Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on August 20, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Setting Of 11 Large Steel Transmission Poles, Substation Pier Foundations, Sidewalk/Railing Realignment And Construction Assistance For The New 69Kv Transmission Line

Closed
2024-ITB-294State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves a comprehensive scope of work aimed at enhancing the electrical infrastructure at the Dranefield Substation and surrounding areas. The contractor is responsible for installing eleven large steel transmission poles and constructing two pier foundations at the substation. Additionally, the project includes removing and realigning the sidewalk and railing at the W Pipkin Bridge to improve safety and accessibility. The contractor will also assist Lakeland Electric crews with the removal and installation of additional poles as needed to support the new 69kV transmission line. All management, supervision, tools, construction equipment, and labor necessary to complete the work are to be provided by the contractor, while the owner supplies all materials. This project is solicited under the number 2024-ITB-294, with a posting date of August 20, 2024, and a response deadline of September 19, 2024. The contract size is estimated between $500,000 and $1,500,000. The work will be performed in Florida, with the primary point of contact being Linda Alspaugh. The project is managed by Lakeland Electric’s Engineering department, and interested parties can find more details through the provided procurement link.

Documents

8

2024-ITB-294: 69kV Transmission Line Construction Assistance

PDF, High priority: read this firstitb
High

C-CLC-CLKSUSB-00001: Design of Drilled Pier Foundation for 69kV Take-Off Tower

PDF, High priority: read this firstspecifications
High

DF to Hamilton 69kV Construction Specifications

PDF, High priority: read this firstspecifications
High

Lakeland Electric 69KV Transmission Line Construction Plans

PDF, High priority: read this firstspecifications
High

Indemnification Agreement for Contractor - City of Lakeland 2024

DOC, Low prioritycontract-document
Low

Permit 15.10.1.23 - County Line Rd Power Distribution

PDF, Low prioritypermit
Low

Permit 15.11.1.23 - W. Pipkin Rd Utility Installation

PDF, Low prioritypermit
Low

DF_SUBSTATION_FOUNDATION_Aerial.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → LE - Engineering
Contacts1 person available
OfficeN/A
Organization / AgencyFlorida → LE - Engineering
Office AddressN/A

Full Description

Show more
The intent of this bid is to have the Contractor install 11 large steel poles, install two (2) pier foundations at the Dranefield Substation, remove and realign sidewalk/railing at the W Pipkin Bridge and assist Lakeland Electric crews with removing and installing additional poles as needed. The Contractor shall provide all management, administration, tools, construction equipment, labor and supervision to accomplish the work as specified herein and on the Construction Drawings.  Materials will be furnished by the Owner. 

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS