Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Serenade II – Tentative Tract Map No. 6531 Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Sanger

NAICS

541370 - Surveying and Mapping (except Geophysical) ServicesView NAICS

Place of Performance

North Avenue to the north, Bethel Avenue to the west, and Greenwood Avenue to the east, Sanger, CA, 93657

Set-Aside

NONE

Documents

(6)

Serenade II Notice of Intent to Adopt Mitigated Negative Declaration

PDFspecial-notice

Summary Form for Serenade II Tentative Tract Map No. 6531 Project

PDFenvironmental-summary

Serenade II Tentative Tract Map No. 6531 Notice of Completion

PDFnotice-of-completion

DTSC Comments on Serenade II Tentative Tract Map No. 6531 MND

PDFcomment

Serenade II Tentative Tract Map 6531 Initial Study and Mitigated Negative Declaration

PDFmitigated-negative-declaration

Serenade II Residential Project Small Project Analysis Level June 2025

PDFsmall-project-analysis-level

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Sanger
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Sanger
Office AddressN/A
Contacts
Jaymie BrauerPrincipal Planner

Full Description

Show more
The Project proposes a 48-lot single-family residential subdivision (TTM 6531) at approximately 5,000 square feet per lot, located within the city limits of the City of Sanger. On- and off-site improvements including internal circulation roads, interior local streets, curb, gutter, sidewalk, and landscaping are proposed as a part of the Project. Water and sewer utilities will be provided by the City. All residential units will be equipped with 450- watt solar panels manufactured by Canadian Solar, utilize all electric appliances and will be EV-ready (pre-wired during construction to allow for the future installation of EV residential charger). The site is currently designated as Residential Medium Density pursuant to the Sanger General Plan Land Use Map. The site is zoned R-1-6 (Single-Family Residential, 6,000 square foot minimum lot size) under the Sanger Zoning Ordinance. The existing General Plan land use has a density requirement of 7.3–17.4 units per acre. Due to the overall size of the Project site and adjacent developments to the east and west, the parcel cannot be developed to meet the General Plan land use density, zoning regulations, and right-of-way dedication requirements. Therefore, a General Plan Amendment to Low Medium Density Residential and a rezone to the R-1-7.5 Zone District is necessary to accommodate development of the site. The density requirements for the R-1-7.5 and Medium Low-Density Zone District is 4.5 to 5.8 units per gross acre. Due to the layout of the Project and the minimum standards of the underlying zone district (minimum parcel size of 7,500 square feet), a Planned Unit Development (PUD) will be required in order to approve and develop the Project. Deviations from the zone district standards will include setback, lot width, lot depth, and lot size. The following discretionary entitlements are required for the proposed Project: • General Plan Amendment to the Sanger General Plan to change the land use designation of the Project site from Medium Density Residential to Low-Medium Density Residential. • Zone Change from the R-1-6 zone district to the R-1-7.5 zone district. • Conditional Use Permit for a Planned Unit Development to deviate from the R-1-7.5 development standards for yard setback, lot width, lot depth, and lot size. • Tentative Tract Map Approval. Construction of the residential development would occur over a maximum of 12 to 18 months. It is anticipated that the following pieces of equipment would be used during construction activities: • Roller • Loaded trucks • Excavator • Generator • Service truck • Air compressor

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS