SEWPCC & WEWPCC Sludge Holding Tanks Refurbishment

Closed
7-2026International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
PIDC Project 1 - Bldg. 3 plumbing, boiler, FA, painting and WWTP
Solicitation # 872281
Solicitation 872281, managed by the Bristol Alliance of Companies for U.S. Immigration and Customs Enforcement, covers a comprehensive series of infrastructure repairs and upgrades at the Port Isabel Detention Center in Los Fresnos, Texas. The project scope encompasses multiple critical systems, including the replacement of boilers across several buildings, the installation of a new fire alarm system in the dining facility, and extensive painting and surface repairs for 11 buildings. Additionally, the contract includes plumbing repairs for Multipurpose Building 3 and significant upgrades to the wastewater treatment plant infrastructure, specifically focusing on replacing worn valves, installing sewage grinders on the influent trough, and utilizing coastal weather resistant materials to ensure long term durability. The project is estimated to have a magnitude between 1.5 million and 2 million dollars and is issued as a task order to 8a MACC IDIQ offerors. Contractors are required to adhere to the TX20260236 wage determination for Cameron County and must comply with strict quality control, safety, and security requirements. The procurement process includes a mandatory site survey and a detailed pricing template broken down by CSI division. Key deadlines include a response deadline of September 10, 2026, with final proposals due by September 24, 2026.
Bristol Alliance of Companies

POSTED

about 12 hours ago

DEADLINE

in 15 days
NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes the installation of trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities, as well as the construction of flow control facility components and site improvements. Additional requirements encompass pavement removal and restoration, traffic control, utility coordination, disinfection, startup, and commissioning to ensure a complete and operational system. Garney Pacific, Inc. is soliciting quotes from subcontractors and suppliers for various trade scopes, including steel pipe welding, trenchless construction, electrical and instrumentation, and the supply of aggregates, ready-mix concrete, and steel pipes. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by September 18, 2026, at 2:00 PM PT. The project is open to various set-aside categories, including Small Business, Women-Owned Small Business, and HUBZone certified entities.
Garney Pacific, Inc.

POSTED

about 12 hours ago

DEADLINE

in 9 days
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids from MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the improvement of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of approximately 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and the treatment of approximately 1.7 acres of impervious surface within a 3.3-acre drainage area. Additional requirements include necessary drainage, underdrain, inlet, pipe, and downspout work, as well as limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor. Landscaping requirements specify the planting of six native trees and approximately 345 native plants or approved equivalents, concluding with final stabilization, cleanup, and restoration. This opportunity is open to various small business designations, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, who are encouraged to form consortiums if individual bid items are too large for a single entity to manage. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties must provide their company name and contact information along with a clear indication of their intent to bid. The primary point of contact for this solicitation is Jennifer Wilson, with administrative coordination handled by Jonah Leith.
Harbel, Inc.

POSTED

about 12 hours ago

DEADLINE

in 7 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as 54 and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, surface restoration, and the excavation of cobbles and large boulders. This solicitation is open to small businesses, including certified SDVOSB, MBE, and WBE firms, with a bid submission deadline of September 29, 2026. James W. Fowler Co. is providing support to M/W/DBE subcontractors regarding bonding, insurance, and material procurement, and encourages the use of apprentices for the project.
James W. Fowler Co.

POSTED

about 12 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The contract outlines the comprehensive refurbishment of sludge holding tanks at two facilities, WEWPCC and SEWPCC. At WEWPCC, the work involves isolating and rehabilitating each of three tanks one at a time, coordinating with plant staff to maintain operational capacity of the remaining tanks. Key activities include scaffolding, selective concrete demolition, cleaning, replacement of process pipe penetrations, structural upgrades, instrumentation replacement, and application of protective liners by certified applicators. Additional tasks include specific replacements and installations for the middle tank, coordination for a fast-curing polyurethane cement floor coating applied across all tanks simultaneously, adherence to confined space safety protocols, and responsibility for site safety programs and inspections. At SEWPCC, two of the three tanks will be taken out of service simultaneously for rehabilitation following a strategic sequencing plan. The scope is broader, including demolition of part of the masonry block room above the tanks, salvage and reinstallation of equipment and instrumentation, structural and concrete repairs, ventilation upgrades, and a complete restoration of the masonry room once work is complete. The contract also mandates strict control measures to protect structural integrity and prevent damage during demolition and rehabilitation, with requirements for mechanical HVAC upgrades and compliance with safety, curing, and coordination procedures. The total pre-bid cost estimate is $9 million, including a cash allowance for additional work, emphasizing the scale and complexity of this critical infrastructure renewal project.

General Info

Refurbishment of sludge tanks at WEWPCC and SEWPCC with structural, mechanical, and safety upgrades.

Agency

Government of Canada → City of WinnipegView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → City of Winnipeg
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → City of Winnipeg
View Agency Profile
Office AddressN/A
Contacts
Drew MurrayContracting Authority

Full Description

Show more
D2. SCOPE OF WORK D2.1 At WEWPCC, the Work to be done under the Contract shall consist of isolating one (1) of the three (3) sludge holding tanks at a time in coordination with plant staff such that the other two (2) tanks may be used as normal, and then for each tank, one at a time, the work includes: (a) Scaffolding and formwork as required to perform the work below. (b) Selective demolition of surface concrete within the tank. (c) Cleaning the tank. (d) Replacing the process pipe penetrations of the tank and adding new 200mm penetrations to be used for temporary tank ventilation requirements during construction. (e) Structural upgrades and concrete and rebar installation and replacement. (f) Instrumentation replacement. (g) Surface preparation of the tank interior and pipe penetrations, and application of a protective liner by a certified applicator. (h) Curing controls for concrete repairs and liner according to manufacturer’s requirements, (i) For the middle tank, replacement of steel mud baskets in the truck bay floor drain and installation of a new stainless-steel pipe (complete with hangers) connection through the wall of the tank to a rainwater leader drainpipe leading to a sump pit below. (j) Surface preparation and application of a fast-curing polyurethane cement floor coat on the top face (truck driving surface) of the top slab of the tanks such that the delay in truck loading does not cause tanks to over-fill. This must be coordinated with plant staff. This shall be done all at once rather than on a per-tank basis. (k) Coordination with the Contract Administrator, Plant Staff, and Wintec (sludge trucking contractor) as required. (l) Implementation of confined space safety controls and protocols for working within the sludge tanks. (m) Being responsible for the site safety program and accommodating inspections by the Contract Administrator. (n) Redline as-built markups. D2.2 At SEWPCC, the Work to be done under the Contract shall consist of isolating two (2) of the three (3) sludge holding tanks at a time in coordination with plant staff and the below sequencing plan. For each tank, the work includes: (a) The tank top slab has been delineated into three rehabilitation sections as shown on the drawings. Strategic rehabilitation sequencing of tanks must be followed. (b) Scaffolding, shoring, and formwork as required to perform the work below. (c) Selective demolition of concrete tanks according to the contract drawings. (d) Demolition of the masonry block room above the tanks on the northeast corner of the main floor (only south and west walls need to be demolished as long as roof is adequately supported) and salvaging the equipment within for continued use, coordinating new location of equipment with Contract Administrator and plant staff. (e) Salvaging other equipment and instrumentation on and in the tank top slab for re-installation including high-level float switches, ultrasonic level transducers, the Magikist Hot Water Pressure Washer with all ancillary equipment, and the exhaust fan and ducts at the northwest corner on the main floor. Salvage equipment for re-installation. (f) Cleaning the concrete sludge holding tanks. (g) Replacing the process pipe penetrations and ventilation duct penetrations of the tanks. (h) Replacement hatches and removal of ladders. (i) Structural upgrades and concrete and rebar installation and replacement according to contract drawings. (j) Surface preparation of the tank interior and pipe penetrations, and application of a protective liner by a certified applicator. (k) Curing controls for concrete and liner according to manufacturer’s requirements, (l) Coordination with the Contract Administrator, Plant Staff, and Wintec (sludge trucking contractor) as required. (m) Implementation of confined space controls and protocols for working within the sludge tanks. (n) Re-construction and installation of masonry room above the sludge holding tanks and re-installation of all equipment within it. (o) Re-installation of salvaged equipment above the tanks and instrumentation within the tanks, including high level float switches, ultrasonic level transducers, the Magikist Hot Water Pressure Washer with all ancillary equipment, and the exhaust fan and ducts at the northwest corner on the main floor. (p) Being responsible for the site safety program and accommodating inspections by the Contract Administrator. (q) Mechanical HVAC upgrades according to contract drawings. These upgrades may be completed separately from sludge holding tank rehabilitation work. (r) Surface preparation and application of a polyurethane cement floor coat on the top face of the top slab of the tanks. This shall be done all at once rather than on a per-tank basis, (s) Special Conditions: (i) Contractor must take precautions to control debris and demolish tanks top slab in such a way as to mitigate risks to the tanks, pipework, or transfer pumps connected to the base of the tanks. (ii) Construction sequence on drawing 1-0102-SGAD-DD53 must be followed to avoid compromising structural integrity of the tanks and surround building structural systems. (iii) Interior tank walls are compromised. Contractor must install a protective barrier on Tank 2 north wall during Tank 2 and Tank 3 rehabilitation to prevent water jetting or other rehabilitation work until after Tank 1 is taken out of service. (t) Redline as-built markups. D2.3 The following shall apply to the Services: (a) Universal Design Policy http://clkapps.winnipeg.ca/DMIS/DocExt/ViewDoc.asp?DocumentTypeId=2&DocId=3604 D2.4 The Class 1 pre-bid cost estimate for the Work is $9,000,000.00 ($8,250,000.00 + $750,000.00 Cash Allowance for Additional Work).Bidding and Documents are available on http://www.merx.com. Fees may apply; See https://www.merx.com/public/pricing for more information.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS