Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on June 12, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Septic-to-Sewer Remediation 6A - North (Lift Station Replacement)

Closed
ITB-09427State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was initiated following a sprinkler system failure that caused significant water damage. The scope of work requires the remediation of the entire building, including cleaning visible mold from CMU walls, concrete floors, and vinyl tiles, as well as the removal and replacement of affected drywall, gypsum wallboard, and acoustical tile ceiling finishes. Additionally, the contractor must clean or replace damaged theater seating cushions and perform dehumidification to maintain humidity levels at or below 50 percent. All work must adhere to ANSI/IICRC S520 standards, EPA guidelines, OSHA regulations, and the findings of the Micro Air Inc. Mold Testing report dated April 11, 2024. The contract is a single lump sum award based on best value, with evaluation weights distributed across price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Key requirements include the provision of a Certified Industrial Hygienist for verification and final clearance, a detailed remediation plan featuring HEPA filtration and negative air pressure, and compliance with Davis-Bacon Act wage determinations. Bidders must hold a valid Indiana Contractor's License and provide proof of automobile and workers compensation insurance, naming Adams and Associates, Inc. as an additional insured. Proposals must be submitted on company letterhead and include a detailed cost breakdown, a timeline for substantial completion, and a 90-day bid guarantee. Work must commence within 14 days of the Notice to Proceed, and payment is issued on Net 30 terms.
Atterbury Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The project involves the complete demolition and reconstruction of Lift Station 191 located at 2169 Lakeridge Drive, Winter Haven, Florida. The scope includes removing existing wetwell components, pumps, valves, control panels, and associated infrastructure, followed by constructing a new, deeper duplex lift station that meets current city standards. The new station will feature two 7.5 HP pumps, modern control and electrical systems, and an 8-foot diameter concrete wet well. Additionally, the project entails installing new influent and future manholes to accommodate upcoming sewer infrastructure, as well as connecting to the existing discharge force main. Portions of the existing driveway will be demolished and replaced, and temporary bypass systems will be implemented to maintain continuous wastewater flow during construction, given the active nature of the sewer system. Bidders are invited to respond to this solicitation, titled "Septic-to-Sewer Remediation 6A - North (Lift Station Replacement)," posted by the City of Winter Haven under solicitation number ITB-09427. The project has a budget range between $500,000 and $1,500,000, with responses due by July 15, 2024. The contract involves services under NAICS code 562910, focusing on sewer line and lift station remediation. The primary contact for inquiries is Keri Sorensen, reachable via email at k [email hidden] or by phone at [phone hidden]. More details and the bid documents are available on the Florida Marketplace website.

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

1

ITB-24-30 Septic-to-Sewer Remediation Area 6A - North (Lift Station Replacement)

PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → City of Winter Haven
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
FULL BID DOCS AVAILABLE ON CITY WEBSITE - mywinterhaven.com The project consists of the demolition of most of the components of the existing Lift Station 191 (LS 191), and construction of a new LS 191 at the same location. Project is located at 2169 Lakeridge Dr., Winter Haven, FL 33881 LIFT STATION 191 Project Details.The demolition includes the existing wetwell, pumps, valves, valve vaults, control panels, influent manhole, and discharge piping. There will be the requirement for portions of the existing concrete driveway to be demolished and replaced. The new lift station will be located at the same location as the existing lift station but will be deeper and conform to current City standards/specifications. The new lift station will be a duplex lift station with two (2), 7.5 HP, pumps, control panels, instrumentation and control systems, electrical panels, conduit, wire; an 8-foot inside diameter concrete wet well, discharge piping, valves, fittings, and a connection to the existing discharge force main. The work also includes construction of a new manhole on the northwest portion of the site to receive sanitary flows in a future phase and a new influent manhole to collect a proposed new gravity sewer main from the north and the existing sanitary sewer main and flows from the south. A portion of gravity sewer main will be installed as a part of this project. The existing driveway will be required to have sections removed and replaced as a part of the project. Temporary bypass of the existing sewer will be required as this is an active wastewater collection system and flows must be maintained.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS