Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Seven Oaks Bridge Project (Notification of Lake or Streambed Alteration, No. EPIMS-SBR-61708-R6)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Fish and Wildlife, Region 6 - Inland Deserts, Ontario

NAICS

N/A

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 6 - Inland Deserts, Ontario
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 6 - Inland Deserts, Ontario
Office AddressN/A
Contacts
Arlene ChunEngineering Manager – Environmental Management
Julia CharpekEnvironmental Scientist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-SBR-61708-R6, pursuant to Section 1602 of the Fish and Game Code to San Bernardino County Public Works Department. The project is limited to installing a new bridge, slope protection measures (e.g., rock slope protection), and improving the roadway approaches. The permanent bridge and roadway approach have been designed to handle 100-year flood events. The project will require a temporary detour route to maintain ingress/egress for nearby residents, in water work consisting of installation of temporary culvert extensions to support the temporary road, and rerouting of the Santa Ana River to return the flow to its pre-storm alignment under the new permanent structure (approximately 60 feet to the northwest of the current flow). To minimize impacts to the Santa Ana River, water will continue to flow through the existing culverts that were installed during the emergency repairs. The water will be diverted back into its original alignment as part of the Project.

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS