Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Pennsylvania was posted on June 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sewer Main Lining Installation

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Lehigh County in Pennsylvania is seeking a subcontractor for a sewer main lining installation project. The scope of work involves the installation of cured-in-place pipe lining for main sewer lines to rehabilitate aging infrastructure using a trenchless method that eliminates the need for excavation. The opportunity was posted on June 30, 2025, and requires responses to be submitted by July 31, 2025. This project falls under NAICS code 238240 and will be performed within Lehigh County.

General Info

Lehigh County seeks a subcontractor for trenchless sewer main lining installation by July 31.

NAICS

238240

Place of Performance

Lehigh County, PA, USA

Set-Aside

NONE

Documents

This scope was carved out of 399925.004.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

2025 Sewer Main and Lateral Rehab Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Fire Protection and Sprinkler SystemsOpen now
  • Fire Protection and Sprinkler SystemsOpen now
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Lehigh County
ContactsNo contacts available
OfficeN/A
Organization / AgencyPennsylvania → Lehigh County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of cured-in-place pipe (CIPP) lining for main sewer lines to rehabilitate aging infrastructure without excavation.

More opportunities from Pennsylvania → Lehigh County

Same awarding agency

NAICS: 237110
New
SLED
Lower Nazareth Water System Improvements – Rt 33 Crossing
Solicitation # 261972
The Lower Nazareth Water System Improvements – Rt 33 Crossing project, managed by the Easton Suburban Water Authority, involves the installation of critical water main infrastructure in Lower Nazareth Township, Pennsylvania. The scope of work includes the construction of 295 lineal feet of 16-inch restrained joint ductile iron water main within a 30-inch steel encasement pipe, 1,550 lineal feet of 16-inch and 20 lineal feet of 12-inch ductile iron water main, and various appurtenances such as valves and manholes. Additionally, the contractor is responsible for incidental work, including seeding and pavement restoration within Township and PennDOT roadways. All work must adhere to strict technical standards, including ANSI A 21.51 for ductile iron pipe, ASTM A139 for steel pipe, and H 20 AASHTO live loading for conduits under highways. Bids must be submitted via the Pennbid platform by 10:00 a.m. on December 10, 2026, and must include a bid bond or certified payment of at least 10 percent of the bid total. The project is subject to the Pennsylvania Prevailing Wage Act and the Steel Products Procurement Act, with a strict requirement for non-discrimination. Performance and payment bonds are required upon award. The project timeline specifies that work under the PennDOT Highway Occupancy Permit must be completed by March 26, 2027, with substantial completion of all remaining work by May 14, 2027, and final completion by May 28, 2027. Payment is handled through an Application for Payment process, with a 10 percent retainage held until the contract is 50 percent complete.
Water and Sewer Line and Related Structures Construction

POSTED

7 days ago

DEADLINE

in 23 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS