This Government Contract opportunity from California was posted on December 11, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Seven (7) Booster Vertical Turbine Pump Assemblies
Awarded
RFB 239-2025State & LocalSubmission Closed
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
Procurement Department of Rancho California Water DistrictView Agency
Contract Value
$62,055.48NAICS
N/A
Place of Performance
42135 Winchester Road Temecula, California 92590, CA, USSet-Aside
NONE
Awardee
Well Tec Services Inc.View Profile
Award Issued Date
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
PhaseAwarded
Submission Closed
Organization & Contact Information
Show more
AgencyProcurement Department of Rancho California Water District
Contacts1 person available
OfficeCA, US
Office AddressCA, US
Contacts
Full Description
Show more
Scope: Rancho California Water District (“District”) is soliciting quotations for the furnishing, assembly, and delivery of seven (7) new NSF-61 compliant short-set booster vertical turbine pump assemblies across multiple booster station sites. Installation will be performed by District personnel; however, the awarded contractor must attend all startup procedures and testing as part of warranty verification, consistent with the approach outlined in the template RFB The District operates and maintains more than fifty (50) groundwater production wells and 20 pumping stations, which are critical to ensuring a reliable water supply for its customers. These seven (7) boosters are part of key facilities within this system and are currently undergoing rehabilitation to restore its production efficiency and extend its operational lifespan.
These booster stations serve essential distribution system functions, and the replacement pump assemblies must meet strict hydraulic, dimensional, material, and NSF 61 compliance requirements.
All assemblies must be fully inspected and tested prior to delivery according to manufacturer standards. Contractor-provided as-built drawings and discharge head CAD files must be approved by the District prior to fabrication and shipment, as required in the 7-Booster Submittal.
These booster stations serve essential distribution system functions, and the replacement pump assemblies must meet strict hydraulic, dimensional, material, and NSF 61 compliance requirements.
All assemblies must be fully inspected and tested prior to delivery according to manufacturer standards. Contractor-provided as-built drawings and discharge head CAD files must be approved by the District prior to fabrication and shipment, as required in the 7-Booster Submittal.
