be Y1NZ, Construction of Other Utilities. If there is a reasonable expectation that at least two (2) responsible small business concerns under this NAICS can provide the anticipated services at fair market prices, the Contracting Officer is required to set the acquisition aside for small business concerns. If competition is set-aside for small businesses, Federal Acquisition Regulation 52.219-14, Limitations on Subcontracting, requires that general construction small business Contractors self-perform at least twenty-five percent (25%) of the cost of the contract, not including the cost of materials. If no set aside is made and the requirement is competed with full and open competition, and the awarded Contractor is not a small business, the Contractor will be required to self-perform the percentage of work identified in the solicitation under FAR 52.236-1, Performance of Work by the Contractor. Contractors with the skill, capabilities, workload capacity, and ability to obtain bonding to complete the project described above (either through self-performance and/or Subcontractor management) are invited to provide capability statements to the primary point of contact listed below. Since information received from this sources sought synopsis will be used to make acquisition decisions, both small businesses and other than small businesses are encouraged to submit Capability Statements. CAPABILITY STATEMENT: Responses must be limited to sixteen (16) 8.5 x 11 inch pages with a minimum font size of point 12. Please provide the following information: 1) Company name, System for Award Management Unique Entity Identification number (SAM UEID) or Employer Identification Number (EIN), CAGE, address, point of contact name, contact phone number, contact e-mail address, and statement identifying whether the company employs union or non-union workers. 2) Experience and capability to complete contracts of similar magnitude and complexity to the potential requirement, including up to five (5) examples of comparable work performed within the past ten (10) years. Comparable work performed is work which shows experience and capabilities in construction/renovation of long-haul telecom networks A) in a rural environment with frost and/or plow depth considerations B) utilizing horizontal directional drilling/boring and trenching C) requiring coordination with private and public (Federal, State, County or City governments) landowners For each example, please include A) Project name, location, detailed description of the project, description of the work performed (identification of self-performance and/or Subcontractor management); B) Customer name, customer satisfaction; C) Start and end dates of construction work, and whether the project was completed on time; D) Projects Initial Cost Estimate vs. Actual Final Cost; E) Number of craft trades present on the project; F) Whether there were any challenges experienced during the project (delays, investigations, health and safety issues, labor shortages, management/organizational issues, etc.); and G) Whether a Project Labor Agreement (PLA) was used (see the PLA survey section below) 3) Business size and socioeconomic type for NAICS 237130 (ex: Woman-Owned Small Business, Serviced-Disabled Veteran-Owned Small Business (SDVOSB), Veteran-Owned Small Business (VOSB), certified Historically Underutilized Business Zone (HUBZone), 8(a) Participant, small business, or other than small business (large business)). 4) Bonding capability of both single project and aggregate (in the form of a Surety letter). 5) PLA Survey. A PLA is a pre-hire collective bargaining agreement with labor organization(s) that establishes the terms and conditions of employment for a specific construction project. Pursuant to Executive Order 14063, Use of Project Labor Agreements for Federal Construction Projects, agencies are mandated to use PLAs for large-scale construction projects (defined as projects where the total cost to the Government of the project is estimated to be at least $35,000,000.00) unless exempted by the agency Senior Procurement Executive. A) Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation. B) Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible. C) Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible. D) Identify specific reasons why or how you believe a PLA would advance the Federal Government's interest in achieving economy and efficiency in Federal procurement. E) Identify specific reasons why you do not believe a PLA would advance the Federal Government's interest in achieving economy and efficiency in Federal procurement. F) Identify any additional information you believe should be considered on the use of a PLA on the referenced project. G) Identify any additional information you believe should be considered on the non-use of a PLA on the referenced project. H) Have PLAs been used on similar projects undertaken by Federal, State, municipal, or private entities in the geographic area where work will be performed? If so, please provide contract number(s) and points of contact. I) Will multiple construction Contractors and/or Subcontractors employing workers in multiple crafts or trades be required to complete the anticipated work? J) Is it difficult to recruit or retain a skilled workforce in the anticipated work location? K) Do you think completion of the project will require an extended period of time? L) Do you anticipate any unique, compelling, time-sensitive issues, or other schedule requirements to complete the anticipated work (aside from those already noted) or that would affect the rate at which the anticipated project could be completed? If so, please elaborate and provide supporting documentation where possible. M) Are you aware of any other large-scale projects begin completed in the area during the anticipated period of performance? N) Do you think requiring a PLA will increase contract costs or contribute to cost savings? Why or why not? How? O) How do open shop and union wage rates influence prevailing wage rates in the local market area? How does unionization in the local market impact wages? Please provide supporting documentation. P) Do you think requiring a PLA will increase contract risk? Why or why not? How? Q) If you have previously been party to a PLA, approximately how long did it take to negotiate the terms of the PLA? Did PLA negotiation delay construction start? If so, by how long? R) Any other information you think should be considered regarding the use of PLAs for the anticipated project. Please submit all capabilities statements, information, brochures, and/or marketing material as one (1) document, limited to the page maximum above. Responses will not be considered an offer, proposal, or bid for any solicitation that may result from this Notice. Moreover, responses will not restrict the Government to an acquisition approach. This Notice is for information and planning purposes only. Respondents will not be notified of the results of any review conducted or the capability statements received. Please provide responses and/or questions by e-mail to Peggy Japngie Lizotte at peggy.japngie_lizotte.1@us.af.mil and Britanie Butler at britanie.butler@us.af.mil no later than 2:00 PM MST, 17 DECEMBER 2024. Please include in the e-mail subject line the Sources Sought Notice number and project title, - FA8219-24-R-UCFEW - Sentinel Utility Corridor, F.E. Warren Air Force Base, Wyoming. Hard copies (hand delivered or mailed) or telephone inquiries will NOT be accepted.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS